Hydropower Business Opportunities Moderator: Col. Don Degidio, USA (Ret.), Global Engineering Solutions Speaker: Col. Aaron Dorf, P.E., USA, Deputy Commander, USACE Northwestern Division

Transcript of Moderator: Hydropower Business Opportunities

Page 1: Moderator: Hydropower Business Opportunities

Hydropower Business Opportunities

Moderator: Col. Don Degidio, USA (Ret.), Global Engineering SolutionsSpeaker: • Col. Aaron Dorf, P.E., USA, Deputy Commander, USACE Northwestern

Division

Page 2: Moderator: Hydropower Business Opportunities

U.S. ARMY CORPS OF ENGINEERSHYDROPOWER BUSINESS OPPORTUNITIES

2021 SAME SMALL BUSINESS CONFERENCE COL Aaron DorfDeputy CommanderNorthwestern Division (NWD) November 19, 2021

File Name

McNary Powerhouse, New Spare GSU Transformer, Washington

Page 3: Moderator: Hydropower Business Opportunities

2

National Hydropower Capacity: 101,200 MW (reference: EIA)– Federal Capacity: 40,700 MW = 40%

• USACE Capacity: 20,600 MW = 20%• Bureau of Reclamation Capacity: 14,800 MW = 15%• TVA Capacity: 5,400 MW = 5%

– Non-Federal Capacity: 60,500 MW = 60%

NATIONAL HYDROPOWER

Non-Federal60,500 MW

USACE Capacity

20,600 MW

Reclamation + TVA Capacity

20,100 MW

National Hydropower Capacity101,200 MW

Page 4: Moderator: Hydropower Business Opportunities

3

HYDROPOWER WORK

Types of Equipment:– Turbines– Generators– Exciters– Governors– Transformers– Medium voltage equip.– Switchgear– Batteries & DC systems– Controls– Cranes

Turbine Runner – John H. Kerr Powerplant, VA

Page 5: Moderator: Hydropower Business Opportunities

4

Scope: Increase load rating of Intake Deck Crane Rail Beams

Increase load rating of existing beams that span open areas on the Intake Deck

Repair current cracks, add reinforcing bar and concrete, to correct existing deficiency and support the required working loads for the Intake Crane

Requires modification of 44 beams

This project is currently in construction

MCNARY INTAKE DECK CRANE: UPRATE BEAM RAILS

Install Work Scaffold Install Work Scaffold Beam Prep Anchor Holes

Reinforcing Bars Installed

Page 6: Moderator: Hydropower Business Opportunities

5

HYDROPOWER UPGRADES

Types of Work– Replace– Upgrade– Rehabilitate

Contract Types– Service– Supply– Construction

Acquisition Strategies– Design-Build– Design-Bid-Build– Task Order: SATOC/MATOC– Hybrid: Supply with/

Construction Installation

Denison, TX Fort Randall, SD

New Orleans, LA

Page 7: Moderator: Hydropower Business Opportunities

6

USACE is developing long term capital asset plans

– The USACE-wide Hydropower Modernization Initiative (HMI) is creating a coordinated long-term asset strategy that:• Provides greatest economic benefit in its capital decision-making • Controls USACE’s asset risk exposure

– System Asset Plan (vs HMI) for Federal Columbia River Power System (20 years, includes Portland, Walla Walla & Seattle Districts)

– Omaha Hydropower Master Plan (20 years)

HYDROPOWER STRATEGIC PLANNING

Page 8: Moderator: Hydropower Business Opportunities

7

COMMON HYDROPOWER NAICS CODES

237990 - Other Heavy And Civil Engineering Construction

238210 - Electrical Contractors & Other Wiring Installation Contractors

333611 - Turbine & Turbine Generator Set Units Manufacture

333923 - Overhead Traveling Crane, Hoist & Monorails System Manufacturing

335311 - Power, Distribution & Specialty Transformer Manufacturing

335312 - Motor & Generator Manufacturing

541330 - Engineering Services

541330 - Hazardous Waste Treatment & Disposal

https://sam.gov/content/home

Page 9: Moderator: Hydropower Business Opportunities

8

USACE HYDROPOWER OPPORTUNITIES (HISTORICAL)

Small Business prime contracts:– Transformers (Supply)– Rehab – Cranes & Governors (Construction and Services)– Rehab Intake Gates, Bulkhead, Penstock Repair, Switchgear

Small Business set asides for hydropower requirements:– Motor Control Center – Supply & Installation– Cavitation Repair – Wicket Gates– Roof Repair – PowerHouse– Switchyard Modifications

Small Business Subcontracting opportunities– Painting– Asbestos Removal– Transportation– Shotcrete (Draft Tubes)

FY21 USACESmall Business Awards Totaled $7.7B (41%)

Bridge Crane Installation - Fort Randall, SD

Page 10: Moderator: Hydropower Business Opportunities

9

HYDROPOWER FY22 – FY27 (CONUS)

Page 11: Moderator: Hydropower Business Opportunities

10FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)

FY22 focus is to maximize Small Business, particularly, Women Owned (WOSB), Hubzone and Veteran (SDVOSB) opportunities in NWD hydropower projects as prime contractors and as subcontractors where actions cannot be set-aside for small business.

