Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow...

15
Installation and Commissioning Technician ( Head End ) Model Curriculum Installation and Commissioning Technician ( Head End ) SECTOR : SUB-SECTOR : OCCUP A TION : REF ID : NSQF LEVEL : INSTRUMENTATION AUTOMATION SURVEILLANCE & COMMUNICATION COMMUNICATION (BROADCAST) INSTALLATION & COMMISSIONING IAS/Q0203, V1.0 4

Transcript of Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow...

Page 1: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End )

Model Curriculum

Installation and Commissioning Technician ( Head End )

SECTOR :

SUB-SECTOR :

OCCUPATION :

REF ID :

NSQF LEVEL :

INSTRUMENTATION AUTOMATION SURVEILLANCE &

COMMUNICATION

COMMUNICATION (BROADCAST)

INSTALLATION & COMMISSIONING

IAS/Q0203, V1.0

4

Page 2: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End )

Page 3: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End )

TABLE OF CONTENTS

1. Curriculum 01

2.

Trainer Prerequisites

05

3.

Assessment Criteria

06

Page 4: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 1

Installation and CommissioningTechnician

(Head End)

CURRICULUM / SYLLABUS

This program is aimed at training candidates for the job of a “Installation and Commissioning Technician

(Head End )”, in the “Instrumentation Automation Surveillance & Communication” Sector/Industry and aims at

building the following key competencies amongst the learner

Program Name

Installation and Commissioning Technician (Head End)

Qualification Pack Name

& Reference ID.

IAS/Q0203, v1.0

Version No.

1.0 Version Update Date

17th Oct. 2018

Pre-requisites to Training

Diploma in Electronics, Telecommunication or equivalent

Training Outcomes After completing this programme, participants will be able to:

Identify the client requirements of the installation and commissioning of

head end setup.

Prepare pre-installation works of head end.

Carryout installation of head end.

Carryout in the measurement and testing of the facility after completing

the installation.

Prepare documentation and reports relating to installation of cable TV

head end subsystem.

Prepare commissioning report of cable TV head end subsystem.

Follow health and safety norms of the industry and the organization to

ensure health and safety of self, others, asset and environment.

Work effectively in a team

Page 5: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 2

This course encompasses 4 out of 4 National Occupational Standards (NOS) of “Installation and Commissioning Technician ( Head End )” Qualification Pack issued by “Instrumentation Automation

Surveillance & Communication Sector Skill Council”.

Sr.

No.

Module

Key Learning Outcomes Equipment

Required 1 Introduction to Head End

Theory Duration

(hh:mm)

24:00

Practical Duration

(hh:mm)

24:00

Corresponding NOS

Code

IAS/N0213 IAS/N0214

Define basic principles of signals, communication, digital technologies, Cable TV signal distribution etc.

Describe basic of electronic engineering and methods viz soldering, crimping of all types of cables, connectorization, splicing of OFC, cabling, routing, bunching, harnessing, racking, earthing.

Identify the relevant documents of work flow, floor drawings etc.

Define functionality, installation, operation and maintenance of the equipment employed in head end of DAS viz Satellite receive dish, LNBC (Low noise block converter), Integrated receiver/decoder (IRD), encoder,

monitor etc equipment and application software used for CAS, encryption, decryption, subscriber management system, supervision, management etc., IT hardware like servers, switches, routers, UPS and all type of cables like RF coaxial, audio, OFC, CAT6 etc.

Laptop, white board, marker, projector etc for class room learning. Electronic workshop tools and equipment like temperature controlled soldering station, crimping tools, splicing

station, multi meter, hand tools etc. Cable and connector samples for RF coaxial, OFC, CAT-6, HDMI etc.

2

Install cable TV head end subsystems Theory Duration

(hh:mm)

28:00

Practical duration

(hh:mm) 08:00

Corresponding NOS

Code

IAS/N0213

Identify installation documents viz the floor drawings, work flow and circuit/wiring schematics, installation manuals prepared by OEM/ consultant for the project execution.

