Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the...

52
Model Specifications and Testing for the 2 nd Generation Wind Turbine Generator Models Pouyan Pourbeik [email protected] WECC REMTF Workshop WECC REMTF Workshop Salt Lake City, UT 6/17/14

Transcript of Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the...

Page 1: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

Model Specifications and Testing for the 2nd

Generation Wind Turbine Generator Models

Pouyan [email protected]

WECC REMTF WorkshopWECC REMTF WorkshopSalt Lake City, UT

6/17/14

Page 2: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

BACKGROUND

• 1st Generation Wind Turbine Generator (WTG) models

• Were developed ~ 2005 – 2009• Concerns raised in 2010 with respect to:

T 1 & 2 h i bl f

2© 2014 Electric Power Research Institute, Inc. All rights reserved.

– Type 1 & 2 showing unreasonable frequency response– Type 3 & 4 not matching multiple vendors

Page 3: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

BACKGROUND1st Generation WTG model versus actual WTG response

Type 3 WTG (WTG is not GE)

3© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 4: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

BACKGROUND

• Issues that needed to be addressed:T 1 & 2 WTG d t h d t d t bi– Type 1 & 2 WTGs need to have updated turbine controller model (for units with active stall / pitch control)

– Type 3 WTG needs more flexibility to cater for differentType 3 WTG needs more flexibility to cater for different vendor equipment

– Type 4 WTG needs more flexibility to cater for different vendor equipment

• Work started in late 2010 and ended in 2013• New models were implemented by GE Siemens PTI and• New models were implemented by GE, Siemens PTI and

PowerWorld in late 2013 / early 2014

4© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 5: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

MODEL DEVELOPMENT PROCESS FOR 2nd GENERATION WTG MODELS

5© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 6: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

THE MODEL DEVELOPMENT PROCESS

• Started in 2010 under the Renewable Energy Modeling Task Force (REMTF) of WECCTask Force (REMTF) of WECC

• Worked in collaboration with the International Electrotechnical Commission (IEC) Working Group TC88 WG2 i d bi d liWG27 on wind turbine modeling

• The final models have many of the features of the IEC models; some aspects not adopted by WECC due tomodels; some aspects not adopted by WECC due to increased complexity

• EPRI lead much of the model development and testing working with several vendors under Nondisclosure Agreements (NDAs) to verify the models against actual measured field data from vendor equipment

6© 2014 Electric Power Research Institute, Inc. All rights reserved.

q p

Page 7: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

2nd GENERATION WTG MODELS2nd GENERATION WTG MODELS

7© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 8: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

MODEL SPECIFICATION DOCUMENTS

Summary of all specificationsSummary of all specifications

Detailed Type 1 & 2 specD t il d T 3

8© 2014 Electric Power Research Institute, Inc. All rights reserved.

Detailed Type 3 specDetailed Type 4 spec

Page 9: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

A MODULAR APPROACH WAS TAKENBuilding Blocks

RE System

Generator/converter

P/Q Converter

Control

WTG type 4= Block1 + Block2

+ etc….

Drive Train Plant Controller

WTG type 3= Block1 + Block2

+ etc

Pitch Torque C

+ etc….

Utility Scale PV control Control

A

yPlant

= Block1 + Block2 + etc….

9© 2014 Electric Power Research Institute, Inc. All rights reserved.

Aero-dynamics

Page 10: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 1 & 2 WTG

• One of the major type 2 vendors has discontinued this product

• Most new installations in North America are either type 3 or type 4

• There are roughly 13 type 1 and 22 type 2 WTG plants existing in WECC (based on a 2014 base case)

10© 2014 Electric Power Research Institute, Inc. All rights reserved.

WECC (based on a 2014 base case)

Page 11: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 1 & 2 WTG

• Type 1:• Generator model wt1g (not changed)• Generator model – wt1g (not changed)• Drive train model – wt1t (not changed)• Pitch controller – new model wt1p bPitch controller new model wt1p_b

11© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 12: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 1 & 2 WTG

• Type 2:• Generator model wt2g (not changed)• Generator model – wt2g (not changed)• External resistor control – wt2e (not changed)• Drive train model – wt2t (not changed)Drive train model wt2t (not changed)• Pitch controller – new model wt1p_b

12© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 13: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

OLD PITCH CONTROL MODEL

• At minimum do not use the old pitch controller wt1p and wt2p – it does not correctly model the response of thosewt2p it does not correctly model the response of those units and can in some cases show inappropriate response during frequency events

13© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 14: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

New Pitch Controller

• The new model wt1p_b

Flag = 1 if Vt < vt4 & Po ≥ Pset, else = 0

not user defined, set by model automatically

during simulation

14© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 15: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

EXAMPLE PERFORMANCE

15© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 16: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 3 WTG

New

Similar – some changes

16© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 17: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

GENERATOR / CONVERTER MODEL

Qgeno

Rate limits on reactive current for recovery after fault.Upward limit is active when Qgeno > 0Downward limit is active Qgeno < 0

Used by one vendor for one of their control strategies

when you have constant Q controlregc_a

-11 + s Tg

Vt

Iq

High Voltage Reactive Current

Iqcmd

Iqrmin

Iqrmax

s0

LVPL & rrpwr

Reactive Current Management

Iqrmin

wor

k M

odel

11 + s Tg

Ip

Low Voltage

Ipcmd

s1 Inte

rface

to N

etw

Low Voltage Active Current Management1

1 + s Tfltr

Lvpl1

Zerox Brkpt

LVPL

V

0

1

Lvplsw

s2

17© 2014 Electric Power Research Institute, Inc. All rights reserved.

