MOBA Mobile Automation AG Kapellenstr. 15 65555 Limburg / Germany Telefon: +49 6431 95770 Telefax:...

11
MOBA Mobile Automation AG • Kapellenstr. 15 • 65555 Limburg / Germany Telefon: +49 6431 95770 • Telefax: +49 6431 9577177 • E-Mail: [email protected] • www.mo 06/2010 Basic knowledge Asphalt paving

Transcript of MOBA Mobile Automation AG Kapellenstr. 15 65555 Limburg / Germany Telefon: +49 6431 95770 Telefax:...

MOBA Mobile Automation AG • Kapellenstr. 15 • 65555 Limburg / Germany

Telefon: +49 6431 95770 • Telefax: +49 6431 9577177 • E-Mail: [email protected] • www.moba.de06/2010

Basic knowledge

Asphalt paving

2Asphalt paving – basic knowledge_sf

1

2 3

4

The asphalt mix is delivered into the receiving hopper (1) of the paver as it pushes the rear tyres of the haul truck (not shown). The mix is carried from the hopper to the rear of the machine by twin or single conveyors (2), and then on to the auger (3) which distributes the mix laterally over the entire working width of the screed (4).

Material flow

3Asphalt paving – basic knowledge_sf

Material flow

1

2

3

The material flow is regulated by the speed of the conveyors (2), and the auger (3).

The conveyor speed is automatically correlated to the forward speed of the paver and the height of the material which is spread out ahead of the screed.

This height has to be kept as constant as possible.

4Asphalt paving – basic knowledge_sf

The screed levels and pre-compacts the asphalt mix to a specified thickness.

To produce an even surface - even if the underlying base is somewhat irregular - the screed is constructed as a “floating” working tool.

Therefore the screed (1) is attached to the paver by side arms (2) at tow points (3) located on either side of the paver. Via the tow points the angle of the screed can be varied and thus cause a slow rise or fall of the screed.

The screed

12

3

5Asphalt paving – basic knowledge_sf

The angle between the bottom plate of the screed and the surface being paved is known as the angle of attack.

The angle of attack may be increased or decreased by raising or lowering the tow point level.

Any movement of the tow points results in a rise or fall of the screed by getting more or less material under the screed.

Angel of attack

lower angle

flow down

higher angle

flow up

6Asphalt paving – basic knowledge_sf

Effects which cause a height-change of the screed

Screed flow up by» “Raising” of the tow point » Increasing material feed» Increasing driving speed » Decreasing material temperature

Screed flow down by» “Lowering” the tow point» Decreasing material feed» Reducing driving speed» Increasing material temperature

Screed stays level when» all factors remain constant

Effects on the level of the screed

7Asphalt paving – basic knowledge_sf

» affected by material (& temperature)!

» no direct reaction – slow acting!

» no regulation without machine forward movement!

» affected by driving speed

» high, constant ,vibration

Characteristics of screed levelling

8Asphalt paving – basic knowledge_sf

Use of automation

To ensure all influences that can affect the screed level are kept as constant as possible, different sub-ranges can be automated.Thus easing the number of tasks the operator has to manage and therefore creating good conditions for a continuous, high quality, finish.

Automation is available for the following functions :

Material (feeder) controlThe amount of material - transported by the conveyor and auger – is observed by sensors. All detected changes cause a reaction to the valve outputs, thus slowing down or speeding up the feed of material.

Screed levellingThe height and cross inclination of the screed are adjusted by grade- and slope-controllers following a default reference (string line, ground, curb, laser, . . .).Thus irregularities - in the sub-base material or caused by movements of the tractor - can be compensated for.

Ignition-/Temperature controlSensors detect the actual temperature of the screed and, when required, activate heating (gas ignition) to the set value.

9Asphalt paving – basic knowledge_sf

Why construct using several layers ?

The aim is to produce an even, homogeneous surface.

To minimise irregularities the asphalt is usually deposited in several layers.

10Asphalt paving – basic knowledge_sf

Second layer: 3 (4) cm

after additional roller compaction of 20% %

Height difference: 2 mm

Why construct using several layers ?

Base layer: 5 (10) cm

after additional roller compaction of 20%

Height difference: 1 cm

5 cm Foundation:

Height difference: 5 cm

1 cm

10 cm

2 mm

4 cm

5 cm

3 cm

Top layer: 2 cm

after additional roller compaction of 20%Height difference: 0.4 mm

2 cm

0.4 mm

Using a good reference to control the height: The irregularities minimise layer by layer

11Asphalt paving – basic knowledge_sf

Why construct using several layers ?

Overcoming problems during street maintenance - With only one layer to remove the irregularities

Layer: 4 cm

after additional roller compaction of 20%

Height difference (remains): 5 cm

5 cm

4 cm4 cm

5 cm Surface

Height difference: 5 cm

If constructed with a constant thickness: can only copy a bad profile

Using a good reference to control the height : all but 20% of the irregularities can be removed

Layer: 4 (9) cm

after additional roller compaction of 20%

Height difference (now only): 1 cm1 cm

9 cm4 cm