Demonstrate the correct use of the various equipment, installation etc.

Demonstrate the correct use of placement of equipments, cable routing etc.

Identify the operating condition, parameters and functioning of each equipment to be tested.

Demonstrate skill of soldering, crimping etc. for connectorization of electrical/ audio/data/RF cable.

Demonstrate cable harnessing, bunching, placement, routing of different types of cables, interconnection etc.

Demonstrate setting up and programming of various software operated/controlled equipment for

optimum performance.

Laptop, white board, marker, projector etc.

Page 6: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 3

3 Coordination with other vendors

Theory Duration

(hh:mm)

20:00 Practical Duration

(hh:mm)

08:00

Corresponding NOS

Code

IAS/N0214

Identify the nature and details of the works being executed by other vendors for the installation of auxiliary facilities like electrical power supply arrangement, earthing, captive power source, air conditioning, Satellite uplink/downlink dishes, encryption, SMS software etc.

Identify the sequence and dependencies of various works to be taken up during the installation, procedure, dependencies etc.

Laptop, white board, marker, projector etc.

4 Carry out testing and

commissioning

activities of cable TV

head end subsystems

Theory Duration

(hh:mm)

24:00

Practical duration

(hh:mm) 08:00 Corresponding NOS Code

IAS/N0214

Carryout installation as per the procedure recommended by OEM and consultant and logging the performance and observation.

Recognize the intricacies and importance of documentation of the project work

Laptop, white board, marker, projector etc. Test and Measuring instruments like Audio/video/network analyser, Cable TV signal analyser etc.

5 Health and Safety in Workplace

Theory Duration (hh:mm) 04:00

Practical Duration (hh:mm) 08:00

Corresponding NOS Code IAS/N2003

• Illustrate the importance of safety and first aid.

• Identify the components of a basic first aid kit, safety tools, equipments. • Administer basic first aid at the time of emergency. • Demonstrate correct use of fire extinguishers at the time of emergency. • Follow the general safety procedures as defined by the organization • Follow electrical safety measures while operating electrical tools and RF equipment • Illustrate practices for maintaining safe and secure workplace • Participate in safety drills at workplace

Laptop, white board, marker, projector, Fire Drill accessories, First Aid kit, Protective Gear, ESD accessories

6 Work Effectively With Teams

Theory Duration (hh:mm) 08:00 Practical Duration (hh:mm) 08:00 Corresponding NOS Code IAS/N2105

• Coordinate effectively with team members to achieve work objectives • Communicate effectively with the team. • Demonstrate active listening skills while communicating

Laptop, white board, marker, projector, MS Office / Open office software, email, Printer

Page 7: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 4

Total Duration

Theory Duration 108:00

Practical Duration

64:00

Unique Equipment Required:

• Laptop, white board, marker, projector.

• Test and measuring instruments required for demonstration and

learning consists of Multimeter, Clip-on meter, Earth

resistance meter, Insulation Megger, Audio Analyzer,

Spectrum Analyzer, RF Vector Impedance meter, CRO, RF

power meter, Hygrometer, Thermometer, Air-flow meter etc.

• Fire Drill Accessories, First Aid Kit, protective equipment

industry visits

Grand Total Course Duration: 172 Hours, 00 Minutes

Recommend OJT Hours : 28 Hours, 00Minutes (This Syllabus curriculum has been approved by Instrumentation Automation Surveillance & Communication Sector Skill Council of India)

Page 8: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 5

Trainer Prerequisites for Job role: “Installation and Commissioning Technician ( Head End) mapped to Qualification Pack: “IAS/Q0203, v1.0”

Sr.

No.

Area

Details

1 Description The Installation and Commissioning Technician - Head End of DAS carries out installation of electronic and IT equipment; cabling and wiring of data transmission and electrical supply for Head End and assists the installation & commissioning engineer at site in testing and commissioning.

2 Personal

Attributes This job requires the individual to be disciplined, assertive, team player,

possess analytical skills and problem solving ability, effective communicator

and have the ability to work under pressure.