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

2.6 Billion 47.4% $1.2 BillionIce Harbor RunnerWalla Walla District

Fort Randall PowerhouseOmaha District

Stockton DamKansas City District

https://www.nwd.usace.army.mil/Business-With-Us/

Page 12: Moderator: Hydropower Business Opportunities

11FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)Location Project Release

Date NAICS Range SBSA SolicitationType

Willamette Valley Big Cliff Dam, OR NWP

Trash rack & Intake Gate 2022 332312 Total SBSA TBD

Willamette Valley Foster Dam, OR NWP

Turbine & Gen Rehab 2023 237990 TBD UNR BVTO

John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 332312 $10-25M TBD TBD

The Dalles Dam, OR NWP Power Plant Ice + Trash Sluiceway Spray Control 2021 $500K-$1M SB TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant 480V - SU1-4 2021 $1-5M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant SQ 4&5, SU 17-27 Replacement (units 17-27 480V)

2022 $5-10M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant Unit 1-16 Generator Rewind 2022 $100-250M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant Upgrade for Station Service Units SS01 & SS02

2022 $10-25M TBD TBD

Libby Dam, MT NWS Power Plant DC Boards & Bkrs Sys 1 & 2 2021 $1-5M TBD TBD

Ice Harbor Dam Burbank, WA NWW

Power Plant PH SER Annunciation & SC SCC Upgrades

2021 $5-10M TBD TBD

Ice Harbor Dam Burbank, WA NWW

Power Plant Intake Gate Hydraulic System Upgrades

2022 237990 $10-25M TBD TBD

Little Goose Dam Starbuck, WA NWW

Power Plant PH Roof Replacement 2021 $1-5M TBD TBD

Page 13: Moderator: Hydropower Business Opportunities

12FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)

FY22 focus is to increase the Small Business industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities for Small Business.

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$1.7 Billion 44.0% $751 Million

Whitney Powerhouse

Table Rock Powerhouse

https://www.swd.usace.army.mil/Business-With-Us/

Page 14: Moderator: Hydropower Business Opportunities

13FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)Location Project Release

Date NAICS Range SBSA SolicitationType

Ozark, AR Runout Indicating Equipment Replacement

2021 TBD $500K-$1M TBD Lowest Priced Tech Acceptable (LTPA)

Table Rock Branson, MO Raw Water System Replacement 2022–24 TBD $1-5M TBD LTPA

Table Rock Branson, MO Draft Tube Gantry Crane Replacement 2021 TBD $1-5M TBD BVTO

Table Rock Branson, MO Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO

Greers Ferry, AR Powerplant Transformer Refurbishment 2021 TBD $500K-$1M TBD BVTO

Greers Ferry, AR Bridge Crane Replacement 2023 TBD $1-10M TBD BVTO

Greers Ferry, AR Powerhouse Generator Rewind 2023 TBD $10-25M TBD BVTO

Dardanelle, AR Turbine Cavitation Repairs 2023 TBD $5-25M TBD BVTO

Dardanelle, AR Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO

Sam Rayburn Jasper, TX

2 Kaplan Runner Repl, 180” D, 41,300 HP, 70’ Head, 85.7 RPM2 Rewinds, 31.5MVA

2025 333611 $25-100M TBD TBD

Sam Rayburn Jasper, TX SCADA System Installation 2022 238210 $1-5M TBD TBD

Sam Rayburn Jasper, TX Excitation Refurbishment/ Replacement 2022 238210 $1-5M TBD TBD

RS Kerr Sallisaw, OK Replace Intake Crane 2021 TBD $1-5M TBD TBD

Eufaula, OK Draft Tube Crane Replacement Ph II 2021 TBD $1-5M TBD TBD

Page 15: Moderator: Hydropower Business Opportunities

14FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER (BOOTH 438)

FY22 focus is to heighten awareness of subcontracting opportunities through our Business Opportunities Open Houses , Industry Days, and various outreach events; as well as increase relationships with SBA Commercial Market Representatives. We will also focus on improving historic deficiencies in the SDVOSB and WOSB assigned targets.

Barkley Dam

St. Marys Falls Canal Hydroelectric Plant

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$2.4 Billion 27.5% $673 Million

https://www.lrd.usace.army.mil/Business-With-Us/

Page 16: Moderator: Hydropower Business Opportunities

15FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISION (BOOTH 438)Location Project Release

Date NAICS Range SBSA SolicitationType

Old Hickory, Hendersonville, TN

Turbine & Generator Rehab - 4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil

2022 333611 $25-100M Unrestricted TBD

Wolf Creek, Jamestown, KY DC/Preferred AC Systems Rehab 2022 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Wolf Creek, Jamestown, KY Powerhouse Overhead Crane Refurbish

2023 335999 $1-5M Unrestricted Best Value Trade Off (BVTO)

Wolf Creek, Jamestown, KY Medium Voltage Cables 2024 335311 $5-10M Unrestricted Best Value Trade Off (BVTO)

Wolf Creek, Jamestown, KY Turbine and Generator Rehab - 6 Francis Runner Replacement (Potential Uprate):175” D, 160’ Head, 105.9 RPM6 Rewinds, Multi-turn Coil

2024 333611 $100-250M Unrestricted Best Value Trade Off (BVTO)

Cheatham, Charlotte, TN Intake Gantry Crane Replacement 2025 335311 $5-10M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Page 17: Moderator: Hydropower Business Opportunities

16FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)

FY22 focus is to increase the industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities.

