MODERN Final Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v3.7
MODERN 1 st Year Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4
-
Upload
aladdin-delaney -
Category
Documents
-
view
23 -
download
0
description
Transcript of MODERN 1 st Year Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4
MODERN 1st Year Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4
WP1: Giuliana Gangemi WP2: André Juge
WP3: Wilmar Heuvelman WP4: Davide Pandini
WP5: Loris Vendrame
Coordinator: Jan van Gerwen
Date: June 22, 2010 (09.30 - 17.00 hrs)
Review period: 2009-03-01 : 2010-02-28
2CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Agenda
General information (JvG)– Objectives– Consortium– Resources planned and used– Overview of deliverables and milestones status– Cooperation, dissemination and exploitation– Project management: progress, funding problems and amendments– Other issues, Q&A
For WP1 (GG), WP2 (AJ), WP3 (WH), WP4 (DP) and WP5 (LV)– Relationship between workpackages– Progress, highlights and lowlights– Technical status and achievements of deliverables (incl. changes)– Cooperation– Dissemination (publications, patents), exploitation– Other issues, Q&A
3CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Objectives
The objective of the MODERN project is to develop new paradigms in integrated circuit design that will enable the manufacturing of reliable, low cost, low EMI, high-yield complex products using unreliable and variable devices.
Specifically, the main goals of the project are: Advanced, yet accurate, models of process variations for
nanometre devices, circuits and complex architectures. Effective methods for evaluating the impact of process variations
on manufacturability, design reliability and circuit performance. o Reliability, noise, EMC/EMI.o Timing, power and yield.
Design methods and tools to mitigate or tolerate the effects of process variations on those quantities applicable at the device, circuit and architectural levels.
Validation of the modelling and design methods and tools on a variety of silicon demonstrators.
1
23 4 5
Layout and strain induced variability (Synopsys)
4CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Consortium
The MODERN Consortium features strong competence and expertise in the field of advanced technologies, with a well-balanced participation between Large Industries, SMEs, Research Centres and Universities from all over Europe.
9 Countries28 Partners
5CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Resources planned and used
Work
Package
Title
9 1 4 2 26 4 20
58 5 5 6 6 30 6
107 6 19 18 7 12 17 7 4 6 1256 20 7 13 160
639 19 54 84 60 24 42 48 18 48 23 32 12 174
198 0 16 5 12 6 70 18 19 4 8 15 18 7137 15 5 12 6 68 6 18 7
0730 44 36 13 24 18 204 66 102 108 18 23 15 12 27 20
169 0 0 12 9 55 12 14 5 15 15 19 8 677 9 12 14 6 24 120
603 66 24 36 12 78 36 30 30 36 72 60 58 23 42
52 6 16 3 3 18 0 0 0 6 038 15 3 2 18 0 00
274 14 63 19 6 54 24 10 18 12 38 16
29 1 0 2 2 0 0 1 1 1 12 0 2 0 1 3 1 218 2 1 1 1 10 0 1 20
115 5 5 6 5 2 6 6 2 2 6 30 12 3 6 2 4 3 3 6
563 0 13 0 14 9 33 19 18 55 0 27 27 31 119 40 0 5 19 19 19 4 12 0 17 30 0 19 15331 0 0 0 0 9 32 0 20 0 0 27 27 32 114 0 0 0 0 24 0 6 0 0 0 0 0 19 21
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02,419 66 43 73 42 12 109 56 84 84 66 95 56 108 342 120 288 36 90 72 108 18 70 0 50 30 186 30 84
'(*) NOT FUNDED IN ITALY
TOTAL
Actual totalPlan total
Cum. Act. totalCum. Plan total
12. C
EA
-LE
TI
13. M
ontp
ellier
Labora
tory
26. V
ienna U
niv
ers
ity
15. N
um
onyx Ita
ly S
rl
16. (C
oord
inato
r) N
XP
-NL
18. P
olit
ecnic
o d
i Torino
19. S
TM
icro
ele
ctr
onic
s S
.r.l.