3 Minimum

Educational

Qualification

s

Diploma in Electronics, Telecommunication or equivalent

4a Domain

Certification Certified for Job Role: “Installation and Commissioning Technician

(Head End) ” mapped to QP: “ IAS/Q0203,V1.0” . Minimum accepted

score is 80%

4b Platform

Certification Recommended that the Trainer is certified for the Job Role: “Trainer”,

mapped to the Qualification Pack: “MEP/Q0102”. Minimum accepted score is

80%.

5 Experience NA

Page 9: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 6

Assessment Criteria

Assessment Criteria Job Role Installation and Commissioning Technician (

Head End)

Qualification Pack IAS/Q0203, V1.0

Sector Skill Council Instrumentation Automation Surveillance &

Communication

Guidelines for Assessment

1. Criteria for assessment for each Qualification Pack will be approved by the Sector Skill Council.

Each Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down proportion of marks for Theory and Skills Practical for each PC.

2. The assessment for the theory part will be based on knowledge bank of questions created by the SSC.

3. Individual assessment agencies will create unique question papers for theory part for each

candidate at each examination/training centre (as per assessment criteria below)

4. Individual assessment agencies will create unique evaluations for skill practical for every student at each examination/training canter based on this criteria

5. To pass the Qualification Pack, every trainee should score a minimum of 60% in aggregate and 70% in each NOS. 6. In case of unsuccessfully completion, the trainee may seek reassessment on the Qualification Pack.

Page 10: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 7

Compulsory NOS Marks Allocation

Assessment Outcomes

Assessment Criteria for Outcomes Out of

Theory Skills Practical

1.IAS/N0213

Install cable

TV head end

subsystem

PC1.read and interpret the workflow of the entire

DAS facility, the floor plan of the Control

room, the technical installation manual of all

equipment being installed for the project and

cabling and wiring plan of all equipment

5 2 3

PC2.ensure that the equipment, systems, power supply, server rack/room, cable harness, ventilation and air conditioning, etc. in the control room are correctly placed

5 2 3

PC3.install the parabolic dish antenna (PDA) and

Low Noise Block converter (LNBC) as per the

OEM documentation at the location indicated

in the drawing

5 2 3

PC4.orient the dishes and track the satellite as per

the requirement 5 2 3

PC5.ensure that PDA permanently fastened to the

concrete floor with the help of foundation

bolts

5 2 3

PC6.ensure that PDA permanently fastened to the concrete floor with the help of foundation bolts

4 2 2

PC7.lay and route RF cables for interconnecting

the LNBC to the respective integrate

receiver/decoder (IRD) through the conduits/

raceway as per the drawing and details

provided by the consultant 3

1

2

PC8.interpret and follow the standard cable color

codes for the inter-connection. 4

2 2

PC9.ensure that, while crimping the RF coaxial

cables to the connectors, proper color code is

followed and connected properly, particularly

for the shield. 3

1

2

PC10.ensure that all RF cables are marked using

standard notation and legends as provided

in the drawing for ease of identification 3

1

2

PC11.install the LT power supply distribution LT

distribution panel, cabling and earthing as

per drawings provided 3

1

2

PC12.verify that the LT power supply distribution

LT distribution panel, cabling and earthing

have been properly installed, if these are

executed by a vendor

5 2 3

PC13.ensure that the earth strips are securely

connected to all the racks and AC power

equipment such as UPS, LT Switchgear with

the help of copper/brass nuts bolts

5 2 3

PC14.install and firmly grout the equipment racks

for mounting the Content Reception and

Decryption Equipment like IRDs etc., and

power supply backup equipment like UPS

3 1 2

Page 11: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 8

etc. as per the floor plan of the control room

PC15.provide earthing and regulated AC power

supply to each rack as per the drawing

5 2 3

PC16.check and ensure that the output of each of

the LNBC is connected to the respective IRD

for receiving the content

3 1 2

PC17.check and ensure the output of the IRD is

connected to the splitters / distributors etc.

as per approved floor plan in the installation

manual provided by the consultant. If

required, seek the advice and guidance of

the consultant

5 2 3

PC18.perform network of all the IRDs for remote

monitoring and control by the computer 5 2 3

PC19.check and ensure that the earth wires are

securely connected to each of the equipment

and termination plate using brass or copper

fasteners.