FY21Small Business Eligible $

SB %FY21 Small Business

Obligated $

$1.6 Billion 67.8% $1.1 Billion

Blakely Mountain Dam

Clarence Cannon Dam

https://www.mvd.usace.army.mil/Business-With-Us/

Page 18: Moderator: Hydropower Business Opportunities

17FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

DeGray Dam Arkadelphia, AR

Power Plant Unit 2 Cavitation Repair 2021 333611 $250-500K TBD TBD

DeGray DamArkadelphia, AR

Power Plant Intake Cylinder Gate and Gate Hoist Repair and Upgrade

2022 237990 $500K-$1M TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Trash Rack Vertical Gate Guide Replacement

2021 237990 $500K-$1M TBD TBD

Blakely Mtn DamMountain Pine, AR

Power Plant Unit 2 Raw Water System Replacement

2021 237990 $250-500K TBD TBD

DeGray DamArkadelphia, AR

Power Plant MOD and OCB Air Circuit Switches Replacement

2021 238210 $100-250K TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Air Circuit Switches Replacement

2021 238210 $100-250K TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Unit and Line Relay Replacement

2021 238210 $100-250K TBD TBD

Page 19: Moderator: Hydropower Business Opportunities

18FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)

FY22 focus is identifying HUBZone, Service-Disabled Veteran Owned and Women Owned small business firms to satisfy our requirements as we continue to build the small business bench with capable firms.

J. Strom Thurmond Powerhouse

Millers Ferry Powerhouse Buford Powerhouse

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$2.8 Billion 40.2% $1.1 Billion

https://www.sad.usace.army.mil/Business-With-Us/

Page 20: Moderator: Hydropower Business Opportunities

19FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

Hartwell Powerhouse Transformer Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Bridge Crane Rehab 2026 333923 $1-5M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Draft Tube Crane Replacement 2024 333923 $1-5M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Motor Control Center Replacement 2025 335311 $1-5M TBD B Value/ Open Competition

Richard B. Russell & J. Strom Thurmond Powerhouse

Generator Circuit Breaker Overhaul 2024 335311 $100-250K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Trash Rack Rehab (Units 1-7) 2024 333999 $250-500K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Penstock Coating Rehab 2022 237990 $250-500K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Station Service Feeder Replacement 2025 238210 $100-250K TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Dissolved Oxygen System Diffuser Replacement 2022 237990 $500K-$1M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Replace Powerhouse Roof Covering 2021 237990 $1-5M TBD B Value/ Open Competition

Page 21: Moderator: Hydropower Business Opportunities

20

QUESTIONS ?US Army Corps of Engineers Northwestern Division

Page 22: Moderator: Hydropower Business Opportunities

21

NORTHWESTERN DIVISION ONLINE

Internet: www.nwd.usace.army.mil

Page 23: Moderator: Hydropower Business Opportunities

22

The Hydropower Environment Next 30-50 years

CONTACTS FOR FURTHER INFORMATION REGARDING HYDROPOWER WORK AT EACH DIVISION/DISTRICT

Great Lakes and Ohio River Division (LRD) BOOTH 438– Nashville: Susan Nicholson [email protected] Mississippi Valley Division (MVD) BOOTH 539– Vicksburg: Demetric Erwin - [email protected] Northwestern Division (NWD) BOOTH 1038– Kansas City (NWK): Arthur Saulsberry - [email protected] – Omaha (NWO): Daniel Curado - [email protected] – Portland (NWP): Carol McIntyre - [email protected] – Seattle (NWS): John Solomon - [email protected] – Walla Walla (NWW): James Glynn - [email protected] – Hydroelectric Design Center (NWP): Carol McIntyre - [email protected] South Atlantic Division (SAD) BOOTH 1409– Charleston: Wayne Hiatt - [email protected] – Mobile: Linda Spadaro - [email protected] – Savannah: Jennifer Cavanagh – [email protected] – Wilmington: Jason Dalton – [email protected] Southwestern Division (SWD) BOOTH 1611– Little Rock: Lakisha Vance – [email protected]– Fort Worth: Carolyn Staten - [email protected] – Tulsa: Gene Snyman - [email protected]

Page 24: Moderator: Hydropower Business Opportunities

23FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER (BOOTH 438)

FY22 focus is to heighten awareness of subcontracting opportunities through our Business Opportunities Open Houses , Industry Days, and various outreach events; as well as increase relationships with SBA Commercial Market Representatives. We will also focus on improving historic deficiencies in the SDVOSB and WOSB assigned targets.

