MMOG Logistics English

download MMOG Logistics English

of 85

Transcript of MMOG Logistics English

  • 7/28/2019 MMOG Logistics English

    1/85

    Global MMOG/LE

    Global MMOG/LE

    Steps to Enable Macro Description of Macro Macro Short Name

    Ctrl Shift E Print Entire Document Entire (60 Pages)

    Ctrl Shift S Print Self-Assessment Only Self (34 Pages)

    Ctrl Shift C Print Scoring Summary Only Score (8 Pages)

    Ctrl Shift G Print Gap Analysis Only Gap (3 Pages)

    Ctrl Shift L Print Glossary Only Glossary (9 Pages)

    M-7Issue:v1, Release 2 Dated 12/04

    Replaces:, Dated

  • 7/28/2019 MMOG Logistics English

    2/85

    Global MMOG/LE

    Master Global Materials Management Operations Guidelines /

    Logistics EvaluationM-7 Version 1, Release 2 Date: 12/2004

    International Copyright Information

    This standard is subject to International Copyright, as shown herein and unauthorizedreproduction is not permitted. Contact one of the associations below to discuss

    reproduction permission. If translated, this manual has been translated and published

    for guidance only and is intended to help the understanding of the official English

    version.

    AIAG Copyright and Trademark Notice:

    The contents of all published materials are copyrighted by the Automotive Industry

    Action Group unless otherwise indicated. Copyright is not claimed as to any part of

    an original work prepared by a U.S. or state government officer or employee as part

    of the persons official duties. All rights are preserved by AIAG, and content may notbe altered or disseminated, published, or transferred in part of such content. The

    information is not to be sold in part or whole to anyone within your organization or to

    another company. Copyright infringement is a violation of federal law subject to

    criminal and civil penalties. AIAG and the Automotive Industry Action Group are

    registered service marks of the Automotive Industry Action Group.

    2003 Automotive Industry Action Group

    2003 Automotive Industry Action Group

    2003 Odette International Ltd. All rights reserved

    M-7Issue:v1, Release 2 Dated: 12/04

    Replaces:, Dated

  • 7/28/2019 MMOG Logistics English

    3/85

    Global MMOG/LE

    Global MMOG/LE

    AIAG

    Cara Besh DaimlerChrysler Corporation

    Morris Brown AIAG

    Connie Harde American Axle & Manufacturing, Inc.

    Michael Howard Ford Motor Company

    Aidan Hughes Gates Corporation

    Chuck Koehn DaimlerChrysler Corporation

    Donna LeFaive JCI Corporation

    Kevin Lockwood Universal Bearings Corporation

    Eric Minehart Ford Motor Company

    ODETTE

    Roger Bergsten Volvo Car Corporation

    Rob Brown SMMT Industry Forum

    Jacky Cousin GALIA

    Mark Evans SMMT Industry Forum

    Gerard Graufogel PSA

    Helena Holmgren Robert Bosch GmbH

    Gerhard Paulinz Volvo Truck Corporation

    Henry Rosten Volvo Powertrain Corporation

    Aurelien Rouquet GALIA

    Jeff Turner SMMT Industry ForumJoerg Vollmer Robert Bosch GmbH

    AIAG and Odette would like to acknowledge and thank the representatives of all the companies listed for

    their input and help in completing this document.

    M-7Issue:v1, release 2, Dated 12/03

    Replaces:, Dated

  • 7/28/2019 MMOG Logistics English

    4/85

    Global MMOG/LE

    Global MMOG/LE

    !

    "#"#$

    %&

    !'%!'"#$(!$

    %!$&

    )'!'*+++

    !',

    "

    *+++-"

    #"#$.

    /#

    !$0*+++

    "1!21"

    33

    "

    (

    #!'.

    "

    #

    42

    5

    . '

    "

    M-7 Issue:v1, Release 2, Dated : 12/04Replaces:, Dated:

  • 7/28/2019 MMOG Logistics English

    5/85

    Global MMOG/LE

    Global MMOG/LE

    6

    3

    4

    3

    '5

    5

    ,

    -.

    3

    '

    '

    5

    "

    746(

    M-7 Issue:v1, Release 2, Dated : 12/04Replaces:, Dated:

  • 7/28/2019 MMOG Logistics English

    6/85

    Global MMOG/LE

    Global MMOG/LE

    534

    849

    #

    )

    24

    !"##$

    M-7 Issue:v1, Release 2, Dated : 12/04Replaces:, Dated:

  • 7/28/2019 MMOG Logistics English

    7/85

    Global MMOG/LE

    Global MMOG/LE

    6

    613

    6:#';!/',1;#'$

  • 7/28/2019 MMOG Logistics English

    8/85

    Global MMOG/LE

    Global MMOG/LE

    .

    "

    "(

    "(

    /!

    '(&)*!*+,)*

    Each question is multiplied by a weight factor:

    F1 = Low (1 point each)

    F2 = Medium (2 points each)

    F3 = High (3 points each; any non-compliance will result in overall evaluation to be Level Cdue to critical competency factor.

    Enter "X" in each check box if process is effectively implemented at your organization

    -."

    5.

    DD

    5.#,+EF

    /,GBH,

    BI,#

    $."5.

    #1:!A5/!%I

    &

    5.4,JKF

    +EF/,G*HBH

    BI,4

    (."

    5.2,

    #

    5./#/

  • 7/28/2019 MMOG Logistics English

    9/85

    Global MMOG/LE

    Global MMOG/LE

    /,0

    1

    ",3L

    2

    3"

    #

    !$2'

    2

    .

    2

    #

    '

    5

    M#"2"1

    N>

  • 7/28/2019 MMOG Logistics English

    10/85

    Global MMOG/LE

    Global MMOG/LE

    "

    #

    -

    1;

    ;,2

    &6'),+'(7),

    -2

    M-7 Issue:v1, Release 2, Dated : 12/04Replaces:, Dated:

  • 7/28/2019 MMOG Logistics English

    11/85

    Global MMOG/LE

    Global MMOG/LE

    1. STRATEGY AND IMPROVEMENT

    Objectives

    Vision & Strategy

    Measurement, Analysis and

    Action Plans

    Continuous Improvement

    Supply Chain Development

    M-7 11Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    12/85

    Global MMOG/LE

    Global MMOG/LE

    Each question is multiplied by a weight factor:

    F1 = Low (1 point each)

    F2 = Medium (2 points each)

    F3 = High (3 points each; any non-compliance will result in overall evaluation to be Level C

    due to critical competency factor.

    Enter "X" in each check box if process is effectively implemented at your organization

    1.1 Vision and Strategy

    1.1.1The organization has a strategy that ensures the Materials Planning and Logistics vision is

    achieved.

    Why?For the Materials Planning and Logistics process to be efficient and effective, it needs to be

    acknowledged as an important part of the operation and receive adequate resources.

    Good knowledge of long-term strategy is a condition for employees to work consistently and be pro-

    active.

    Criteria:

    F2 A documented vision exists for the Materials Planning and Logistics function.

    F2A documented strategy exists with activities for implementing the Materials Planning and Logistics

    vision.

    F2The Materials Planning and Logistics vision and strategy is linked to the organization's overall

    objectives, including customer requirements and continuous improvement.

    F2The Materials Planning and Logistics vision and strategy is communicated and understood within

    the organization.

    Optional comments may be added here supporting the organization's current state.

    1.2 Objectives

    1.2.1Objectives relative to the Materials Planning and Logistics function are defined,

    communicated and understood within the organization.

    Why?Objectives allow departments and employees to focus on areas of importance to achieve customer

    satisfaction and the organization's Materials Planning and Logistics strategy.

    Criteria:

    F2All objectives are measurable and consistent with the organization's Materials Planning and

    Logistics strategy.

    F2Objectives are accepted by all relevant functions and are clearly cascaded throughout the

    organization.

    F2 Objectives are reviewed with senior management at planned intervals.

    M-7 12Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    13/85

    Global MMOG/LE

    Global MMOG/LE

    Optional comments may be added here supporting the organization's current state.

    1.2.2 Key Performance Indicators (KPIs) shall cover objectives for all areas of the MaterialsPlanning and Logistics process.

    Why? KPIs are used to identify the organization's current performance and areas for improvement.

    Criteria: Minimum requirement (Additional KPIs to be covered by specific customer requirements).

    Delivery

    F3 Delivery performance to customer.

    F3 Supplier delivery performance.

    F3 Build-to-Schedule(productivity: plan vs. actual).

    F2 Lead times for all supply chain processes (physical and information).

    Quality

    F2 Materials Planning and Logistics Quality (e.g., documentation, messages, packaging and labeling).

    Cost

    F2 Materials Planning and Logistics costs (e.g., Premium freight, packaging, handling and storage

    F1 Stock levels / stock turn broken down into raw material, WIP, finished goods.

    Optional comments may be added here supporting the organization's current state.

    1.3 Measurement, Analysis and Action Plans

    1.3.1 Objectives are measured, analyzed, and action plans created where necessary.

    Why?Measurement and analysis is necessary to ensure awareness of current performance and to engage

    employees in the improvement process.