3 1 2

PC20.check and ensure the proper functioning of

the ventilation and cooling arrangement for

the control room

5 2 3

PC21.install video processing equipment like

Encoder, Modulator and IT equipment like

Router, CAS server, EPG server and RF

equipment like RF amplifier, HFC equipment

etc. in the respective equipment racks

5 2 3

PC22.install Interface equipment for automation

of supervision and monitoring as per the

drawing and procedure laid out in the

installation manual provided by the

consultant

5 2 3

PC23.seek the advice and guidance of the system

integrator and consultant in case of any

problem

5 2 3

Total 100 40 60

2.IAS/N0214

Carry out

testing and

commissioni

ng activities

of cable TV

head end

subsystems

PC1. ensure availability of the documentation on

testing procedure of the entire setup

provided by the respective OEM and

consultant

5 2 3

PC2. identify operating conditions and functioning

process of each of the equipment from the

available documentation as well as by

contacting the respective OEM

5 2 3

PC3. ensure implementation of recommended

operating conditions for each equipment 5 2 3

PC4. inspect all electric, audio/video, RF and Data

connectivity physically to ensure proper

functioning

5 2 3

PC5. check and ensure that all connectors are

crimped/soldered as per standard practice

5 2 3

PC6. check and ensure that all power supply Line,

Neutral and Earth are connected as per 5 2 3

Page 12: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 9

standard practice

PC7. check and log the power supply voltage and

current drawn by all the major equipment

using multimeter and clip-on ammeter

5 2 3

PC8. check and log the AC voltage between

Neutral and Earth of incoming supply,

distribution board and every point socket

5 2 3

PC9. check the earth connectivity, if the AC voltage

is more than 1 V. 5 2 3

PC10.check for balancing of electric power loads

on all the three phases and try to balance

the power to the extent possible by

distributing the load

5 2 3

PC11.measure and log the air flow, outdoor and

indoor temperatures and relative humidity

to ascertain optimum working of air

conditioning plants

5 2 3

PC12.check for proper functioning of each

equipment including measuring and logging

the performance of all audio/video, RF

equipment as per the recommended

procedure suggested by the OEM under

instructions from the HE installation Engineer

5 2 3

PC13.measure and optimize all important

parameters of the HE electronics like signal

from the satellite downlink equipment,

integrity of the data equipment, level

alignment between various interconnected

equipment, data integrity of the digital

stream etc. under instructions from the HE

installation Engineer

5 2 3

PC14.check, measure and optimize the C/N of the

RF carrier with spectrum analyzer,

modulation depth, RF power measurements

etc. under instructions from the HE

installation Engineer

5 2 3

PC15.check and log important parameters

displayed by the receiver front panel for

reference

5 2 3

PC16.check the user manual of the equipment for

normal readings 5 2 3

PC17.ensure through visual check for normal

performance of the entire system

5 2 3

PC18.Make arrangement for the subjective

listening tests before the commissioning 5 2 3

PC19.check and arrange facilities for hands-on

training of the station staff on the operation

and maintenance of the setup with the help

of station administrators

5 2 3

PC20.give instructions in performing the operation

correctly and correct them

5 2 3

Total 100 40 60

PC1. Know and understand the team objectives

and goals

3 1 2

Page 13: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 10

3. IAS/N2105 Work effectively with Teams

PC2. Know team members by name. Greet them

appropriately and respond to their greetings.

2 1 1

PC3. Know the roles and responsibilities of team

members. Ensure others know about you

and your role in the team

2 1 1

PC4. Learn about the culture and preferences of team members – especially if they belong to other organizations or nationalities

5 1 4

PC5. Follow organization’s policies and procedures

for working with team members within and

outside the organization – especially relating

to privacy, confidentiality and security.