Barkley Dam

St. Marys Falls Canal Hydroelectric Plant

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$2.4 Billion 27.5% $673 Million

https://www.lrd.usace.army.mil/Business-With-Us/

Page 25: Moderator: Hydropower Business Opportunities

24FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

St. Marys Falls Canal, Sault Ste. Marie, MI

Hydroelectric Plant Replace Medium Voltage Circuit Breaker

2020- 22 335311 $1-5M Set-Aside TBD

St. Marys Falls Canal, Sault Ste. Marie, MI

Hydroelectric Plant Replace rails for an overhead bridge crane

2020 333923 $500K-$1M TBD TBD

St. Marys Falls Canal, Sault Ste. Marie, MI

Hydroelectric Plant Repair / refurbish an overhead bridge crane

2021 333923 $500K-$1M TBD TBD

St. Marys Falls Canal, Sault Ste. Marie, MI

Hydroelectric Plant Replace potable water system

2021 237990 $500K-$1M TBD TBD

Center Hill Lancaster, TN Medium Voltage Cables 2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Cheatham Charlotte, TN Medium Voltage Cables 2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Old Hickory, Hendersonville, TN

Switchyard Control Cable and Conduit Replacement

2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Wolf Creek, Jamestown, KY

Main Power Transformer Replacement (Supply and Install)

2021 335311 $10-25M Unrestricted Best Value Trade Off (BVTO)

Old Hickory, Hendersonville, TN

Main Power Transformer Install - Includes relocation from existing transformer yard to the north side of the switchyard in the empty bay.

2022 335311 $1-5M Unrestricted Best Value Trade Off (BVTO)

Page 26: Moderator: Hydropower Business Opportunities

25FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Old Hickory, Hendersonville, TN

Turbine & Generator Rehab - 4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil

2022 333611 $25-100M Unrestricted TBD

Wolf Creek, Jamestown, KY DC/Preferred AC Systems Rehab 2022 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Wolf Creek, Jamestown, KY Powerhouse Overhead Crane Refurbish 2023 335999 $1-5M Unrestricted Best Value Trade Off (BVTO)

Wolf Creek, Jamestown, KY Medium Voltage Cables 2024 335311 $5-10M Unrestricted Best Value Trade Off (BVTO)

Wolf Creek, Jamestown, KY Turbine and Generator Rehab - 6 Francis Runner Replacement (Potential Uprate):175” D, 160’ Head, 105.9 RPM6 Rewinds, Multi-turn Coil

2024 333611 $100-250M Unrestricted Best Value Trade Off (BVTO)

Cheatham, Charlotte, TN Intake Gantry Crane Replacement 2025 335311 $5-10M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)

Page 27: Moderator: Hydropower Business Opportunities

26FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)

FY22 focus is to increase the industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities.

FY21Small Business Eligible $

SB %FY21 Small Business

Obligated $

$1.6 Billion 67.8% $1.1 Billion

Blakely Mountain Dam

Clarence Cannon Dam

https://www.mvd.usace.army.mil/Business-With-Us/

Page 28: Moderator: Hydropower Business Opportunities

27FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

DeGray Dam Arkadelphia, AR

Power Plant Unit 2 Cavitation Repair 2021 333611 $250-500K TBD TBD

DeGray DamArkadelphia, AR

Power Plant Intake Cylinder Gate and Gate Hoist Repair and Upgrade

2022 237990 $500K-$1M TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Trash Rack Vertical Gate Guide Replacement

2021 237990 $500K-$1M TBD TBD

Blakely Mtn DamMountain Pine, AR

Power Plant Unit 2 Raw Water System Replacement

2021 237990 $250-500K TBD TBD

DeGray DamArkadelphia, AR

Power Plant MOD and OCB Air Circuit Switches Replacement

2021 238210 $100-250K TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Air Circuit Switches Replacement

2021 238210 $100-250K TBD TBD

Narrows DamMurfreesboro, AR

Power Plant Unit and Line Relay Replacement

2021 238210 $100-250K TBD TBD

Page 29: Moderator: Hydropower Business Opportunities

28FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)

FY22 focus is to maximize Small Business, particularly, Women Owned (WOSB), Hubzone and Veteran (SDVOSB) opportunities in NWD hydropower projects as prime contractors and as subcontractors where actions cannot be set-aside for small business.

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

2.6 Billion 47.4% $1.2 BillionIce Harbor RunnerWalla Walla District

Fort Randall PowerhouseOmaha District

Stockton DamKansas City District

https://www.nwd.usace.army.mil/Business-With-Us/

Page 30: Moderator: Hydropower Business Opportunities

29FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Bid BendChamberlain, SD NWO

Power Plant Depressing Air/Station Service Air System Rehab

2022 237990 $1-5M TBD Full & Open, BVTO

Garrison Dam Riverdale, ND NWO

Powerhouse Roof Replacement 2022 238160 $1-5M TBD Full & Open, BVTO

Fort Peck Dam Glasgow, MT NWO

Butterfly Valve Rehabilitation 2022 237990 $1-5M TBD Full & Open, BVTO

Fort Peck Dam Glasgow, MT NWO

Outside Station Service Transformer Installation 2022 237990 $5-10M UNR Full & Open, BVTO