Zerox Brkpt

Page 18: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

GENERATOR / CONVERTER MODELHVRC Management LVAC Management

18© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 19: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

CONVERTER P/Q CONTROL

reec_a

19© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 20: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

CONVERTER P/Q CONTROL

20© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 21: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TURBINE-SHAFT MODEL

wtgt_a

21© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 22: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

AERO-DYNAMICS MODEL

wtgar_a

Based on: W. W. Price, J.J. Sanchez-Gasca, “Simplified Wind Turbine Generator Aerodynamic Models for Transient Stability

Studies” Proc. IEEE PES 2006 Power Systems Conference and Exposition (PSCE), Oct. 29-Nov. 1, 2006, Atlanta, GA, pp. 986-992.

22© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 23: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

PITCH CONTROLLER MODEL

wtgpt_a

23© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 24: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TORQUE CONTROLLER MODEL

wtgtrq_a

24© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 25: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

PLANT CONTROLLER MODEL

repc_a

25© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 26: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

VALIDATION OF TYPE 3 MODEL

Just one example – ran many tens of cases of comparisons between measurement and simulation for those who provided data

26© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 27: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 4A

27© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 28: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 4B

28© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 29: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

VALIDATION OF TYPE 4A MODEL

Just one example – ran many tens of cases of comparisons between measurement and simulation for those who provided data

29© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 30: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

VALIDATION OF TYPE 4B MODEL

Just one example – ran many cases of comparisons between measurement and simulation for those who provided data

30© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 31: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

SUMMARY

Device regc_a reec_a wtgt_a wtgar_a wtgpt_a wtgtrq_a repc_aType 4 WTG A X X X XType 4 WTG B X X XType 3WTG X X X X X X XType 3 WTG X X X X X X X

Functionality Models Needed PfFlag Vflag Qflag RefFlagConstant pf control reec_a 1 N/A 0 N/AConstant Q control reec_a 0 N/A 0 N/ALocal V control only reec a 0 0 1 N/ALocal V control only reec_a 0 0 1 N/ALocal coordinated Q/V control only reec_a 0 1 1 N/APlant level Q control reec_a + repc_a 0 N/A 0 0Plant level Vcontrol reec_a + repc_a 0 N/A 0 1Plant level V Control + coordinated local Q/V control reec_a + repc_a 0 1 1 1Plant level Q Control + coordinated local Q/V control reec_a + repc_a 0 1 1 0

31© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 32: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

BENCHMARKING OF COMMERCIAL TOOLSExample plot showing consistency among three commercial tools

Type 4 WTG Infinite Bus

There are actuallyythree (3) plots here

but they match very closely!!!!

GE PSLFTM BlueGE PSLFTM – Blue Siemens PTI PSS®E – Red

PowerWorld – Green

32© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 33: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

CURRENT STATUS

• Models tested extensively for single wind turbine• Benchmarked across platforms• Benchmarked across platforms• Now available in all three major platforms in North America

• GE PSLFTMGE PSLF• Siemens PTI PSS®E• PowerWorld Simulator

• Testing done also on plant level controller to some extent -tl ki t ti th l t l l t llcurrently working on testing the plant level controller more

extensively

33© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 34: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

SOME THINGS TO WATCH OUT FORSOME THINGS TO WATCH OUT FOR

34© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 35: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

THINGS TO WATCH OUT FOR

• There are countless combinations and permutations of possible flag etc. – not all are valid.possible flag etc. not all are valid.

• There is no real default setting – please work with the vendors

• Do not worry too much about the spikes after a fault• Active crow bar is not modeled

E l t d i ti l i t d l d f t ti• Emulated inertial response is not modeled – future action• Active drive train damping is not explicitly modeled• Drive train is rough emulation does not represent physical• Drive-train is rough emulation – does not represent physical

system• The models are in general an emulation – do not

35© 2014 Electric Power Research Institute, Inc. All rights reserved.

necessarily have one to one correspondence to actual control system

Page 36: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

REPORTS

• All these explained in detail in the reports listed at the end of these slidesof these slides

36© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 37: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

THE SPIKES

37© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 38: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TYPE 4 WTG – STATE CHANGEVendor 3

No re-setting of the state, which is ok

in planning simulations.

38© 2014 Electric Power Research Institute, Inc. All rights reserved.

in planning simulations.This is as expected and previously explained

(see note 3., page 4-1 of type 4 report).