20. S
ynopsys S
witz
erland L
LC
22. T
IEM
PO
SA
S
21. T
hale
s S
A
28. U
niv
ers
ity o
f C
ala
bria
29. T
he U
niv
ers
ity o
f G
lasgow
23. D
elft
Univ
ers
ity
24. E
indhoven U
niv
ers
ity
25. G
raz U
niv
ers
ity
27. A
lma M
ate
r S
tudio
rum
31. U
niv
ers
itat P
olit
ecnic
a d
e C
ata
lunya
WP4
Architectural to system level:
modeling, analysis, and
Cum.Plan total
Planned total
WP1
Target technologies,
application domains,
WP2
Process/device to compact modeling
Cum. Act. total
5. T
ekla
tech
Physical/circuit to RT-level: PV-aware and PV-
robust
Actual totalPlanned total
Planned total
Cum. Act. totalCum.Plan total
Actual total
WP3
2. A
ustr
iaM
icro
syste
ms A
G
3. C
SE
M
4. E
lastix
PERIOD: m1 to m12
30. S
apie
nza U
niv
ers
ita d
e R
om
a
Cum. Act. total
6. In
fineon T
echnolo
gie
s
8. IM
EP
-LA
HC
Labora
tory
Actual total
10. In
tegra
ted S
yste
m D
evelo
pm
ent S
A
11. C
onsorz
io N
azio
nale
TO
TA
LS
1. S
TM
icro
ele
ctr
anic
s S
A
9. S
TM
icro
ele
ctr
onic
s S
AS
Actual total
Cum. Act. total
Cum.Plan total
Actual totalPlanned total
Cum. Act. totalCum.Plan total
Planned totalWP5
Test structures and
demonstrators
WP6
Management, dissemination
and exploitation
Planned totalCum. Act. totalCum.Plan total
Cum.Plan total
Actual total
Partner - Person-month per Workpackage
TABLE 3. PERSON-MONTH STATUS TABLECONTRACT N°: 120003ACRONYM: MODERN
6CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Overview of deliverables and milestones status (1)Del. no. Deliverable name WP no. Task
leadNature Dissemina
tionlevel
Delivery date
(proj. month)
Contributors (lead)
Actual / Forecast
delivery date
Delivered Comments
D1.1 Definitions of problems and technologies,Specifications for tools, methods and design techniques
1 ST-I R PP M06 ST-I, AMS, IFXA, NMX, NXP, THL
15-06-2010 No Postponed
D1.2 Check list and verification tests for tools, methods and design techniques
1 ST-I R PP M12 ST-I, AMS, IFXA, NMX, NXP, THL
31-07-2010 No Postponed
D2.2.1 Assessment of state-of-the-art TCAD methodology and usability concerning PV for industrial purposes including identification of current deficiencies of tools
2 UNGL R CO M06 UNGL 10-09-2009 Yes
D2.2.2 Device simulation analysis of dominant variability sources in 45nm planar bulk CMOS technologies. Prototype implementation of the treatment of individual dopants and traps in the device modelling tools
2 UNGL R CO M12 UNGL, UNET, ST-I, SNPS
26-02-2010 Yes
D2.3.1 Characterization of the influence of variability sources in planar bulk CMOS devices down to 45nm.Experimental characterization of Non-Volatile- Memory devices in the presence of PV.Parametric mismatch fluctuation effects in 32 nm FinFETs, first PV results on 22nm FDSOI MOSFETS
2 NXP R CO M12 STF2, IMEP, UNET, NXP NMX, LETI, UNGL
29-03-2010 Yes
D2.4.1 Specification of considered degradation effects, modelling approaches and device parameters
2 AMS R CO M06 UNGL, TUW 09-09-2009 Yes
D3.1.1 Set of alternative symbolic models for lib cells 3 TUD P CO M12 NXP, ST-I, TUD, TUE, UNRM
23-04-2010 Yes
D3.2.1 Process development kit (PDK), circuit techniques, and speed-up algorithms for PV-aware circuit simulation
3 UNBO R CO M12 ST-I, UNBO, UNCA, UNRM
02-04-2010 Yes
D3.3.1 PV-tolerant schematics evaluation and Monitor & Control (M&C) strategies in digital and AMS&RF
3 POLI R CO M12 CSEM, IFXA, LETI, POLI, UPC
29-03-2010 Yes
7CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Overview of deliverables and milestones status (2)
Del. no. Deliverable name WP no. Task lead
Nature Disseminationlevel
Delivery date
(proj. month)
Contributors (lead)
Actual / Forecast
delivery date
Delivered Comments
D3.4.1 Impact of supply noise, and clock distribution on EMI and circuit timing
3 NXP R CO M12 LIRM, ST-I 16-04-2010 Yes
D3.4.2 RF-interaction models for combined PCB-package-IC 3 NXP R CO M12 NXP 02-04-2010 YesD4.2.1 PV-tolerant asynchronous blocks, ultra low-power circuits and
architectures, and asynchronous/de-synchronization flow4 ELX R CO M12 TMPO, CSEM,
ELX, POLI, ST-I
15-02-2010 Yes
D4.3.1 Robust architecture specification and SystemC model 4 ISD R CO M12 THL, ST-F, ISD
01-02-2010 Yes
D5.1.1 Review of test structure state of the art and first results on intra-die variability and matching characterization on available structures in different technology nodes
5 AMS R CO M12 NMX, STF2, TUGI
28-02-2010 Yes
D5.2.1 Basic concept verification of on-chip monitor, noise, compensation, test chip architectures
5 IFXA R CO M12 NXP, IFXA 25-03-2010 Yes
D5.3.1 Software prototype implementation of MOR for MIMO systems of R, RC, RCL
5 SNPS R CO M12 NXP 01-04-2010 Yes