    Criteria:

    F2Performance against objectives is monitored at planned intervals and reviewed with senior

    management.

    M-7 13Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    14/85

    Global MMOG/LE

    Global MMOG/LE

    F2 All relevant personnel/functions are informed about performance at planned intervals.

    F2A structured problem solving method is used to determine root cause(s) and prevent recurrence of

    material problems.

    F1Graphical analysis tools, (e.g., Pareto graphs) displaying historical and trend data are used to track

    critical areas over time.

    Optional comments may be added here supporting the organization's current state.

    1.3.2Corrective and preventive actions, identified by KPI analysis, to improve performance are

    documented.

    Why?Documentation helps to ensure that identified action plans have been successfully implemented and

    results shared across similar processes.

    Criteria:

    F2The management prioritizes documented action plan items. The action plan should include the

    action, responsibility, timing and allocated resource.

    F2

    Evaluations of corrective/preventive actions are performed at the conclusion of each action plan.

    The review shall be used to determine the effectiveness, the application to similar processes and the

    need for any further action.

    Optional comments may be added here supporting the organization's current state.

    1.4 Continuous Improvement

    1.4.1Continuous improvement within the supply chain is driven through a well-established

    process.

    Why?Improvement activities throughout the supply chain are necessary in order to achieve overall

    customer satisfaction.

    Criteria:

    F1A defined process supported by management for continuous improvement is used within the entire

    organization and with all supply chain partners.

    F1Employees have a documented responsibility for and are allowed time to work on continuous

    improvement tasks.

    F1 The organization encourages employee involvement through an active suggestion program.

    Optional comments may be added here supporting the organization's current state.

    M-7 14Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    15/85

    Global MMOG/LE

    Global MMOG/LE

    1.4.2There shall be a process to identify and take corrective actions on deficiencies and/or

    unstable processes found during internal assessments.

    Why?For organizations to remain competitive and reduce cost, specific areas of improvement need to be

    identified.

    Criteria: Minimum requirement (Additional areas to be covered by specific customer requirements).

    F3 Bottle neck processes.

    F2 Production batch/lot sizes.

    F2 Set-up/Change-over times.

    F2 Throughput time.

    F1 Reduction of complete physical inventories.

    Optional comments may be added here supporting the organization's current state.

    1.5 Supply Chain Development

    1.5.1 Actions are taken to improve the relationship between all parties in the supply chain.

    Why?A strong and successful relationship requires mutual trust and understanding. Supply chain

    optimization relies on organizations working together.

    Criteria:

    F1 A structured approach is in use for development of all relationships.

    F1 Action plans, processes and relationships of the parties in the supply chain are documented.

    F1Methods of analysis are used to assess the supply chain: {e.g. SWOT analysis (Strengths,

    Weaknesses, Opportunities, Threats), Benchmarking, Business Networks}

    Optional comments may be added here supporting the organization's current state.

    1.5.2Internal customer satisfaction objectives related to Materials Planning and Logistics are

    identified, measured and communicated within the organization.

    Why?Internal customer satisfaction is important for facilitating continuous improvement in response to

    customer requirements.

    Criteria:

    M-7 15Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    16/85

    Global MMOG/LE

    Global MMOG/LE

    F2 Clear understanding of internal customer requirements.

    F2 Internal customer satisfaction is measured (e.g., press shop parts supplied to the assembly area).

    F2 Measurements are fully implemented, used and communicated to relevant functions.

    Optional comments may be added here supporting the organization's current state.

    M-7 16Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    17/85

    Global MMOG/LE

    Global MMOG/LE

    2. WORK ORGANIZATION

    Organizational

    Processes

    Organizational Procedures

    Resource Planning

    Work Environment & Human Resources

    M-7 17Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    18/85

    Global MMOG/LE

    Global MMOG/LE

    2.1 Organizational Processes

    2.1.1Materials Planning and Logistics processes are described starting from customer interface,

    through internal production until supplier interface.

    Why?

    It is vital to gain an overall view and understanding of your own and your business partners

    processes in order to provide a good foundation for continuous improvement.

    Criteria:

    F1

    There is a documented organizational structure in place to ensure appropriate focus (e.g., direct

    reporting to the senior management) and resources for all Materials Planning and Logistics

    processes.

    F1Documentation exists (e.g., flow charts) describing the information flow of all Materials Planning and

    Logistics processes, including interfaces with other functions and business partners.

    F1Documentation exists (e.g., flow charts) describing the physical flow aspect of all Materials Planning

    and Logistics processes, including interfaces with other functions and business partners.

    F1 There is an active document control procedure in place. (as defined within TS 16949/QS9000)

    Optional comments may be added here supporting the organization's current state.

    2.2 Organizational Procedures

    2.2.1 Organizational procedures exist for all functions within Materials Planning and Logistics.

    Why? To ensure a standard way of working and help facilitate learning, it is important to have documentedprocedures.

    Criteria:

    F2The organization has procedures, which are evaluated and implemented to ensure compliance with

    the Materials Planning and Logistics vision.

    F2

    Documented procedures for all customer interface aspects of the Materials Planning and Logistics

    process exist (e.g., customer order planning, stock control, packaging procedures and transport

    management).

    F1

    Documented procedures for all internal aspects of the Materials Planning and Logistics process exist

    (e.g., assembly and production planning, material handling, stock control and warehousing including

    MRO inventory).

    F1

    Documented procedures for all supplier interface aspects of the Materials Planning and Logistics

    process exist (e.g., supplier performance assessment, receipt of material, stock control and

    requirement calculations).

    Optional comments may be added here supporting the organization's current state.

    M-7 18Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    19/85

    Global MMOG/LE

    Global MMOG/LE

    2.3 Resource Planning

    2.3.1 Resource flexibility and availability are optimized.

    Why?It is essential that resources are optimized to fulfill capacity requirements of all the Materials

    Planning and Logistics operations.

    Criteria:

    F2The organization has the ability to adapt its human resources in order to manage and balance

    workload (e.g., flexibility agreements, peak hours, absenteeism and different industrial calendars).

    F2The organization conducts periodic reviews to ensure sufficient resources (e.g., space and

    equipment) are allocated for all Materials Planning and Logistics processes.

    F1 Overtime is not used as a long-term solution for staffing requirements.

    Optional comments may be added here supporting the organization's current state.

    2.3.2Contingency plans shall exist to avoid disruptions when something unexpected happens in

    the supply chain

    Why?Without contingency plans, any disruption within the Materials Planning and Logistics process might

    endanger deliveries to the customer (including e.g., assembly lines, workshops).

    Criteria:

    F3

    The organization's contingency plans shall be implemented by a pre-determined function when an

    emergency occurs and the system shall be tested and validated periodically.

    F3 Personnel shall be trained in contingency procedures.

    F2

    Documented and proven procedures for all potential disruptions are identified with appropriate

    action and recovery plans, including production and data recovery (e.g., computer/communication

    failures, industrial disputes, transport and production disruption).

    Optional comments may be added here supporting the organization's current state.

    2.3.3A system exists for highlighting and communicating with both customers and suppliers

    within the plant, any incident or deviation from the production plan.

    Why?Appropriate management of internal customers and suppliers should rely upon communication

    upstream and downstream of any incidents that could affect the normal production process.

    Criteria:

    F1

    There are procedures in place to highlight and communicate incidents or deviations, (e.g., schedule

    information, early warning of delays and stoppages), from the production plan, (e.g., regular

    meetings, reporting and ad-hoc meetings).

    M-7 19Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    20/85

    Global MMOG/LE

    Global MMOG/LE

    Optional comments may be added here supporting the organization's current state.

    2.4 Work Environment & Human Resources

    2.4.1 Plans exist for the control and improvement of the work environment.

    Why?People are organizations' main asset, and the organization is responsible for providing safe and

    healthy working conditions.

    Criteria:

    F2All applicable safety and environmental regulations (including respective certification) have been

    identified and met.

    F1Management are actively responsible for providing and improving the work environment (e.g., 5S/C

    program, ergonomic principles).

    Optional comments may be added here supporting the organization's current state.

    2.4.2The roles and responsibilities within the Materials Planning and Logistics function are clearly

    documented.

    Why? Clearly defined roles and responsibilities reduce the risk of conflicts and define ownership of issues.

    Criteria:

    F1

    Clearly defined job descriptions/skills matrices exist and are regularly reviewed and updated for each

    key function within Materials Planning and Logistics.

    F1All key tasks have employee backups designated to manage workflow when the primary employee is

    not available.

    Optional comments may be added here supporting the organization's current state.

    2.4.3 There is a process identifying current and required skills within the organization.

    Why? Understanding the competence gap within the organization is important for improvement.

    Criteria:

    F1The competence required for each position and function within the Materials Planning and Logistics

    department have been identified and documented.

    F1The current competence level for each employee and function within the Materials Planning and

    Logistics department have been identified and documented.

    M-7 20Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    21/85

    Global MMOG/LE

    Global MMOG/LE

    F1The procedure for identifying training needs based on a gap analysis of current versus required

    skills, is documented, appropriately distributed and used for training recommendations.