Fort Peck Dam Glasgow, MT NWO

Draft Tube Stoplog Replacement 2022 237990 $1-5M TBD Full & Open, BVTO

Fort Randall DamPickstown, SD NWO

Raw Water Strainer Replacement 2022 238290 $1-5M SB Full & Open, BVTO

Oahe Dam Pierre, SD NWO

Powerhouse Roof Replacement 2022 238160 $1-5M TBD Full & Open, BVTO

Oahe Dam Pierre, SD NWO

Autotransformer and Transfer Bay Replay Replacement

2022 237990 $1-5M TBD Full & Open, BVTO

Oahe Dam Pierre, SD NWO

Switchyard Disconnect Switch Replacement 2022 238220 $1-5M TBD Full & Open, BVTO

Gavins Point Yankton, SD NWO

Power Plant Replace Generator Coolers & Raw Water Piping

2022 238220 $5-10M UNR Full & Open, BVTO

Gavins Point Yankton, SD NWO

Supply / Rehab Intake & Tailrace Gates 2021 237990 $5-10M UNR Full & Open, BVTO

Page 31: Moderator: Hydropower Business Opportunities

30FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Bonneville, OR NWP Power Plant 1 Headgate Repair Pit Rehabilitation 2022 237990 $1-5M Total SBSA TBD

Bonneville, OR NWP Power Plant 1 Preferred AC/DC Improvement 2022 237990 $5-10M Total SBSA TBD

Bonneville, OR NWP Power Plant 1 Digital Governors 2022 237990 $5-10M UNR BVTO

Bonneville, OR NWP Power Plant 2 Bradford Island Service Building PRQ Switchgear Upgrade

2022 238210 $1-5M Total SBSA BVTO

Bonneville, OR NWP Bonneville – Powerhouse 2, 65-Ton Tailrace Gantry Crane Replacement

2022 333923 Total SBSA BVTO

John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 238210 $5-$10M Total SBSA BVTO

John Day Dam, OR NWP Exciter Replacement 16 Units, under investigation 2023 335311 TBD TBD TBD

John Day Dam, OR NWP Turbine Replacement and Generator Rewind 2023 237990 Over $500M UNR BVTO

The Dalles Dam, OR NWP Control Room Modernization 2023 238210 TBD TBD BVTO

The Dalles Dam, OR NWP Exciter Control 21 Units, under investigation 2023 335311 TBD TBD

Willamette ValleyDetroit Dam, OR NWP

Intake Gates 2022 237990 $1-5M Total SBSA TBD

Willamette ValleyDetroit Dam, OR NWP

Transformers 2022 335311 TBD TBD

Willamette ValleyDetroit Dam, OR NWP

Trashrack and Intake Gate 2022 332312 Total SBSA BVTO

Willamette ValleyDetroit Dam, OR NWP

Transformer Install 2022 237990 TBD Total SBSA TBD

Page 32: Moderator: Hydropower Business Opportunities

31FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

John Day Dam, OR NWP Turbine Replacement and Generator Rewind 2023 237990 Over $500M UNR BVTO

The Dalles Dam, OR NWP Control Room Modernization 2023 238210 TBD TBD BVTO

The Dalles Dam, OR NWP Exciter Control 21 Units, under investigation 2023 335311 TBD TBD

Willamette ValleyDetroit Dam, OR NWP

Intake Gates 2022 237990 $1-5M Total SBSA TBD

Willamette Valley Detroit Dam, OR NWP

Transformers 2022 335311 TBD TBD

Willamette Valley Detroit Dam, OR NWP

Trashrack and Intake Gate 2022 332312 Total SBSA BVTO

Willamette Valley Detroit Dam, OR NWP

Transformer Install 2022 237990 TBD Total SBSA TBD

Willamette Valley Cougar Dam, OR NWP

Main Unit Breakers & Electrical Reliability Upgrades 2022 238210 $1-5M UNR BVTO

Willamette Valley Foster Dam, OR NWP

Powerhouse and Transformer Oil Water Separator 2022 237990 $1-5M Total SBSA TBD

Willamette Valley Green Peter Dam, OR NWP

Main Unit Breakers and Electrical Reliability Upgrades

2022 238210 $10-25M UNR BVTO

Willamette Valley Green Peter Dam, OR NWP

Bridge Crane 2022 333923 TBD BVTO

Willamette Valley Hills Creek Dam, OR NWP

Main Unit Breakers & Electrical Reliability Upgrades 2022 238210 $5-10M UNR BVTO

Page 33: Moderator: Hydropower Business Opportunities

32FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Willamette Valley Big Cliff Dam, OR NWP

Trash rack & Intake Gate 2022 332312 Total SBSA TBD

Willamette Valley Foster Dam, OR NWP

Turbine & Gen Rehab 2023 237990 TBD UNR BVTO

John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 332312 $10-25M TBD TBD

The Dalles Dam, OR NWP Power Plant Ice + Trash Sluiceway Spray Control 2021 $500K-$1M SB TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant 480V - SU1-4 2021 $1-5M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant SQ 4&5, SU 17-27 Replacement (units 17-27 480V)