D6.1.1 Internal project website 6 NXP P CO M01 ST-I 01-06-2009 YesD6.1.2 IPR management guidelines 6 NXP R CO M01 NXP 01-10-2009 YesD6.1.3 Risk management plan 6 NXP R CO M06 NXP 09-10-2009 YesD6.1.4 Semi-annual project progress report 6 NXP R CO M06 NXP, all 04-12-2009 YesD6.1.5 Project activity report (Year 1) 6 NXP R CO M12 NXP, all 17-05-2010 YesD6.2.1 Public part of project web-site 6 UNET D PU M01 ST-I 01-06-2009 YesD6.2.2 Press release at the start of the project 6 UNET R PU M03 ST-I 04-09-2009 Yes
8CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Overview of deliverables and milestones status (3)
Milestone number
Milestone name Work package(s) involved
Expected date (proj.
month)
Actual / Forecast
delivery date
Achieved Means of verification Comments
M1.1 Problem Definition and Tests 1,2,3,4,5 M12 31-07-2010 No D 1.1, D1.2 PostponedM3.1 Abstract Models CMOS and AMS&RF 3 M12 22-04-2010 Yes Abstract models for CMOS cell
libraries reported and verified
M3.3 PV aware circuit simulation techniques 3 M12 02-04-2010 Yes PV aware circuit simulation techniques working and verified
M3.5 M&C strategies for digital and AMS&RF 3 M12 29-03-2010 Yes M&C strategies for digital and AMS&RF developed and verified
M3.7 RF interaction models 3 M12 02-04-2010 Yes RF interaction models developed
M4.1 PV-tolerant asynchronous/de-synchronized, ultra low-power, robust functional blocks, and SystemC models
4 M10 15-02-2010 Yes D4.2.1D4.3.1
M4.2 Prototype asynchronous/de-synchronization flow 4 M10 15-02-2010 Yes D4.2.1M6.1 First project review by ENIAC all M08 22-06-2010 No Reviewer’s feedback Planned 22-06-2010
9CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Cooperation, dissemination and exploitation
10
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Project management: progress, funding problems and amendments
11
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Other issues Q&A
12
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Relationship between workpackages
13
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Progress, highlights and lowlights
WP1 has the following specific objectives:
– 1. Clearly define the issues related to nano-electronic technologies that will be tackled in the MODERN project (e.g.,sensitivity of performances, power, yield, deficiencies of existing design techniques, etc).
– 2. Set the target technologies for which the above listed problems will be faced.
– 3. Define the specifications of the prototype tools, methods and flows that will come up as solutions of the previously listed problems.
– 4. Define the requirements of the integration work needed to embed the new tools into the existing design frameworks provided by the EDA partners within the flows in use at ST, NMX, IFX,THL, AMS and NXP.
– 5. Define up front all activities of all WPs of MODERN exception made of the management.
14
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Progress, highlights and lowlights
Task T1.1 Problem Definition. Technology Definition
Partners: ST-I, AMS, IFXA, NMX, NXP, THL,ST-F
Description of the problems to be addressed in the project. Agree on the technologies to be used
Task T1.2 Feasibility Study. Definition of Tool Specifications
Partners: ST-I, AMS, IFXA, NMX, NXP, THL,ST-F
Define a list of tools, methods and design practices to be developed in technical WPs.
Feedback from WP2, WP3, and WP4 leaders will be needed in this task.
For any of items (tools, methods and design practices) defined above, produce the relative specification.
Task T1.3 Specification of Tool demonstration and validation
Partners: ST-I, AMS, IFXA, NMX, NXP, THL,ST- F
For each tool or method specified produce a verification plan or check list to check the tool not only meets the specification but also solve the problem defined in the problem definition Task 1.4
15
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Technical status and achievements of deliverables (incl. changes) 1 of 2
D1.1 due M6 delivered at M15 (June the 22nd 2010)
D1.2 due M12 delivered at M15 (June the 22nd 2010)
M1.1 Problem Definition and Tests due M12 delivered M15 (june the 22nd 2010)
CHANGES Description and Motivations
– D1.1: “Specification of internal design flows, environments and existing tools interfaces and industrial requirements for upgrades “
– D1.2 “Verification of upgrades achieved by the MODERN deliverables according the specifications”
16
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Technical status and achievements of deliverables (incl. changes) 2 of 2
Explanation:
The specification activity has gone forward at Task level within each work Package.