    F1Training objectives are clearly defined within the Materials Planning and Logistics strategy,

    understood by all employees concerned and monitored by management.

    Optional comments may be added here supporting the organization's current state.

    2.4.4A training and development program exists for each employee in the Materials Planning and

    Logistics function.

    Why? A flexible and effective organization requires competent personnel.

    Criteria:

    F2There is a process to ensure sufficient resources (e.g., relief cover/backup) are available to support

    and implement the training needs identified.

    F1 Individual training and development plans exist for each employee.

    F1Documented training and development plans are documented and regularly revised (minimum

    once/year).

    F1There is a process between employee and management to monitor the effectiveness of training and

    to derive necessary actions.

    Optional comments may be added here supporting the organization's current state.

    2.4.5Actions are taken to improve employee motivation and empowerment in the Materials

    Planning and Logistics function.

    Why?To ensure employees are motivated to perform at their best, they need encouragement and to feel

    that their efforts are worthwhile.

    Criteria:

    F1The performance of the organization and Materials Planning and Logistics function is communicated

    to employees on a regular basis.

    F1 Regular appraisal review and feedback is given to each employee (minimum once/year).

    F1Follow-up from appraisal review leading to the identification of improvement opportunities and action

    plans exists on a regular basis.

    Optional comments may be added here supporting the organization's current state.

    M-7 21Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    22/85

    Global MMOG/LE

    Global MMOG/LE

    3. CAPACITY & PRODUCTION PLANNING

    Product

    Realization

    Capacity Planning

    Production Planning

    Systems Integration

    M-7 22Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    23/85

    Global MMOG/LE

    Global MMOG/LE

    3.1 Product Realization

    3.1.1The organization's Materials Planning and Logistics function shall formally participate in, and

    sign off on, the Product Realization process.

    Why?

    The material organization's physical sign off verifies their involvement in the early stages of the

    Product Realization process and therefore are prepared to support the organization at the start of

    production.

    Criteria:

    F3 Material's function shall participate in and sign off on the Product Realization process.

    Optional comments may be added here supporting the organization's current state.

    3.2 Capacity Planning

    3.2.1

    The organization shall perform a comparison of its resources against the customer's long,

    medium and short-term requirements. A process shall be in place that ensures prompt

    communication to the customer of any risk that could affect their operations.

    Why?

    A major goal of the scheduling system shall be to review customer requirements far enough in

    advance to detect potential problems in meeting those customer requirements. This process must

    occur in a timeframe that allows for corrective action and minimizes the impact to the customer.

    Criteria:

    F3

    Comparison of resources versus customer requirements shall be reviewed upon receipt of forecast

    requirements (e.g., 830/DELFOR), comparing every week of the forecast (e.g., from week 3 tomonth 6 of the planning horizon) sent by customers.

    F3

    Resources versus customer requirements shall be reviewed upon receipt of shipping requirements

    (e.g., 862/DELJIT), comparing daily ship requirement (usually current week and week 2) sent by

    customers.

    F3There shall be a process in place to notify customers of any significant resource limitations in

    meeting the requirements.

    F1

    Time and cost for administrative, (e.g., receiving, planning and despatch), and physical (e.g.,

    loading, unloading of trucks) operations of the Materials Planning and Logistics function are

    quantified.

    Optional comments may be added here supporting the organization's current state.

    3.2.2

    The organization's capacity planning process has the flexibility to ensure that the Product

    Approval Process (PAP) requirements are available in a timely manner to support customer

    change-overs/launches.

    M-7 23Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    24/85

    Global MMOG/LE

    Global MMOG/LE

    Why?The organization's capacity planning process needs to be able to account for regular production, as

    well as PAP requirements to ensure that production requirements are met.

    Criteria:

    F1 PAP requirements are prioritized accordingly within the scheduling system.

    F1There is a process for building an inventory buffer of current parts prior to production time needed

    for new model parts approval/evaluation.

    F1PAP reviews are held with the participation of Scheduling, Production, Material Control, Engineering,

    etc. on a regular basis to resolve any issues with meeting customer requirements.

    Optional comments may be added here supporting the organization's current state.

    3.2.3The organization implements measures to minimize obsolescence of Raw Material, WIP and

    Finished Goods.

    Why?For obsolescence claims purposes, a process exists for recording and maintaining maximum

    material authorization from the customer.

    Criteria:

    F1

    The organization has a process in place to communicate running change and balance-out parts for

    final production runs to ensure no over-production and outside purchased items are ordered to the

    piece.

    F1Scheduling system will not generate production orders above customer requirements for balance-out

    items.

    Optional comments may be added here supporting the organization's current state.

    3.2.4 There is a process to ensure the availability of service/spare parts.

    Why? To satisfy the customer's need for spare parts without jeopardizing the production of current parts.

    Criteria:

    F2Requirements for non-current parts are calculated and ensured for the entire life cycle of the product

    as required by the customer.

    F1Quantities are communicated and managed throughout the organization, based on customer

    requirement orders to ensure on-time deliveries.

    F1Documented agreements exist to ensure the supply of service/spare parts (e.g., minimum order

    quantity, standard pack size).

    Optional comments may be added here supporting the organization's current state.

    M-7 24Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    25/85

    Global MMOG/LE

    Global MMOG/LE

    3.3 Production Planning

    3.3.1A process shall exist to plan production requirements and to maintain the parameters of the

    production planning system.

    Why?

    A production planning and monitoring system contributes to both efficient information and material

    flow.

    Criteria: If your processes are automated then "check" both the manual and automated criteria below.

    F3The scheduling system shall consider customer requirements when generating production

    schedules.

    F3

    A set of parameters, (e.g., transport time, lead times, inventory levels, packaging), and internal

    production requirements, (e.g., supplier constraints, scrap rates set-up times), shall be integrated

    into the production planning system manually.

    F1

    A set of parameters, (e.g., transport time, lead times, inventory levels, packaging), and internal

    production requirements, (e.g., supplier constraints, scrap rates set-up times), are integrated into

    the production planning system automatically.

    F1 A flexible production planning system is synchronized with all relevant internal and external systems.

    F1The production planning system and its parameters, (e.g., scrap rate, set-up time, lot size, etc.), are

    updated at planned intervals by a clearly defined responsibility.

    Optional comments may be added here supporting the organization's current state.

    3.3.2 The production scheduling system supports lean manufacturing (e.g., pull systems).

    Why? To ensure production schedules reflect customer releases and shipping schedules.

    Criteria:

    F1Pull system concepts are integrated within the production planning process as seen on the shop

    floor.

    F1A daily forecast schedule of part numbers and quantities due by date is utilized, integrating pull

    system techniques into the production planning process.

    F1 Pull system automatically offsets losses or gains based upon inventory verification.

    Optional comments may be added here supporting the organization's current state.

    3.4 Systems Integration

    M-7 25Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    26/85

    Global MMOG/LE

    Global MMOG/LE

    3.4.1The customer information shall be processed directly into the organization's planning and

    scheduling systems.

    Why?Direct electronic transfer of data will improve the transfer speed, reduce the possibility of error and

    reduce the cost.

    Criteria:

    F3

    Customer schedule information shall be automatically integrated into the organization's releasing

    system to avoid manual transference of data by using ODETTE/AIAG electronic communication

    standards or any other web based electronic standard.

    Optional comments may be added here supporting the organization's current state.

    3.4.2The organization sets the timing of the Material Requirements Planning System (MRP)

    process to coincide with the receipt of the expected customer requirements.

    Why?The MRP system should calculate the schedule based on the most current information available

    from the customer.

    Criteria:

    F2MRP receives the expected customer requirements prior to the actual MRP run to calculate daily

    production operating plans.

    Optional comments may be added here supporting the organization's current state.

    M-7 26Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    27/85

  • 7/28/2019 MMOG Logistics English

    28/85

    Global MMOG/LE

    Global MMOG/LE

    4.1 Communication

    4.1.1The organization maintains a process to ensure a co-operative communication based on

    actual and adequate information for both parties.

    Why?

    To maintain customer relations, prevent misunderstandings and ensure continued business based

    on co-operative communication.

    Criteria:

    F2There are agreed contingency plans established between both parties to maintain permanent

    communication during bottle-neck situations.

    F2The customers' goals regarding Materials Planning and Logistics performance are clearly defined

    (e.g., Customer delivery instructions/schedules), visualized and followed-up by the organization.

    F1

    A contact list exists containing name, function, method of communication (e.g., phone number, fax

    number, e-mail address, language spoken, etc), hours of availability and deputies/back-ups for

    each Materials Planning and Logistics function from its customers.

    F1 The contact list must support the entire scheduled operating hours of all customers.

    F1There is a documented process (including process owner) for maintaining contact information

    internally and updating the contact information on the customers' system.

    Optional comments may be added here supporting the organization's current state.

    4.1.2The organization shall receive requirements planning and shipping information

    electronically, when available from the customer.

    Why?