2022 $5-10M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant Unit 1-16 Generator Rewind 2022 $100-250M TBD TBD

Chief Joseph Dam Bridgeport, WA NWS

Power Plant Upgrade for Station Service Units SS01 & SS02

2022 $10-25M TBD TBD

Libby Dam, MT NWS Power Plant DC Boards & Bkrs Sys 1 & 2 2021 $1-5M TBD TBD

Ice Harbor Dam Burbank, WA NWW

Power Plant PH SER Annunciation & SC SCC Upgrades

2021 $5-10M TBD TBD

Ice Harbor Dam Burbank, WA NWW

Power Plant Intake Gate Hydraulic System Upgrades

2022 237990 $10-25M TBD TBD

Little Goose Dam Starbuck, WA NWW

Power Plant PH Roof Replacement 2021 $1-5M TBD TBD

Page 34: Moderator: Hydropower Business Opportunities

33FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Little Goose Dam Starbuck, WA NWW

Power Plant Headgate Repair Pit Upgrade 2021 $1-5M TBD TBD

Little Goose Dam Starbuck, WA NWW

Power Plant DC System and LV Switchgear Upgrade

2022 238210 $10-25M TBD TBD

Little Goose Dam Starbuck, WA NWW

Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD

Little Goose Dam Starbuck, WA NWW

Power Plant MU 4-6 Wicket Gate Locks 2021 $500K-$1M TBD TBD

Lower Granite Dam Garfield Co., WA NWW

Power Plant Restore Lindsay Creek & 380 Drainage Lines

2021 $1-5M TBD TBD

Lower Granite Dam Garfield Co., WA NWW

Power Plant Turbine Maintenance Platform 2021 $500K-$1M TBD TBD

Lower Granite Dam Garfield Co., WA NWW

Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD

Lower Granite Dam Garfield Co., WA NWW

Power Plant MU 4-6 Wicket Gate Locks 2021 $500K-$1M TBD TBD

Lower Granite Dam Garfield Co., WA NWW

Power Plant MU2 Blade Sleeve Upgrade & Rehab 2021 $5-10M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant PH SER Annunciation & DG Ctrls Upgrade

2022 $5-10M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant Turbine Maintenance Platform 2021 $500K-$1M TBD TBD

Page 35: Moderator: Hydropower Business Opportunities

34FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Lower Monumental Dam Kahlotus, WA NWW

Power Plant Headgate Repair Pit Upgrade 2021 $1-5M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant DC System & LV Switchgear Upgrade 2022 238210 $10-25M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant MU4 Scroll Case Repair & Water Stop 2021 $1-5M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant PH Bridge Crane Wheel & Drive System Upgrade

2021 $5-10M TBD TBD

Lower Monumental Dam Kahlotus, WA NWW

Power Plant Station Service Compressed Air System Upgrade

2021 $500K-$1M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Digital Governor Upgrade 2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Exciters Upgrade 2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Gov Mechanical Sys Rehab (McMod) 2021 $5-10M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant GSU T1-T7 Oil Leak Repair 2021 $1-5M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Iso-phase, HV Bus & Switch Upgrade McMod

2021 $25-100M TBD TBD

Page 36: Moderator: Hydropower Business Opportunities

35FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

McNary Dam Umatilla, OR NWW

Power Plant Powerhouse Control System Upgrade 2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Levee Drainage Pump Station Upgrades

2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Spillway Gate Rehab and Gate Hoist Uprate 2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Wastewater Upgrade - Connection to City of Umatilla

2021 $1-5M TBD TBD

McNary Dam Umatilla, OR NWW

Headgate Repair Pit Upgrade 2020 $1-5M TBD TBD

McNary Dam Umatilla, OR NWW

Headgate System Rehabilitation (McMod) 2021 $25-100M TBD TBD

McNary Dam Umatilla, OR NWW

Trash Rack Rehabilitation (McMod) 2021 $10-25M TBD TBD

McNary Dam Umatilla, OR NWW

Power Plant Station Service Turbine Rehab 2021 $5-10M TBD TBD

Page 37: Moderator: Hydropower Business Opportunities

36FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)

FY22 focus is identifying HUBZone, Service-Disabled Veteran Owned and Women Owned small business firms to satisfy our requirements as we continue to build the small business bench with capable firms.