Page 39: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

GENERATOR/CONVERTER MODEL

39© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 40: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

ACTIVE CROW-BAR

40© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 41: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

TORQUE CONTROLLER (a previous version)

41© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 42: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

STATOR CURRENT LIMIT

• The addition is to have an option for which we multiply Ipmax by the generator speed in the current limitIpmax by the generator speed in the current limit calculation, for Q-priority

• This can be done by adding one flag to the model

42© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 43: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

ACTIVE CROW-BAR MODEL (Type 3 – vendor 1)Original Proposed Model Adding Active Crow-Bar Representation and 1/Xe

43© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 44: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

ACTIVE DAMPING AND STATOR CURRENT LIMIT (Type 3 – vendor 2)LIMIT (Type 3 vendor 2)

Original Proposed ModelAdding Active Drive-Train Damping and

Stator Current Limit

44© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 45: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

LIGHT LOAD CONDITIONS

0.6• Generic models are too

0

0.2

0.4

eal P

ower

(pu)

MeasuredSimulated

• Generic models are too simple to attempt to fully capture the nuances of the oscillatory behavior

0 2 4 6 8 10 12-0.2

0Re

1

• Cannot necessarily use the same set of parameters for the simple model for all operating conditions

0

0.5

activ

e P

ower

(pu) Measured

Simulated•Torsional (local) oscillations do not have a significant impact on system voltage for cases where the short circuit

0 2 4 6 8 10 12-0.5

Re

Time (seconds)

cases where the short circuit levels are strong

45© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 46: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

FUTURE WORKFUTURE WORK

46© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 47: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

WHAT IS HAPPENING WITH ENERGY STORAGE?STORAGE?

• California: “Legislation (AB 2514) enacted in September 2010 allows for the adoption of requirements for utilities to2010 allows for the adoption of requirements for utilities to procure energy storage systems. ……The decision requires the utilities to collectively procure 1,325 MW of energy storage by 2020 which will be installed and delivering tostorage by 2020, which will be installed and delivering to the grid no later than the end of 2024.” http://www.dsireusa.org/incentives/incentive.cfm?Incentive_Code=CA25R

Oth i Th h k ’ th i• Other regions: Through our work we’ve seen other regions also starting to adopt Energy Storage, e.g.

• ERCOT pilot for fast frequency responseERCOT pilot for fast frequency response• PV plants married with BES• Etc.

47© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 48: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

WHAT MODELS DO WE NEED?

• Compressed Air Energy Storage – GT model essentially• Pumped Hydro conventional generator / turbine models• Pumped Hydro – conventional generator / turbine models• BES – requires a FACTS type model• Fly Wheel - 5MWh unit in Stephentown, New York sinceFly Wheel 5MWh unit in Stephentown, New York since

2011; grid interface is inverter based• Essentially most ES technologies will use an power

t i t f t f ti l dconverter interface, except of course conventional pumped-hydro and CAES

• Note: Advanced pumped hydro also uses a converterNote: Advanced pumped hydro also uses a converter interface (IEEE TF on Adjustable Speed Pump Storage Modeling)

48© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 49: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

CONCEPT FOR GENERIC BES MODEL

49© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 50: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

HIGHER LEVEL PLANT CONTROLER

• A few projects where they have a plant controller communicating with turbines and a STATCOMcommunicating with turbines and a STATCOM

• The fact that it is possible to have multiple types of WTGs in a single WPP (or adjacent WPPs) that are coordinated via a single plant controller

• The fact that there are cases where other devices (e.g. shunt capacitor banks) are controlled by a central plant p ) y pcontroller

50© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 51: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

HERE IS THE CONCEPT TO BE DEVELOPED

The same concept could also be applied to the Real Power Control loop as well;

of course being only applicable to controlling multiple WTG or PV plants.

51© 2014 Electric Power Research Institute, Inc. All rights reserved.

Page 52: Model Specifications and Testing for the 2nd Generation ...Model Specifications and Testing for the 2nd Generation Wind Turbine Generator Models Pouyan Pourbeik ppourbeik@epri.com

REFERENCES

WECC Approved Documents:• Type 1 & 2:

http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/Shared%20Documents/MVWG%20Approved%20Model%20Specifications/WECC%20Type%201%20and%202%20Generic%20Turbine%20Pseudo%20Governor%20model%20-%201012.pdf

• Type 3:http://www.wecc.biz/library/WECC%20Documents/Documents%20for%20Generators/WECC%20Type%203%20Wind%20Turbine%20Generator%20Model%20-%20Phase%20II%20012314.pdf

• Type 4:http://www.wecc.biz/library/WECC%20Documents/Documents%20for%20Generators/WECC%20Type%204%20Wind%20Turbine%20Generator%20Model%20-%20Phase%20II%20012313.pdf

• Summary of all specs:http://www wecc biz/library/WECC%20Documents/Documents%20for%20Generators/WECC%20Second%20Generatiohttp://www.wecc.biz/library/WECC%20Documents/Documents%20for%20Generators/WECC%20Second%20Generation%20Wind%20Turbine%20Models%20012314.pdf

Other Supporting Reports:• http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=000000003002001002 (This report includes the

test cases etc. for benchmarking the new models)