    Electronic data transfer reduces the possibility of a typographical error or incorrect translation ofdata when human intervention is involved. Speed is increased by the electronic/mechanical transfer

    of data while reaction time updates in customer requirements for pre-production, production and

    service parts is improved.

    Criteria:

    F3Electronically communicated delivery forecasts (e.g., 830/DELFOR/planning releases) shall be

    received and processed without manual entry.

    F3Electronically communicated call off's (e.g., 862/DELJIT, shipping schedules, sequenced shipping

    schedules) shall be received and processed without manual entry.

    F1

    Receipt and understanding of electronic communication should be in accordance with international

    automotive guidelines (e.g., AIAG/Odette.)

    Optional comments may be added here supporting the organization's current state.

    4.1.3The organization shall have a process to ensure that any potential problems that could

    impact the customer operation are communicated as soon as they are identified.

    M-7 28Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    29/85

    Global MMOG/LE

    Global MMOG/LE

    Why?For the supply chain to remain uninterrupted at all times, any problems with the customer must be

    resolved in a timely manner.

    Criteria:

    F3

    There shall be documented procedure in place for the Materials Planning and Logistics personnel to

    notify the customer and respond immediately to any situation whether identified by the organization

    or the customer, that could negatively impact the customer's business.

    F3

    Differences shall be resolved with the appropriate customer contact prior to shipment time if the

    agreed requirement cannot be met (e.g., transportation mode, quantity-shipped discrepancies,

    packaging, etc).

    F3The organization shall use interactive inventory management systems where they are available from

    the customer (e.g., DDL, Smart, other VMI systems).

    Optional comments may be added here supporting the organization's current state.

    4.2 Packaging and Labeling

    4.2.1The organization shall have a procedure for packaging development, coordinated with the

    Product Approval Process.

    Why?To ensure that the packaging efficiently supports material flow requirements as handling and

    distribution.

    Criteria:

    F3

    The organization shall have a process and supporting documentation to define standard packaging,

    (usually reusable container), and back-up packaging (usually expendable containers), and pack size

    before start of production (e.g., agreements about packaging type and rules for use with customer,

    involvement of all internal departments connected with the packaging process).

    F2 Requirements for packaging development/specification is agreed and documented.

    F2The organization periodically audits shipments and conducts a physical review of packaging to

    ensure compliance with defined packaging requirements.

    F1Customer specific packaging should be developed for integration into the manufacturing process

    (e.g., max. use of transportation conveyance, transport optimization).

    F1When shipping runoff, pilot, PAP parts, the organization makes all shipments in assigned containers

    so that the customer can validate the container use in their material system.

    Optional comments may be added here supporting the organization's current state.

    4.2.2The organization manages the container process to ensure that the availability of

    returnable/non-returnable containers is adequate to support the material flow requirements.

    Why?Adequate quantity and quality of returnable/non-returnable containers need to be available to keep

    material protected as well as support any production needs.

    M-7 29Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    30/85

    Global MMOG/LE

    Global MMOG/LE

    Criteria:

    F2A documented control system exists for the procurement, allocation and monitoring of all packing

    material (e.g., returnable containers, expendable packaging, dunnage, spacers).

    F2

    A documented and implemented process exists to ensure that returnable container inventory and

    their availability in quantity and quality is adequate to cover customer requirements.

    F2A documented, customer approved process exists in case of missing, damaged, dirty or otherwise

    unsuitable packaging.

    F2There is a process to notify the customer for each shipment when alternative or back-up packaging

    is used.

    F1A documented process for the storage of customer-supplied packaging is available and followed

    (e.g., suitable storage and cleaning facilities for returnable containers).

    Optional comments may be added here supporting the organization's current state.

    4.3 Shipping

    4.3.1The organization controls its processes to assure that the physical shipments correspond

    with the customer demand.

    Why?To ensure accurate shipment, container and label information and any other necessary

    documentation will fulfill customer requirements.

    Criteria:

    F2The implemented and documented process to detect quantity shipped discrepancies is automated

    (e.g., scan based shipment and loading control systems).

    F2The organization ensures that any quantity-shipped disagreements with the customer are detected

    and reconciled in a timely manner without cost penalties to the customer.

    F2

    Dock operations (e.g., capacity of preparation areas, loading bays, limits of loading and unloading,

    rules of freight capacity, schedule of dispatch handling) are optimized, using scheduled window

    times and carrier on-time performance is tracked.

    Optional comments may be added here supporting the organization's current state.

    4.3.2The organization shall have a process to ensure complete and accurate data content and

    timely transmission of all Advanced Shipping Notices (ASN).

    Why?Advanced Shipping Notices (ASN) transmits relevant information to the customer so they are aware

    of what the supplier has shipped and can plan accordingly.

    Criteria:

    F3

    The organization shall verify the data contents of shipping labels, (the use of electronic based

    support systems such as RFID or scanning is mandatory for some customers), to assure

    consistency between container content, labels and documentation.

    M-7 30Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    31/85

    Global MMOG/LE

    Global MMOG/LE

    F3The organization shall ensure that the data content of all ASN's is complete and accurate in

    accordance with customer requirements.

    F3All shipments, including documentation and labeling, shall be prepared to customer, industry and

    government standards and requirements (e.g., customs handling) including carrier routings.

    F3The shipment process shall ensure that each ASN is transmitted a the time of conveyance

    departure.

    Optional comments may be added here supporting the organization's current state.

    4.3.3The organization inspects and calibrates all shipment quantity-determination equipment at

    planned intervals to an acceptable accuracy level, as defined by the customer.

    Why?

    To ensure accurate shipment to the customer, all shipment determination equipment must be

    calibrated at planned intervals.

    Criteria:

    F2There is a procedure describing the proper use of shipment quantity-determination equipment (e.g.,

    scales, counters).

    F2 All quantity-determination equipment is calibrated to a recognized standard at planned intervals.

    F1The inspection status and date for all quantity-determination equipment is clearly displayed on the

    equipment.

    F1 An inspection schedule is created and one person has the responsibility of equipment calibration.

    Optional comments may be added here supporting the organization's current state.

    4.4 Transportation

    4.4.1The organization shall assure the transport of finished goods satisfies customer

    requirements (e.g., carrier, mode, special equipment, cost responsibility).

    Why?To ensure transport to the customer according to agreed delivery agreements/conditions with

    customer.Criteria:

    F3For organization managed transportation the carrier/Lead Logistics Provider is selected and shall be

    assessed regarding logistics, f lexibility and quality parameters.

    F2Appropriate equipment (e.g., bracing, banding) is used to ensure the product is delivered to the

    customer damage-free.

    F1Transportation planning is included from beginning of the products life cycle and the carrier/Lead

    Logistics Provider is involved as early as possible (e.g., product development process).

    M-7 31Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    32/85

    Global MMOG/LE

    Global MMOG/LE

    F1The organization has a process to plan transportation capacity together with the carrier/Lead

    Logistics Provider in line with its own processes and their capacities.

    F1The organization has established documented contingency plans in the event of failure of transport,

    including quantified alternative methods of transport.

    Optional comments may be added here supporting the organization's current state.

    4.4.2Optimization of transportation capacity should be considered during the supply chain design

    phase.

    Why?Permanent management of transportation utilization will lead to cost reduction opportunities as well

    as environmental savings.

    Criteria:

    F1The organization regularly explores opportunities to reload inbound conveyances with outbound

    product.

    F1Disposition of all empty transportation capacities (both inbound and outbound) should be done on a

    daily basis to ensure that FIFO is occurring to minimize detention and demurrage related charges.

    Optional comments may be added here supporting the organization's current state.

    4.5 Customer Satisfaction and Feedback

    4.5.1The organization has a process to assess customer satisfaction whether or not the customer

    provides feedback.

    Why?Superior Materials Planning and Logistics performance will ensure customer satisfaction, which will

    lead to a long-term business relationship.

    Criteria:

    F2

    Based on the customer's feedback or industry standards, the organization develops measures to

    improve customer satisfaction. Where feedback is not automatically given from the customer, the

    organization solicits this information.

    F1 The organization has a process to regularly assess its performance to all of its customers.

    F1

    The measures are regularly reviewed internally by the management (e.g., warning of unfilled

    requirements) and externally (e.g., Logistics performance measures), as required with the customer.

    An adequate visualization method (e.g., customer satisfaction monitor, charts, graphs) is used.

    Optional comments may be added here supporting the organization's current state.

    M-7 32Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    33/85

    Global MMOG/LE

    Global MMOG/LE

    5. PRODUCTION & PRODUCT CONTROL

    Material

    Identification

    Inventory

    Engineering Change Control

    Traceability

    M-7 33Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    34/85

    Global MMOG/LE

    Global MMOG/LE

    5.1 Material Identification

    5.1.1There shall be a process/method in place to ensure all parts are labeled accurately and

    identified easily.

    Why?

    Material that is improperly identified could result in misplaced material, lost time and/or production

    disturbances.

    Criteria:

    F3The organization shall have a process to correctly identify all material, including in-process material

    and including direct marking when needed.

    F3The organization shall have a process to ensure part's labels are available at the appropriate time

    and are applied correctly.

