Mm Presentation

43
SAP MATERIAL MANAGEMENT. PURCHASE. STORES. MATERIAL MASTER. GATE ENTRY. VENDOR MASTER. MIGO. INFO RECORD. MATERIAL ISSUE (COST CENTER). SCOURCE LIST. CREATION OF 57(F)4 CHALLAN. SCHEDULE AGREEMENT. RECONCILATION WITH SUB-CONT. SCHEDULE LINE. PURCHASE RETURN. PURCHASE ORDERS. PHYSICAL INVENTORY. STOCK ANALYSIS /

Transcript of Mm Presentation

Page 1: Mm Presentation

SAP

MATERIAL MANAGEMENT.

PURCHASE. STORES.

MATERIAL MASTER. GATE ENTRY.

VENDOR MASTER. MIGO.

INFO RECORD. MATERIAL ISSUE (COST CENTER).

SCOURCE LIST. CREATION OF 57(F)4 CHALLAN.

SCHEDULE AGREEMENT. RECONCILATION WITH SUB-CONT.

SCHEDULE LINE. PURCHASE RETURN.

PURCHASE ORDERS. PHYSICAL INVENTORY.

STOCK ANALYSIS / CONSUMPTION PATTERNS.

Page 2: Mm Presentation

Flow Chart of Purchase w.r.t. SAP

Page 3: Mm Presentation

SAP - MATERIAL MANAGEMENT.MATERIAL MASTER. (MM01)

Table Of Contents.

•Material Number.

•Material Description.

•Unit Of Measure.

•Purchase Group.

•Material type.

•MRP type.

•Procurement type

•Material Group

•Lot size.

•Storage Location.

•Planned Delivery Days

•Safety Stock.

Page 4: Mm Presentation

Feed matl. No. Ind. Sec.always mech. Engg. In all case.

Select Matl. Type as per matl Cetagary.then click on Orgn. Levels.

Create Material Master MM01

Page 5: Mm Presentation

Select these viewsThen click on

Create Material Master MM01

This viw related to account

Page 6: Mm Presentation

Now click here

Create Material Master MM01

Page 7: Mm Presentation

Select these field as per Matls.

Create Material Master MM01

Page 8: Mm Presentation

Create Material Master MM01

Select these field as per Matls.

Page 9: Mm Presentation

Only these coloum

Should be fill by purchase

Then enter.

Create Material Master MM01

Select 30 in case of Subcontracting Item code

Page 10: Mm Presentation

All field fill by account.

Create Material Master MM01

Page 11: Mm Presentation

Click here yes

Create Material Master MM01

Page 12: Mm Presentation

SAP - MATERIAL MANAGEMENT.VENDOR MASTER. (XK01 / MK01).

Table Of Contents.

•Vendor Code.

•Vendor Name.

•Vendor Details.

•Account Group.

•Bank Details.

•Payment Terms.

•Currency.

•Tax Information.

•Partner function.

Page 13: Mm Presentation

Select always 1193 for Pur. Org. &KERD for Account group.

Create Vendor Master MK01

Page 14: Mm Presentation

Create Vendor Master MK01

Fill all address related Information in this sheet.

Page 15: Mm Presentation

Only VAT Reg. NoFill by purchase.OthersBy Account.

Create Vendor Master MK01

Page 16: Mm Presentation

Create Vendor Master MK01

This screen fill by Account.

Page 17: Mm Presentation

Create Vendor Master MK01

Select these coloum as per requirment

Page 18: Mm Presentation

Create Vendor Master MK01

This data will come automaticly

Now click on save

Page 19: Mm Presentation

Click here for save data

Create Vendor Master MK01

Page 20: Mm Presentation

SAP - MATERIAL MANAGEMENT.INFO RECORD (ME11 / ME12 / ME13).

Table Of Contents.

•Vendor Code.

•Vendor Name.

•Material Number / Material Description.

•Info Category (Standard / Sub-Contractor).

•Planned Delivery Time.

•Standard qty / Minimum qty.

• Net Price.

•Quantity Conversion.

•Quantity Tolerance.

•GR base / Invoice.

•Condition.

Page 21: Mm Presentation

Fill here item related data.And select Info categoryStandard in case of components And other Subcontracting in case of Job work.

Create Info Records ME11

Page 22: Mm Presentation

Info Record

There is no need to fill any field in this sheet.

Page 23: Mm Presentation

Info Record

Select these point as per requirment

Page 24: Mm Presentation

Info Record

No need to fill any any field

Page 25: Mm Presentation

Info Record

If we want to print any remark then write here

Now click on save

Page 26: Mm Presentation

Select yes

Info Record

Page 27: Mm Presentation

SAP - MATERIAL MANAGEMENT.SOURCE LIST (ME01 / ME03 /ME04).

Table Of Contents.

• Vendor Code.

• Vendor Name.

• Material Number

• Material Description.

• Validity Period From and To.

• Purchasing Organisation.

• Plant

Page 28: Mm Presentation

Source List ME01

Fill here Item code and plant code then enter

Page 29: Mm Presentation

Source List

Save it

Page 30: Mm Presentation

Schedule Agreement ME31L

Page 31: Mm Presentation

Schedule Agreement ME31L

Fill all required field

Page 32: Mm Presentation

Click here Genrated no.is 5500000014

Schedule Agreement ME31L

Page 33: Mm Presentation

SAP - MATERIAL MANAGEMENT.SCHEDULE LINES (ME38/ ME39).

Table Of Contents.

• Schedule Agreement Number.

•Material Number

• Material Description.

• Delivery Date.

• Start Date.

• Schedule Quantity.

Page 34: Mm Presentation

Schedule Line ME38

Page 35: Mm Presentation

Schedule Line ME38

Page 36: Mm Presentation

Schedule Line ME38

Select item no.then click del sch

Page 37: Mm Presentation

Fill Del. Date & Sch. Qty.Then save

Schedule Line ME38

Page 38: Mm Presentation

SAP - MATERIAL MANAGEMENT. SCHEDULE LINES RELEASE (ME84).

Table Of Contents.

• Schudel Agreement Number.

• Plant

• Vendor Code.

Page 39: Mm Presentation

SAP - MATERIAL MANAGEMENT.PURCAHSE ORDER (ME21N / ME22N / ME23N).

Table Of Contents.

• Vendor Code. Excise Duty / Tax Details.

P.O Type \ Date. Valid Upto.

• Material Number Cost Center.

• Material Description. Net Price.

• Purchasing Organisation. Delivery Date.

• Quantity.

• Unit Of Measure.

• Purchasing Group.

• Plant / Store Location.

• Payment Terms.

• Incoterms.

Page 40: Mm Presentation

Purchase Order Creation

Page 41: Mm Presentation

Purchase Order Creation

It is Po No.

Page 42: Mm Presentation

Material Requirement Planning(MRP) MD06

Page 43: Mm Presentation

Exception Messages in MRP listYou need to check the red light materials one by one for shortage.