2

1

1

PC6. Create an environment of trust and mutual

respect

3 1 2

PC7. Use appropriate mode of communication verbal, written, mail, phone or text and clearly articulate your message to ensure that the recipient understands the message.

2

1

1

PC8. Listen to team members and try to

Understand what they are wanting to say.

Seek or provide clarifications if you see any

gap in understanding

3

1

2

PC9. Communicate professionally and follow

organization protocols. Do not overload the

team members with unnecessary and

unsolicited information

4

1

3

PC10.Share important information with the team timely.

3 1 2

PC11.Respond to communications promptly. 3 1 2

PC12.Perform own role and produce output in

time for other team members to consume.

3 1 2

PC13.Receive inputs from others and work upon it

per role requirement

2 1 1

PC14.Make adjustments within the permissible

rules so that work flows smoothly.

2 1 1

PC15.Help team members to perform their role

effectively and provide any clarifications and

support they need

2

1

1

PC16.Share tools and common resources fairly,

taking cognizance of others’ needs and

schedules

2 1 1

PC17.Resolve any contentious issues amicably,

involving the team lead or the supervisor if

needed

2

1

1

PC18.Let team members know in good time if you

cannot carry out your commitments,

explaining the reasons and alternate

solutions, if any. Let the team lead know

about this.

2

1

1

PC19. Think positively and make constructive

suggestions to meet the goals

2 1 1

PC20. Accept and give suggestions with open mind 2 1 1

Page 14: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 11

PC21. Take initiatives and volunteer to contribute 2 1 1

PC22. Help team members with facts and figures to

arrive at workable decisions

2 1 1

PC23. Accept decisions professionally and support

these, even if these do not match your

suggestions and personal views.

4

1

3

PC24. Act in the interest of the team and the

organization to ensure the things do not ‘fall

through the gap’ and team goals are

achieved.

4

1

3

PC25. Take initiative to correct the situation if

something seems to be going wrong.

2 1 1

PC26. Seek help or escalate if the situation demands

2 1 1

PC27. Follow organization’s and statutory

guidelines about making references or

comments to social customs or preferences

2 1 1

PC28. Refrain from making any comments to hurt

sentiments

2 1 1

PC29. Accommodate team members’ preferences

to the extent feasible. If these come in the

way of fulfilling team goals, discuss with the

supervisor/team leader.

2

1

1

PC30. Seek information and clarifications from

others if you do not understand any

customs.

2 1 1

Total 75 30 45

4. IAS/N2003

Health and Safety in

workplace

PC1. Comply with general safety procedures

followed in the company

3 2 1

PC2. Follow standard safety procedures while

handling an equipment, hazardous material

or tool

2 1 1

PC3. Remove finger rings or any other metal

objects likely to interfere with the work

before working on the unit

4

2

2

PC4. Use of safety materials such as goggles, gloves, ear plugs, caps, ESD pins, covers, shoes, etc.

4 1 3

PC5. Escalate about any hazardous materials or

things found in the premises

4

1

3

PC6. Report about any breach of safety procedure

in the company

3

1

2

PC7. Ensure zero accidents at work 5 2 3

PC8.Avoid damage of components due to

negligence in ESD procedures

4 1 3

PC9.Participate regularly in fire drills or other

safety related workshops organized by the

company

5

2

3

PC10.Ensure no loss for company due to safety

negligence

4 1 3

PC11.Maintain appropriate posture, especially

in long hours of sitting or standing position

and in handling heavy materials

4

2

2

Page 15: Model CurriculumC2%A0IASQ... · 2019. 5. 30. · power meter, Hygrometer, Thermometer, Air-flow meter etc. • Fire Drill Accessories, First Aid Kit, protective equipment indu stry

Installation and Commissioning Technician ( Head End ) 12

PC12. Participate in company organized health

sessions such as yoga, physiotherapy or

games

4

2

2

PC13. Handle heavy and hazardous materials

with care and using appropriate tools and

handling equipment such as trolleys, jacks

and ladders

4

2

2

Total 50 20 30