    F3 The organization shall have a process to clearly identify all storage locations accurately.

    F3The organization shall have a process to assure the appropriate identification of all unusable or

    damaged material (scrap, returns, rejections, etc).

    F1 Bar codes are used to identify and trace material where appropriate.

    Optional comments may be added here supporting the organization's current state.

    5.2 Inventory

    5.2.1 The organization has one integrated system encompassing both perpetual inventory andassociated financial functions (e.g., "one set of books").

    Why? To ensure that inventory transactions and balances are accounted for properly.

    Criteria:

    F1The organization has one integrated system encompassing both perpetual inventory and associated

    financial functions.

    Optional comments may be added here supporting the organization's current state.

    5.2.2 There are systems in place that facilitate access to and management of all types of inventory -finished goods, Works-in-Process (WIP), and raw material.

    Why?To properly support the planning process stock management systems must be in place to ensure

    ready access to material.

    Criteria:

    F2The organization has a process that facilitates management of all types of inventory, in-house and

    off-site.

    M-7 34Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    35/85

    Global MMOG/LE

    Global MMOG/LE

    F1The organization has visual controls in place to support inventory management (designated storage,

    minimum and maximum levels).

    F1The storage environment is appropriately controlled for material on hand, ensuring that all parts

    have sufficient protection.

    F1 The organization has a process to safeguard easily damaged material and high theft material.

    F1Obsolete material is stored in designated areas and is reviewed at defined intervals for potential

    rework, salvage and for claims purposes, and disposed of in a timely manner.

    Optional comments may be added here supporting the organization's current state.

    5.2.3 The organization has a process to optimize the material flow.

    Why?

    The primary objective of a lean manufacturing/material flow process is to efficiently and effectively

    support the needs of the organization. As long as there is a need to move parts from one location to

    another there will be the opportunity to eliminate waste in the material flow process.

    Criteria:

    F2 The organization's material flow is designed to support FIFO where applicable.

    F1The organization has a process to optimize the material flow for new and current parts and

    production processes.

    F1 The organization's material flow is designed to facilitate accurate tracking.

    F1 The organization's material flow is designed to minimize handling and transportation costs.

    Optional comments may be added here supporting the organization's current state.

    5.2.4The organization has a process that ensures that all material records are maintained and

    accurate, and deviations investigated and corrected.

    Why?

    To ensure customer product availability and to minimize stock errors it is necessary to have a stock

    control system. Efficient stock control procedures reduce the risk of obsolescence, stock balance

    errors and the costs of administration and quality problems. A correct stock balance is a prerequisite

    for reliable material supply to production.

    Criteria:

    F2

    There is a process in place to ensure accurate stock balance of all inventory types (e.g., finished

    goods, scrap) and that these stock balance figures are accurately updated in the organization's

    systems in a timely manner.

    M-7 35Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    36/85

    Global MMOG/LE

    Global MMOG/LE

    F2

    The organization has a process that ensures the structure of the Bill of Material (BOM) records are

    maintained and are accurate. Any deviations are investigated and reflected accurately in perpetual

    inventory records.

    F1

    Records are maintained, compared to schedule, and information supplied to all appropriate persons,

    for evaluations of important material processes for the organization.

    F1

    The organization has a process to ensure physical inventory counts, when performed, are done

    accurately and reported in inventory records. These inventory counts are performed with an

    adequate frequency for every part, depending on volume value, waste percentage, etc.

    F1

    The organization has, and periodically evaluates, error reduction tools (e.g., visual controls, bar

    coding, elimination of manual entry), for part storage, part movement and accurate inventory

    records.

    F1The organization shall archive material records for the appropriate length of time (retention

    requirements). These records must be retrievable and readable.

    Optional comments may be added here supporting the organization's current state.

    5.2.5

    The organization has a process in place to coordinate "phased out" inventories (e.g., those

    affected by engineering changes and programs that are being phased out) with both supplier

    and customer.

    Why? To manage risk and avoid obsolescence costs.

    Criteria:

    F2 The organization has a process in place to coordinate accurately "phased out" inventories withsuppliers.

    F2The organization has a process in place to coordinate accurately "phased out" inventories with

    customers.

    F2The scheduling system automatically considers phased out items in order to schedule to the

    customer's final release (e.g., piece vs. standard pack) to avoid over-run.

    Optional comments may be added here supporting the organization's current state.

    5.2.6 The organization has a process to continuously evaluate and optimize inventory buffers.

    Why?

    To ensure both customer satisfaction and cost efficiency, the levels of inventory should be carefully

    considered for every part to ensure that stock levels can be kept at a low level without any risk to

    deliveries to customers.

    Criteria:

    F1 The organization has a process to continually evaluate, and adjust if necessary, inventory buffers.

    M-7 36Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    37/85

    Global MMOG/LE

    Global MMOG/LE

    F1

    The evaluation process considers all factors influencing the need for inventory buffers, (e.g.,

    demand variability, process capabilities, internal transport and warehousing situation, customer

    safety stock requirements, different industrial calendars, etc...).

    Optional comments may be added here supporting the organization's current state.

    5.2.7

    The organization shall have a process to identify and route defective/obsolete material in a

    timely manner. This process shall ensure that defective/obsolete material is segregated and

    disposed of properly (e.g., reworked or scrapped).

    Why? To ensure that any defective/obsolete parts are segregated from production material.

    Criteria:

    F3The organization shall have a process that ensures defective/obsolete material is contained,

    segregated, reworked or disposed of properly.

    F1 Determinations and material movements are made in a timely manner.

    Optional comments may be added here supporting the organization's current state.

    5.3 Engineering Change Control

    5.3.1The organization shall manage engineering revision levels with documented procedures for

    customer, supplier, and internal changes.

    Why?Parts changes can disrupt normal production flow and delivery to the customer if not properly

    managed.

    Criteria:

    F3

    A formal engineering change/sign-off review shall exist to ensure that all changes which affect the

    materials planning and Logistics process are planned, performed and communicated in a

    synchronized manner, (e.g., process sign-off sheet with Bill of Material (BOM) review, routing

    changes, effective dates, notification to suppliers, scheduling, shipping).

    F2There is a formal review process for proposed engineering changes to evaluate the impact on

    manufacturing operations, physical material flow and delivery.

    F1 All affected parties are represented in the review (e.g., Materials, Engineering, Suppliers, Customer)and the results are communicated to all affected parties.

    F1

    All affected personnel understand engineering change procedures internally, and at the supplier and

    customer facilities. These procedures are reviewed on a regular basis for effectiveness and potential

    process improvements.

    F1There is a process for ensuring that inbound material has adequate revision control, including labels

    with revision level if applicable, and all material personnel understand the process.

    M-7 37Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    38/85

    Global MMOG/LE

    Global MMOG/LE

    Optional comments may be added here supporting the organization's current state.

    5.3.2 The organization manages the life cycle of tools to ensure customer requirements at allstages of production.

    Why?In order to support customer orders for service/spare parts, tools must be capable of producing past

    model parts.

    Criteria:

    F2There is a documented, implemented and periodically evaluated process, which tracks a tool's

    lifecycle (e.g., current status, rework history, ownership, authorizations, BOM item link).

    F1 There is a sub-process for evaluating tool disposition when related to past models or inactive parts.

    F1 There is a sub-process, which tracks customer authorizations for reworking or disposing of tools.

    Optional comments may be added here supporting the organization's current state.

    5.3.3

    The organization shall use a process to obtain written customer authorization for deviation

    whenever the product or process is different from that currently approved through Product

    Approval Process (PAP).

    Why?Both parties approve material produced during the initial PAP. Form, f it and function requirements

    can be affected by changes to the product or process changes.

    Criteria:

    F3 There shall be a process in place to obtain documented authorization from the customer wheneverthe product or process deviates from that, which was approved through PAP.

    F1There is a process in place to ensure that all appropriate material personnel are aware of the

    expiration date for the deviation.

    F1Each time a deviation is requested, there is a clear plan to ensure eventual compliance with the

    original or superseding specifications.

    Optional comments may be added here supporting the organization's current state.

    5.4 Traceability

    5.4.1Where regulation and/or the customer requires traceability, a system that supports lot and/or

    serial traceability shall be in place.

    Why?When failures occur, it is vital to be able to contain the issue to protect the customer, establish the

    cause and apply corrective measures in a timely manner.

    Criteria:

    M-7 38Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    39/85

    Global MMOG/LE

    Global MMOG/LE

    F3There shall be a process in place that supports government mandated traceability, including

    reporting to the customer, for all affected parts (e.g., TREAD Act)

    F2There is a process for controlling partial lots, which are identified appropriately and accounted for

    accurately, (e.g., separated from other products).

    F1There is a process in place to support lot and serial traceability for individual part/pallet/batches

    throughout the process.

    F1The lot and serial traceability process supports historical tracking to the level required by regulation

    or the customer.

    Optional comments may be added here supporting the organization's current state.