J. Strom Thurmond Powerhouse

Millers Ferry Powerhouse Buford Powerhouse

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$2.8 Billion 40.2% $1.1 Billion

https://www.sad.usace.army.mil/Business-With-Us/

Page 38: Moderator: Hydropower Business Opportunities

37FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

St Stephen Powerhouse Motor Control Center Replacement 2021 238210 $500K-$1M TBD B Value/ Open Competition

St Stephen Powerhouse Station Unwatering Sump Rehab 2021 238210 $500K-$1M TBD B Value/ Open Competition

Allatoona Powerhouse Turbine Replacement (Units 1-2) 2027 333611 $25-100M TBD B Value/ Open Competition

Carters Powerhouse Turbine Replacement (Units 1-4) 2026 333611 $25-100M TBD B Value/ Open Competition

Carters Powerhouse Generator Rewind (Units 1-2) 2025 335312 $10-25M TBD B Value/ Open Competition

Millers Ferry Powerhouse 15 kV Switchgear Installation (Units 1-3) 2021 238210 $1-5M TBD B Value/ Open Competition

Jones Bluff Powerhouse Turbine Replacement (Units 1-4) 2026 333611 $25-100M TBD B Value/ Open Competition

Millers Ferry Powerhouse Turbine Replacement (Units 1-3) 2027 333611 $10-25M TBD B Value/ Open Competition

Woodruff Powerhouse Excitation System Replacement (Units 1-3) 2023 335311 $10-25M TBD B Value/ Open Competition

West Point Powerhouse Turbine Replacement (Units 2-3) 2023 333611 $10-25M TBD B Value/ Open Competition

West Point Powerhouse Generator Rewind, Excitation System, Switchgear, & Transformer Replacement (Unit 1)

2023 335312 $1-5M TBD B Value/ Open Competition

Allatoona Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition

Buford Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition

Buford Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition

Buford Powerhouse Powerhouse Controls Upgrade 2026 238210 $1-5M TBD MATOC

Page 39: Moderator: Hydropower Business Opportunities

38FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

Buford Powerhouse Governor PLC Replacement 2026 238210 $250-500K TBD B Value/ Open Competition

Carters Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition

Carters Powerhouse Powerhouse Controls Upgrade 2027 238210 $1-5M TBD MATOC

Jones Bluff Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $100-250K TBD B Value/ Open Competition

Jones Bluff Powerhouse Powerhouse Controls Upgrade 2026 238210 $1-5M TBD MATOC

Millers Ferry Powerhouse Powerhouse Controls Upgrade 2025 238210 $1-5M TBD MATOC

Jim Woodruff Powerhouse Powerhouse Controls Upgrade 2025 238210 $1-5M TBD MATOC

West Point Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition

West Point Powerhouse Powerhouse Controls Upgrade 2023 238210 $1-5M TBD MATOC

Walter F. George Powerhouse

Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition

Walter F. George Powerhouse

Powerhouse Controls Upgrade 2021 238210 $1-5M TBD MATOC

Walter F. George Powerhouse

Governor PLC Replacement 2022 238210 $250-500K TBD B Value/ Open Competition

Jim Woodruff Powerhouse Replace Powerhouse HVAC System 2021 237990 $1-5M TBD B Value/ Open Competition

Buford Powerhouse Replace Fisherman's Warning Horn System 2021 238210 $250-500K TBD B Value/ Open Competition

Page 40: Moderator: Hydropower Business Opportunities

39FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

Hartwell Powerhouse Transformer Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Bridge Crane Rehab 2026 333923 $1-5M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Draft Tube Crane Replacement 2024 333923 $1-5M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Motor Control Center Replacement 2025 335311 $1-5M TBD B Value/ Open Competition

Richard B. Russell & J. Strom Thurmond Powerhouse

Generator Circuit Breaker Overhaul 2024 335311 $100-250K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Trash Rack Rehab (Units 1-7) 2024 333999 $250-500K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Penstock Coating Rehab 2022 237990 $250-500K TBD B Value/ Open Competition

J. Strom Thurmond Powerhouse

Station Service Feeder Replacement 2025 238210 $100-250K TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Dissolved Oxygen System Diffuser Replacement 2022 237990 $500K-$1M TBD B Value/ Open Competition

Richard B. Russell Powerhouse

Replace Powerhouse Roof Covering 2021 237990 $1-5M TBD B Value/ Open Competition

Page 41: Moderator: Hydropower Business Opportunities

40FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION

Location Project ReleaseDate NAICS Range SBSA Solicitation

Type

Hartwell Powerhouse Powerhouse Controls Upgrade 2021 238210 $1-5M TBD MATOC

Richard B. Russell Powerhouse

Powerhouse Controls Upgrade 2022 238210 $1-5M TBD MATOC

J. Strom Thurmond Powerhouse

Powerhouse Controls Upgrade 2024 238210 $1-5M TBD MATOC

Island Creek Pump Station Transformer Replacement 2022 335311 $250-500K TBD B Value/ Open Competition

Philpott Powerhouse Turbine Replacement & Generator Rewind (Units 1-2)

2020 333611 $10-25M TBD B Value/ Open Competition

John H. Kerr Powerhouse Powerhouse Controls Upgrade 2022 238210 $1-5M TBD MATOC

Philpott Powerhouse Powerhouse Controls Upgrade 2023 238210 $1-5M TBD MATOC

Jones Bluff Powerhouse 15kV Switchgear Installation (Units 1-4) 2019 238210 $500K-$1M B Value/ Open Competition

Hartwell Powerhouse Generator Rewind (Units 3-4) 2020 335312 $10-25M B Value/ Open Competition

Page 42: Moderator: Hydropower Business Opportunities

41FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)

FY22 focus is to increase the Small Business industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities for Small Business.

