Introductions
• Tim Gray
• TRE
• Simulation
• Modelling
• Our interest
• Simulate, Validate
• …Control
2
Simulate - High fidelity simulators
3
• Mandated following Ladbroke Grove
• 100% replica of live railway
• c.150 TREsims now installed
• Safe off-line environment for;
• Training & assessment
• Response to disruption/emergency
• Operational analysis
• Engineering and maintenance
• Most VDU-based control workstations
• + Accurate model of interlocking
• A fully controlled virtual railway
Validate – the Project Life Cycle
Business
Case
Concept
Operations
Work
Station
Evaluation /
Human
Factors
Scheme
Optioneering
Final
Design /
Data Test
Pre-
Commissioning
Training
Operational
Phase
Future
Change
Why is it needed? • Other sectors use it more vigorously
• Modelling and Decision Support (NR Technical Strategy)
• CP5 volume & efficiency challenges
– Test & refine the end users’ specification – reduce rework
– Efficient design process – reduce rework/human intervention
– Reduce cost
• Systematic use brings many benefits
• Fits with industry initiatives such as;
– ‘Safety in Signalling Projects’
– Assured Project Delivery
– ‘Safe by Design’
• Enhances the NR GRIP Process
5
GRIP
0.
Conception
1.
Output
Definition
2.
Feasibility
3.
Option
Selection
4.
Single Option
Development
5.
Detailed
Design
7.
Scheme
Hand Back
8.
Project
Close Out
6.
Construction
Test and
Commission
Potential users/stakeholders
0.
Conception
1.
Output
Definition
2.
Feasibility
3.
Option
Selection
4.
Single Option
Development
5.
Detailed
Design
7.
Scheme
Hand Back
8.
Project
Close Out
6.
Construction
Test and
Commission
Who might consider this?
• Network Rail – HQ, SDG, Routes, Ops
• Framework Contractors
• Signalling designers/OEMs
• Consultants – engineering, operations, HF, financials
• Equipment/solution providers
• Operators/Users • Other stakeholders
Some Examples
Business
Case
Concept
Operations
Work
Station/HF
Evaluation
Scheme
Optioneering
Final
Design /
Data Test
Pre-
Commissioning
Training
Operational
Phase
Future
Change
Business Case - TREmodel
Business
Case
Concept
Operations
Work
Station/HF
Evaluation
Scheme
Optioneering
Final
Design /
Data Test
Pre-
Commissioning
Training
Operational
Phase
Future
Change
• Check performance benefit with new layouts
• Check journey time improvements
• Is business benefit delivered? • E.g. TREmodel • E.g. Derby re-modelling
Optioneering - TREmodel
Business
Case
Concept
Operations
Work
Station/HF
Evaluation
Scheme
Optioneering
Final
Design /
Data Test
Pre-
Commissioning
Training
Operational
Phase
Future
Change
• Layout evaluations • Model Operations • Confirm Operational
Requirements • e.g. London Bridge • e.g. Any project!
Design & Test - TREsure
Business
Case
Concept
Operations
Work
Station/HF
Evaluation
Scheme
Optioneering Final
Design /
Data Test
Pre-
Commissioning
Training
Operational
Phase
Future
Change
• Automate design & testing • Use simulation for principles
checking • Reduce reliance on testers • Free up resource • Safety benefits • Accelerate projects • e.g. TREsure - Interlocking Test Tool
TREsure: Origins/Concept
Questions from RIA
• Can TREsim be used to test for
situations that are difficult to
observe using traditional
techniques – particularly across
interlocking boundaries?
• Can this testing be automated?
12
Network Rail request • To test from entrance into the interlocking under test all the way through
to exit from the interlocking – for all possible route paths
• To test for locking (or absence!) for all moveable infrastructure and
opposing routes at locking level (+ aspects?)
TREsure: TRE designed data
Outline existing process for interlocking design & test
13
NR Scheme Plan
Control Tables
Interlocking Data Design
TRE Test FAT SAT
TRE
TRE
TREsure: TRE designed data
Can aid the data design and reduce the amount of manual testing
14
NR Scheme Plan
Control Tables
Interlocking Data Design
TREsure
TRE Test FAT SAT
TRE
TRE
TREsure: External Projects
Outline existing process for interlocking design & test
15
NR Scheme Plan
Control Tables
Interlocking Data Design
Interlocking Data Check
Principles Test
System Test &
Commission
NR Acceptance Into Service
DESIGNER
Independent (but may be the same company)
TREsure: External Projects
Ensures that data is ready for formal testing
16
NR Scheme Plan
Control Tables
Interlocking Data Design
Interlocking Data Check
Principles Test
System Test &
Commission
NR Acceptance Into Service
Independent (but may be the same company)
TREsure
TREsure: External Projects
Checks for errors introduced by re-work & alterations
17
NR Scheme Plan
Control Tables
Interlocking Data Design
Interlocking Data Check
Principles Test
System Test &
Commission
NR Acceptance Into Service
Independent (but may be the same company)
TREsure
TREsure
How Does TREsure Work?
18
TREsim Simulation
SSI Data
Interlocking
Control
Table
Interlocking
Simulation Layout
Scheme Plan
Scheme Plan
How Does TREsure Work?
19
TREsim Simulation
SSI Data
Interlocking
Control
Table
TREsure
Test
Scripts
TREsure
Control
Table
Interlocking
Simulation Layout
Scheme Plan
Scheme Plan
How Does TREsure Work?
20
TREsim Simulation
SSI Data
Interlocking
Control
Table
TREsure
Test
Scripts
TREsure
Control
Table
Interlocking
Simulation Layout
Scheme Plan
Scheme Plan
How Does TREsure Work?
21
TREsim Simulation
SSI Data
Interlocking
Control
Table
TREsure
Test
Scripts
TREsure
Control
Table
Interlocking
Simulation Layout
Scheme Plan
Scheme Plan
Summary
• Modelling and Simulation a benefit throughout the project life cycle
• Good examples, but more work to do
• Improves the efficiency of the process
– Better specification
– Faster test
– Less rework
– Less live railway access needed
• Reduced cost and programme duration
• Safety can be enhanced
• Early adoption = early benefit!
23