    M-7 39Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    40/85

    Global MMOG/LE

    Global MMOG/LE

    6. SUPPLIER INTERFACE

    Supplier

    Selection

    Materials Planning &

    Logistics - Agreement/

    Instruction

    Communication

    Packaging & Labeling

    Material Receipt

    Transportation

    Supplier Assessment

    M-7 40Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    41/85

    Global MMOG/LE

    Global MMOG/LE

    6.1 Supplier Selection

    6.1.1Materials Planning and Logistics criteria is considered when selecting suppliers or other

    business partners for new or existing products or services.

    Why?

    A strong supply chain requires well-functioning organizations not only in the first tier, but also in

    every link of the chain. All important aspects, including quality, cost and delivery is necessary for a

    well-functioning supply chain.

    Criteria:

    F2The Global MMOG/LE should be used as part of the selection process of suppliers, sub-contractors,

    logistic providers and the results should be communicated to all involved.

    F2The purchasing decision process includes participation from the Materials Planning and Logistics

    function including the results from this evaluation document.

    Optional comments may be added here supporting the organization's current state.

    6.2 Materials Planning and Logistics Agreement/Instruction

    6.2.1Documented agreement/instruction shall exist with suppliers and sub-contractors/outside

    processors regarding Materials Planning and Logistics.

    Why?To avoid misunderstandings and to make expectations and responsibilities clear among the parties

    involved.

    Criteria:

    F3Procedures shall exist where any deviations from the Materials Planning and Logistics instructions

    are immediately investigated, communicated and rectified by the supplier.

    F2

    A regularly revised document exists for all suppliers, sub-contractors and logistic providers,

    specifying the responsibilities and procedures of the relationship, agreed by all parties before the

    first delivery.

    F2The agreement specifies communication procedures including language and contacts within all

    functions.

    F2The agreement specifies capacity, flexibility demands and delivery conditions, (e.g., unit loads,

    packaging, transportation, transportation costs, batch sizes and documentation).

    Optional comments may be added here supporting the organization's current state.

    6.3 Communication

    6.3.1A method of communication exists between suppliers, sub-contractors and logistic providers

    covering day to day issues and emergency situations.

    Why?For the supply chain to remain uninterrupted at all times, it is important that empowered personnel

    from key areas can be contacted at all times.

    M-7 41Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    42/85

    Global MMOG/LE

    Global MMOG/LE

    Criteria:

    F2A list of contacts, including back-ups, exists covering all logistics functions and availability of

    contacts is guaranteed according to agreement.

    F2

    There is a procedure to ensure that the suppliers, sub-contractors, and logistics providers give

    warning if there is a risk that requirements cannot be fulfilled; all significant changes are

    communicated as soon as they are identified.

    F2Methods of communication, including contingency, have been agreed upon (e.g., phone call, e-mail,

    etc).

    F1 Information on inbound shipment is used to detect material shortages.

    Optional comments may be added here supporting the organization's current state.

    6.3.2 Procedures for data exchange shall be implemented with Suppliers and Logistics providers.

    Why?A fast, reliable, integrated, exact and standardized information flow is necessary to reduce lead

    times both in the physical and the administrative flow.

    Criteria:

    F3The organization shall have the capability to send and receive electronic communication in

    accordance with customer requirements and relevant industry standards.

    F3

    Electronic communication shall be implemented, including sending and receiving capabilities with

    all suppliers, sub-contractors and logistics providers. There is a timeline in place, (in accordance

    with customer requirements), to establish electronic communications with suppliers, sub-contractors

    and logistics providers that are not currently able to send and receive an electronic format.

    F2Electronic communication includes shipment notification messages, which are integrated in the

    receiving system without human intervention.

    F2The quality of information transmitted and received is verified and corrective actions taken if

    necessary.

    F2Transmission frequency and planning horizons are adequate for the commodity produced and

    accounts for the lead times of purchased parts and material.

    Optional comments may be added here supporting the organization's current state.

    6.4 Packaging and Labeling

    6.4.1 There is a documented procedure for packaging development.

    M-7 42Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    43/85

    Global MMOG/LE

    Global MMOG/LE

    Why?Appropriate packaging and unit loads ensure transport handling and cost efficiency, quality, a better

    environment and enables the respect of lead times.

    Criteria:

    F1

    Design and development responsibility is agreed between partners; packaging design requirements

    (e.g., standard packaging, pack size, back-up packaging) are documented in a detailed procedure

    and communicated to the supplier before the start of production and covers the entire product life

    cycle.

    F1Existing standards are used; returnable, reusable or recyclable containers are considered as a part

    of environmental guidelines.

    F1Optimization of transport, variety of packaging, material receiving, and handling until point of use is

    considered.

    Optional comments may be added here supporting the organization's current state.

    6.4.2 Packaging management and control is organized in an efficient way.

    Why?Appropriate packaging management ensures quality, cost efficiency, availability and delivery

    performance.

    Criteria:

    F2

    A documented control system exists for the procurement, allocation and monitoring of all packing

    material (e.g., standard packaging & back-up packaging) and the responsibilities are clearly defined

    between partners.

    F2 There is a documented procedure to control the return of empty packaging in quality and quantity.

    F1Packing material is considered and optimized as a part of the total Materials Planning and Logistics

    costs.

    Optional comments may be added here supporting the organization's current state.

    6.5 Transportation

    6.5.1 Procedures exist regarding management and cost optimization of inbound transportation.

    Why?A transportation policy that focuses on cost-efficiency, timing, lead-time and environmental issues is

    a key factor in ensuring reliable material supply.

    Criteria:

    F2

    Transportation set-up is considered as part of the product development process, including

    transportation specification, (e.g., lead time), optimization and environmental consideration together

    with carriers and Lead Logistics providers.

    M-7 43Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    44/85

    Global MMOG/LE

    Global MMOG/LE

    F2

    Documented procedures for the follow-up of transportation issues relating to quality (damages), cost

    (normal, premium freight and detention/demurrage costs), and delivery (ordering and on-time

    performance) exists.

    F2

    The organization tracks and traces in-bound material from time of supplier shipment through to

    receipt of material.

    F1Transportation function supplies the scheduling function with information on in-bound transportation

    modes and associated transit times (e.g., lead-time, window times).

    Optional comments may be added here supporting the organization's current state.

    6.6 Material Receipt

    6.6.1 Sufficient capacity and appropriate equipment in the material receiving function is ensuredand optimized.

    Why? Without sufficient capacity and/or the right equipment, material receipt could become a bottleneck.

    Criteria:

    F2A planning function exists to allocate resources to ensure adequate capacity (personnel, equipment,

    maintenance and layout/space).

    F1All variables that affect the receiving activit ies are considered to balance the utilization of the docks

    and space (e.g., scheduling, fixed time slots).

    Optional comments may be added here supporting the organization's current state.

    6.6.2A process exists to verify labeling and documentation against Materials Planning and

    Logistics requirements for procured parts.

    Why?Reliable material supply requires assurance that the parts and associated documentation delivered

    meet the specified Materials Planning and Logistics requirements.

    Criteria:

    F2The organization ensures shipping labels are accurate and comply with AIAG/Odette labeling

    standards.

    F1The organization compares shipping documents with actual goods received to ensure accuracy and

    compliance to organization's requirements/standards.

    F1

    A procedure exists for the correction and follow-up of any discrepancies in the receipt of material

    (e.g., quality and quantity verification [including packaging]). The organization ensures that each

    receiving transaction has a unique identifier to support problem resolution.

    F1 When material is received by authorized third parties, all of the above criteria apply.

    M-7 44Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    45/85

    Global MMOG/LE

    Global MMOG/LE

    F1 The organization uses visual controls to assist the receiving process.

    Optional comments may be added here supporting the organization's current state.

    6.7 Supplier Assessment

    6.7.1Partners (suppliers, sub-contractors and logistics service providers) in the supply chain are

    assessed regularly according to a defined procedure.

    Why?

    A strong supply chain requires well-functioning organizations not only in the first tier, but also in

    every link of the chain. Follow-up of performance allows parties to focus on areas of importance to

    achieve the Materials Planning and Logistics strategy and customer satisfaction.

    Criteria:

    F2The Global MMOG/LE is used for evaluating all suppliers, sub-contractors, logistic providers on a

    regular basis and communicated to all involved functions.

    F2

    The organization has a process to review supplier performance levels on a regular basis.

    Summarized information about the suppliers' performance is provided to the purchasing function

    and the supplier on a regular basis, according to industry standards where they exist.

    Optional comments may be added here supporting the organization's current state.