From Tools, Models,Design techniques specifications , done internally in each Work Package, we moved to the definition of the the Industrial requirements for upgrades.
Chage of perspective due to the fact that now the partners requirements are different from what thought at proposal time and the WP1 activities have started trying to make converge all partners necessities and the synthesis requirements of the different WPs in the best format with respect to the day by day activities.
The purpose to make the WP1 outcome more useful to the project and the partners has made necessary the decision to delay the deliverable D1.1 to the 15th of June 2010 (and consequently the D1.2 to end of July2010).
A new template for D1.1 has been agreed and we require now all Silicon Vendors involved in the project to contribute to it.
17
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Cooperation
WP leader: ST-I
Strong dependence on partners: NXP,THL,IFX,AMS,ST-I,SNPS ,ST-F
Collaboration with partners: NXP,THL,IFX,AMS,ST-I,SNPS ,ST-F ,
collaboration
Telephone conferences with: NXP,THL,IFX,AMS,ST-I,SNPS ,ST-F according requirements of deliverables.
With WP Leaders weekly since the month of May.
18
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP1: Other issues, Q&A
19
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP2: Relationship between workpackages
20
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Task T2.x: Task name
Partners (underlined task leader):
Explain in a few words: goal of task, what you did this period, what will be delivered and when.
Explain in a few words: what went well, better than expected and what went worse than expected; describe corrective actions.
WP2: Progress, high- and lowlights
21
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP2: Technical status and achievements of deliverables (incl. changes)
22
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP2: Cooperation
WP leader: STF2
If strong dependence on partners: list partners, describe dependence
Collaboration with partners: list partners, collaboration (division of labor, role, …)
Face to face meetings with: list partners (when)
Telephone conferences with: list partners (when)
23
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP2: Dissemination (publications, patents), exploitation
24
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP2: Other issues, Q&A
25
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP3: Relationship between workpackages
26
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Task T3.x: Task name
Partners (underlined task leader):
Explain in a few words: goal of task, what you did this period, what will be delivered and when.
Explain in a few words: what went well, better than expected and what went worse than expected; describe corrective actions.
WP3: Progress, high- and lowlights
27
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP3: Technical status and achievements of deliverables (incl. changes)
28
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP3: Cooperation
WP leader: NXP
If strong dependence on partners: list partners, describe dependence
Collaboration with partners: list partners, collaboration (division of labor, role, …)
Face to face meetings with: list partners (when)
Telephone conferences with: list partners (when)
29
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP3: Dissemination (publications, patents), exploitation
30
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP3: Other issues, Q&A
31
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP4: Relationship between workpackages
32
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Task T4.x: Task name
Partners (underlined task leader):
Explain in a few words: goal of task, what you did this period, what will be delivered and when.
Explain in a few words: what went well, better than expected and what went worse than expected; describe corrective actions.
WP4: Progress, high- and lowlights
33
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP4: Technical status and achievements of deliverables (incl. changes)
34
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP4: Cooperation
WP leader: ST-I
If strong dependence on partners: list partners, describe dependence
Collaboration with partners: list partners, collaboration (division of labor, role, …)
Face to face meetings with: list partners (when)
Telephone conferences with: list partners (when)
35
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP4: Dissemination (publications, patents), exploitation
36
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP4: Other issues, Q&A
37
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP5: Relationship between workpackages
38
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
Task T5.x: Task name
Partners (underlined task leader):
Explain in a few words: goal of task, what you did this period, what will be delivered and when.
Explain in a few words: what went well, better than expected and what went worse than expected; describe corrective actions.
WP5: Progress, high- and lowlights
39
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP5: Technical status and achievements of deliverables (incl. changes)
40
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP5: Cooperation
WP leader: NMX
If strong dependence on partners: list partners, describe dependence
Collaboration with partners: list partners, collaboration (division of labor, role, …)
Face to face meetings with: list partners (when)
Telephone conferences with: list partners (when)
41
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP5: Dissemination (publications, patents), exploitation
42
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010
WP5: Other issues, Q&A
43
CONFIDENTIAL MODERN 1st Year ReviewJune 22, 2010