FY21 Small Business Eligible $

SB %FY21 Small Business

Obligated $

$1.7 Billion 44.0% $751 Million

Whitney Powerhouse

Table Rock Powerhouse

https://www.swd.usace.army.mil/Business-With-Us/

Page 43: Moderator: Hydropower Business Opportunities

42FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Ozark, AR Runout Indicating Equipment Replacement

2021 TBD $500K-$1M TBD Lowest Priced Tech Acceptable (LTPA)

Table Rock Branson, MO Raw Water System Replacement 2022–24 TBD $1-5M TBD LTPA

Table Rock Branson, MO Draft Tube Gantry Crane Replacement 2021 TBD $1-5M TBD BVTO

Table Rock Branson, MO Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO

Greers Ferry, AR Powerplant Transformer Refurbishment 2021 TBD $500K-$1M TBD BVTO

Greers Ferry, AR Bridge Crane Replacement 2023 TBD $1-10M TBD BVTO

Greers Ferry, AR Powerhouse Generator Rewind 2023 TBD $10-25M TBD BVTO

Dardanelle, AR Turbine Cavitation Repairs 2023 TBD $5-25M TBD BVTO

Dardanelle, AR Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO

Sam Rayburn Jasper, TX

2 Kaplan Runner Repl, 180” D, 41,300 HP, 70’ Head, 85.7 RPM2 Rewinds, 31.5MVA

2025 333611 $25-100M TBD TBD

Sam Rayburn Jasper, TX SCADA System Installation 2022 238210 $1-5M TBD TBD

Sam Rayburn Jasper, TX Excitation Refurbishment/ Replacement 2022 238210 $1-5M TBD TBD

RS Kerr Sallisaw, OK Replace Intake Crane 2021 TBD $1-5M TBD TBD

Eufaula, OK Draft Tube Crane Replacement Ph II 2021 TBD $1-5M TBD TBD

Page 44: Moderator: Hydropower Business Opportunities

43FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Denison, TX Switchyard Power Circuit Breaker Replacement (Phases I & II)

2021 TBD $500K-$1M TBD TBD

Broken Bow, OK Exciter Voltage Regulator Replacement (Phases I & II)

2021 TBD $500K-$1M TBD TBD

Fort Gibson, OK Exciter Voltage Regulator Replacement (Phases I & II)

2021 TBD $500K-$1M TBD TBD

Eufaula, OK Roof Replacement (Phases I & II) 2021 TBD $500K-$1M TBD TBD

Denison, TX Generator Air Cooler Replacement (Phase I & II)

2021 TBD $500K-$1M TBD TBD

RS Kerr Sallisaw, OK Sewage System Rehabilitation(Phases I & II)

2021 TBD $250-500K TBD TBD

Tenkiller, OK 15-kV Cable & Pothead Replacement (Phases I & II)

2021 TBD $1-5M TBD TBD

Webbers Falls, OK Station Battery Replacement (Phases I & II)

2021 TBD $100-250K TBD TBD

Broken Bow, OK Station Battery Replacement (Phases I & II)

2021 TBD $100-250K TBD TBD

Denison, TX Draft Tube Crane Rehabilitation 2021 TBD $500K-$1M TBD TBD

Tenkiller, OK Butterfly Valve Replacement 2021 TBD $1-5M TBD TBD

Page 45: Moderator: Hydropower Business Opportunities

44FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release

Date NAICS Range SBSA SolicitationType

Broken Bow, OK Oil Containment 2021 TBD $500K-$1M TBD TBD

Keystone, OK Bridge Crane Rehab or Replace 2022 TBD $1-5M TBD TBD

Eufaula, OK Turbine Maintenance Platform Replace 2022 TBD $100-250K TBD TBD

Fort Gibson, OK Turbine Maintenance Platform Replace 2022 TBD $100-250K TBD TBD

Denison, TX Powerhouse Roof Replacement 2022 TBD $500K-$1M TBD TBD

SWPA RegionAR,MO, TX

MATOC for Electrical Equipment, 125V AC/ DC, 600V class, 15kV class bus & switchgear

2022-2025 w/ option for 2 addl. yrs.

238210 $25-100M TBD- $50M capacity

Beaver Eureka Springs, AR

Powerhouse Penstock Rehabilitation (Penstock coating)

2022 TBD $1-5M TBD LTPA

Norfork, Mountain Home, AR Potable Water and Waste Water Rehab 2021 TBD $500K-$1M TBD BVTO

Norfork, Mountain Home, AR 2 Francis Runner Repl, 145.5” D, 42,000 HP, 160’ Head, 128.6 RPM Generator Rewind, Excitation Replacement

2022 333611 $25-100M Unrestricted BVTO

Norfork, Mountain Home, AR Fire Protection & Detection 2024 $500K-$1M TBD BVTO

Norfork, Mountain Home, AR Generator Bay Doors 2025 $500K-$1M TBD BVTO

Norfork, Mountain Home, AR Powerhouse HVAC System 2025 $500K-$1M TBD BVTO

Page 46: Moderator: Hydropower Business Opportunities

ENTER SESSION TITLE

Thanks for Joining us for

Today’s Session!