    M-7 45Issue: v1, Release 2 Dated: 12/04

    Replaces: Dated:

  • 7/28/2019 MMOG Logistics English

    46/85

    Global MMOG/LE

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    1 1.1.1 F2 F2 F2 F2 0 8

    1.2.1 F2 F2 F2 0 6

    1.2.2 F3 F3 F3 F2 F2 F2 F1 0 16

    1.3.1 F2 F2 F2 F1 0 7

    1.3.2 F2 F2 0 4

    1.4.1 F1 F1 F1 0 3

    1.4.2 F3 F2 F2 F2 F1 0 10

    1.5.1 F1 F1 F1 0 3

    1.5.2 F2 F2 F2 0 6

    Chapter summary Total Chapter 1 0

    MAX Score 63

    % 0%

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    2 2.1.1 F1 F1 F1 F1 0 4

    2.2.1 F2 F2 F1 F1 0 62.3.1 F2 F2 F1 0 5

    2.3.2 F3 F3 F2 0 8

    2.3.3 F1 0 1

    2.4.1 F2 F1 0 3

    2.4.2 F1 F1 0 2

    2.4.3 F1 F1 F1 F1 0 4

    2.4.4 F2 F1 F1 F1 0 5

    2.4.5 F1 F1 F1 0 3

    Chapter summary Total Chapter 2 0

    MAX Score 41

    % 0%

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    3 3.1.1 F3 0 3

    3.2.1 F3 F3 F3 F1 0 10

    3.2.2 F1 F1 F1 0 3

    3.2.3 F1 F1 0 2

    3.2.4 F2 F1 F1 0 4

    3.3.1 F3 F3 F1 F1 F1 0 9

    3.3.2 F1 F1 F1 0 3

    3.4.1 F3 0 3

    3.4.2 F2 0 2

    Chapter summary Total Chapter 3 0

    MAX Score 39

    % 0%

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    4 4.1.1 F2 F2 F1 F1 F1 0 7

    4.1.2 F3 F3 F1 0 7

    4.1.3 F3 F3 F3 0 9

    4.2.1 F3 F2 F2 F1 F1 0 9

    4.2.2 F2 F2 F2 F2 F1 0 9

    4.3.1 F2 F2 F2 0 6

    4.3.2 F3 F3 F3 F3 0 12

    4.3.3 F2 F2 F1 F1 0 6

    4.4.1 F3 F2 F1 F1 F1 0 8

    4.4.2 F1 F1 0 2

    4.5.1 F2 F1 F1 0 4

    Chapter summary Total Chapter 4 0

    MAX Score 79

    % 0%

    Global MMOG/LE

    Global Materials Management Operations Guide / Logistics Evaluation results sheet

    ChapterQuestion

    number

    Result (Criteria score x Weighting of criteria)Act.

    Score

    Max.

    Score

    S=self

    assessed

    V=verified

    assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 4 21 9

    ChapterQuestion

    number

    Result (Criteria score x Weighting of criteria) Act.

    Score

    Max.

    Score

    S=self

    assessed

    V=verified

    assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 2 7 21

    ChapterQuestion

    number

    Result (Criteria score x Weighting of criteria) Act.

    Score

    Max.

    Score

    S=self

    assessed

    V=verified

    assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 7 2 14

    ChapterQuestion

    number

    Result (Criteria score x Weighting of criteria) Act.

    Score

    Max.

    Score

    S=self

    assessed

    V=verified

    assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 11 15 16

    Cha terQuestion Result (Criteria score x Weighting of criteria) Act. Max. S=self V=verified

    M-7Issue:v1, Release 2 Dated 12/04

    Replaces:, Dated

  • 7/28/2019 MMOG Logistics English

    47/85

    Global MMOG/LE

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    5 5.1.1 F3 F3 F3 F3 F1 0 13

    5.2.1 F1 0 1

    5.2.2 F2 F1 F1 F1 F1 0 6

    5.2.3 F2 F1 F1 F1 0 5

    5.2.4 F2 F2 F1 F1 F1 F1 0 8

    5.2.5 F2 F2 F2 0 6

    5.2.6 F1 F1 0 2

    5.2.7 F3 F1 0 4

    5.3.1 F3 F2 F1 F1 F1 0 8

    5.3.2 F2 F1 F1 0 4

    5.3.3 F3 F1 F1 0 5

    5.4.1 F3 F2 F1 F1 0 7

    Chapter summary Total Chapter 5 0

    MAX Score 69

    % 0%

    1 Weight. 2 Weight. 3 Weight. 4 Weight. 5 Weight. 6 Weight. 7 Weight.

    6 6.1.1 F2 F2 0 4

    6.2.1 F3 F2 F2 F2 0 9

    6.3.1 F2 F2 F2 F1 0 7

    6.3.2 F3 F3 F2 F2 F2 0 12

    6.4.1 F1 F1 F1 0 3

    6.4.2 F2 F2 F1 0 56.5.1 F2 F2 F2 F1 0 7

    6.6.1 F2 F1 0 3

    6.6.2 F2 F1 F1 F1 F1 0 6

    6.7.1 F2 F2 0 4

    Chapter summary Total Chapter 6 0

    MAX Score 60

    % 0%

    TOTAL score 0

    Maximum Score 351 0

    % 0% 206

    206

    Company name: ______________________________________________

    Plant/Location : _______________________________________________

    Name of self-assessor: __________________ Name of verified-assessor: __________________

    Date: _ Date: ___

    Signature : _________________________ Signature : _________________________

    Scoring : = Criteria fulfilled

    = Criteria not fulfilled

    Weighting : F1 = 1 (If requirements are not met, the organizations competitiveness will be adversely affected)(If requirements are not met, customer satisfaction and the

    organizations performance will be seriously affected)

    (If requirements are not met, there is a high risk of interruption to customer operationswith additional costs to be incurred in the short term)

    number Score Score assessed assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 8 10 25

    ChapterQuestion

    number

    Result (Criteria score x Weighting of criteria) Act.

    Score

    Max.

    Score

    S=self

    assessed

    V=verified

    assessed

    F3 F2 F1

    Fulfilled 0 0 0

    Not fulfilled 3 20 11

    SUMMARY

    F3 F2 F1 A, B or CFulfilled 0 0 0

    96

    X

    Not fulfilled 35 75 96

    C

    F3 = 3

    blank

    F2 = 2

    35 75

    M-7Issue:v1, Release 2 Dated 12/04

    Replaces:, Dated

  • 7/28/2019 MMOG Logistics English

    48/85

    GlobalMMOG/LE

    Global

    MM

    OG/LE

    Question#

    Criteria

    Weight

    Element

    DesiredState

    CurrentState

    Gap

    ActionRequired

    Timeto

    Complete

    Responsibility

    Cost

    1)

    F2

    1.1

    Visionand

    Strategy

    Ado

    cumentedvisionexistsfor

    theMaterialsPlanningand

    Logisticsfunction.

    2)

    F2

    1.1

    Visionand

    Strategy

    Ado

    cumentedstrategyexists

    with

    activitiesforimplementing

    theMaterialsPlanningand

    Logisticsvision.

    3)

    F2

    1.1

    Visionand

    Strategy

    The

    MaterialsPlanningand

    Logisticsvisionandstrategyis

    linke

    dtotheorganization's

    over

    allobjectives,

    including

    customerrequirementsand

    cont

    inuousimprovement.

    4)

    F2

    1.1

    Visionand

    Strategy

    The

    MaterialsPlanningand

    Logisticsvisionandstrategyis

    com

    municatedandunderstood

    withintheorganization.

    1)

    F2

    1.2

    Objectives

    Allo

    bjectivesaremeasurable

    and

    consistentwiththe

    orga

    nization'sMaterials

    Plan

    ningandLogistics

    strat

    egy.

    2)

    F2

    1.2

    Objectives

    Obje

    ctivesareacceptedbyall

    relevantfunctionsandare

    clearlycascadedthroughout

    theorganization.

    3)

    F2

    1.2

    Objectives

    Obje

    ctivesarereviewedwith

    seniormanagementatplanned

    inter

    vals.

    1)

    F3

    1.2

    Objectives

    Deliveryperformanceto

    customer.

    2)

    F3

    1.2

    Objectives

    Supplierdeliveryperformance.

    3)

    F3

    1.2

    Objectives

    Build-to-Schedule(productivity:

    plan

    vs.actual).

    4)

    F2

    1.2

    Objectives

    Leadtimesforallsupplychain

    proc

    esses(physicaland

    infor

    mation).

    5)

    F2

    1.2

    Objectives

    MaterialsPlanningand

    LogisticsQuality(e.g.,

    docu

    mentation,messages,

    pack

    agingandlabeling).

    6)

    F2

    1.2

    Objectives

    MaterialsPlanningand

    Logisticscosts(e.g.,

    Premium

    freig

    ht,packaging,

    handling

    and

    storagespace).

    M-7

    Iss

    ue:v1,

    Release2,

    Dated12/04

    Replaces:Dated

  • 7/28/2019 MMOG Logistics English

    49/85

    GlobalMMOG/LE

    Global

    MM

    OG/LE

    Question#

    Criteria

    Weight

    Element

    DesiredState

    CurrentState

    Gap

    ActionRequired

    Timeto

    Complete

    Responsibility

    Cost

    7)

    F1

    1.2

    Objectives

    Stoc

    klevels/stockturnbroken

    downintorawmaterial,WIP,

    finishedgoods.

    1)

    F2

    1.3

    Measurement,

    Analysisand

    ActionPlans

    Performanceagainstobjectives

    ismonitoredatplanned

    inter

    valsandreviewedwith

    seniormanagement.

    2)

    F2

    1.3

    Measurement,

    Analysisand

    ActionPlans

    Allrelevantpersonnel/functions

    areinformedabout

    performanceatplanned

    inter

    vals.

    3)

    F2

    1.3

    Measurement,

    Analysisand

    ActionPlans

    Astructuredproblemsolving

    methodisusedtodetermine

    root

    cause(s)andprevent

    recu

    rrenceofmaterial

    prob

    lems.

    4)

    F1

    1.3

    Measurement,

    Analysisand

    ActionPlans

    Grap

    hicalanalysistools,

    (e.g.,

    Pare

    tographs)displaying

    histo

    ricalandtrenddataare

    used

    totrackcriticalareasover

    time

    .

    1)

    F2

    1.3

    Measurement,

    Analysisand

    ActionPlans

    The

    managementprioritizes

    docu

    mentedactionplanitems.

    The

    actionplanshouldinclude

    theaction,responsibility,

    timing

    and

    allocatedresource.

    2)

    F2

    1.3

    Measurement,

    Analysisand

    ActionPlans

    Evaluationsof

    corrective/preventiveactions

    areperformedatthe

    conc

    lusionofeachactionplan.

    The

    reviewshallbeusedto

    dete

    rminetheeffectiveness,

    theapplicationtosimilar

    proc

    essesandtheneedforany

    furth

    eraction.

    1)

    F1

    1.4

    Continuous

    Improvement

    Ade

    finedprocesssupported

    bym

    anagementforcontinuous

    impr

    ovementisusedwithinthe

    entir

    eorganizationandwithall

    supp

    lychainpartners.

    2)

    F1

    1.4

    Continuous

    Improvement

    Emp

    loyeeshaveadocumented

    resp

    onsibilityforandare

    allow

    edtimetoworkon

    cont

    inuousimprovementtasks.

    M-7

    Iss

    ue:v1,

    Release2,

    Dated12/04

    Replaces:Dated

  • 7/28/2019 MMOG Logistics English

    50/85

    GlobalMMOG/LE

    Global

    MM

    OG/LE

    Question#

    Criteria

    Weight

    Element

    DesiredState

    CurrentState

    Gap

    ActionRequired

    Timeto

    Complete

    Responsibility

    Cost

    3)

    F1

    1.4

    Continuous

    Improvement

    The

    organizationencourages

    emp

    loyeeinvolvementthrough

    ana

    ctivesuggestionprogram.

    1)

    F3

    1.4

    Continuous

    Improvement

    Bottleneckprocesses.

    2)

    F2

    1.4

    Continuous

    Improvement

    Prod

    uctionbatch/lotsizes.

    3)

    F2

    1.4

    Continuous

    Improvement

    Set-up/Change-overtimes.

    4)

    F2

    1.4

    Continuous

    Improvement

    Thro

    ughputtime.

    5)

    F1

    1.4

    Continuous

    Improvement

    Reductionofcompletephysical

    inventories.

    1)

    F1

    1.5

    SupplyChain

    Development

    Astructuredapproachisinuse

    ford

    evelopmentofall

    relationships.

    2)

    F1

    1.5

    SupplyChain

    Development

    Actionplans,processesand

    relationshipsofthepartiesin

    thesupplychainare

    docu

    mented.

    3)

    F1

    1.5

    SupplyChain

    Development

    Methodsofanalysisareused

    toassessthesupplychain:

    {e.g.

    SWOTanalysis

    (Stre

    ngths,

    Weaknesses,

    Opportunities,

    Threats),

    Benchmarking,

    Business

    Netw

    orks}

    1)

    F2

    1.5

    SupplyChain

    Development

    Clea

    runderstandingofinternal

    customerrequirements.

    2)

    F2

    1.5

    SupplyChain

    Development

    Internalcustomersatisfactionis

    mea

    sured(e.g.,pressshop

    partssuppliedtotheassembly

    area

    ).

    3)

    F2

    1.5

    SupplyChain

    Development

    Mea

    surementsarefully

    implemented,usedand

    com

    municatedtorelevant

    func

    tions.

    1)

    F1

    2.1

    Organizational

    Processes

    Thereisadocumented

    orga

    nizationalstructurein

    placetoensureappropriate

    focu

    s(e.g.,

    directreportingto

    theseniormanagement)and

    reso

    urcesforallMaterials

    Plan

    ningandLogistics

    proc

    esses.

    M-7

    Iss

    ue:v1,

    Release2,

    Dated12/04

    Replaces:Dated

  • 7/28/2019 MMOG Logistics English

    51/85

    GlobalMMOG/LE

    Global

    MM

    OG/LE

    Question#

    Criteria

    Weight

    Element

    DesiredState

    CurrentState

    Gap

    ActionRequired

    Timeto

    Complete

    Responsibility

    Cost

    2)

    F1

    2.1

    Organizational

    Processes

    Documentationexists(e.g.,

    flow

    charts)describingthe

    infor

    mationflowofallMaterials

    Plan

    ningandLogistics

    proc

    esses,

    includinginterfaces

    with

    otherfunctionsand

    businesspartners.

    3)

    F1

    2.1

    Organizational

    Processes

    Documentationexists(e.g.,

    flow

    charts)describingthe

    phys

    icalflowaspectofall

    MaterialsPlanningand

    Logisticsprocesses,

    including

    inter

    faceswithotherfunctions

    and

    businesspartners.

    4)

    F1

    2.1

    Organizational

    Processes

    Thereisanactivedocument

    cont

    rolprocedureinplace.

    (as

    defin

    edwithinTS

    16949/QS9000)

    1)

    F2

    2.2

    Organizational

    Procedures

    The

    organizationhas

    proc

    edures,whichare

    evaluatedandimplementedto

    ensu

    recompliancewiththe

    MaterialsPlanningand

    Logisticsvision.

    2)

    F2

    2.2

    Organizational

    Procedures

    Documentedproceduresforall

    customerinterfaceaspectsof

    theMaterialsPlanningand

    Logisticsprocessexist(e.g.,

    customerorderplanning,stock

    cont

    rol,packagingprocedures

    and

    transportmanagement).

    3)

    F1

    2.2

    Organizational

    Procedures

    Documentedproceduresforall

    inter

    nalaspectsofthe

    MaterialsPlanningand

    Logisticsprocessexist(e.g.,

    asse

    mblyandproduction

    plan

    ning,materialhandling,

    stockcontrolandwarehousing

    inclu

    dingMROinventory).

    4)

    F1

    2.2

    Organizational

    Procedures

    Documentedproceduresforall

    supp

    lierinterfaceaspectsof

    theMaterialsPlanningand

    Logisticsprocessexist(e.g.,

    supp

    lierperformance

    asse

    ssment,receiptof

    material,stockcontroland

    requ

    irementcalculations).

    M-7

    Iss

    ue:v1,

    Release2,

    Dated12/04

    Replaces:Dated

  • 7/28/2019 MMOG Logistics English

    52/85

    GlobalMMOG/LE

    Global

    MM

    OG/LE

    Question#

    Criteria

    Weight

    Element

    DesiredState

    CurrentState

    Gap

    ActionRequired

    Timeto

    Complete

    Responsibility

    Cost

    1)

    F2

    2.3

    Resource

    Planning

    The

    organizationhastheability

    toadaptitshumanresourcesin

    orde

    rtomanageandbalance

    work

    load(e.g.,

    flexibility

    agre

    ements,peakhours,

    abse

    nteeismanddifferent

    indu

    strialcalendars).

    2)

    F2

    2.3

    Resource

    Planning

    The

    organizationconducts

    periodicreviewstoensure

    sufficientresources(e.g.,

    spac

    eandequipment)are

    alloc

    atedforallMaterials

    Plan

    ningandLogistics

    proc

    esses.

    3)

    F1

    2.3

    Resource

    Planning

    Overtimeisnotusedasalong-

    term

    solutionforstaffing

    requ

    irements.

    1)

    F3

    2.3

    Resource

    Planning

    The

    organization'scontingency

    plan

    sshallbeimplementedby

    apre-determinedfunction

    whenanemergencyoccurs

    and

    thesystemshallbetested

    and

    validatedperiodically.

    2)

    F3

    2.3

    Resource

    Planning

    Pers

    onnelshallbetrainedin

    cont

    ingencyprocedures.

    3)

    F2

    2.3

    Resource

    Planning

    Documentedandproven

    proc

    eduresforallpotential

    disru

    ptionsareidentifiedwith

    appropriateactionand

    reco

    veryplans,

    including

    prod

    uctionanddatarecovery

    (e.g.,computer/communication

    failures,

    industrialdisputes,

    transportandproduction

    disru

    ption).

    1)

    F1

    2.3

    Resource

    Planning

    Thereareproceduresinplace

    tohighlightandcommunicate

    incid

    entsordeviations,

    (e.g.,

    sche

    duleinformation,early

    warn

    ingofdelaysand

    stoppages),fromthe

    prod

    uctionplan,

    (e.g.,regular

    mee

    tings,reportingandad-hoc

    mee