9
Data Material 1 20 mm 2 Agregat Kasar / Batu Pecah 5mm - 20mm a Berat Jenis SSD = 2.65 (hasil Lab) b Berat isi (Unit Weight)= 1.7 Kg/liter (hasil Lab) c Penyerapan Air (%) = 2 (%) (hasil Lab) d Gradasi = (hasil Lab) e Modulus Kehalusan = 6.63 (hasil Lab) f Kadar Air dalam split = 1.5 (%) (hasil Lab) 3 Agregat Halus (Pasir) a Berat Jenis SSD = 2.6 (hasil Lab) b Berat isi (Unit Weight)= 1.55 Kg/liter (hasil Lab) c Penyerapan Air (%) = 3 (%) (hasil Lab) d Gradasi = (hasil Lab) e Modulus Kehalusan = 3 (hasil Lab) f Kadar Air dalam split = 5.2 (%) (hasil Lab) 4 Semen a Type = 1 b Berat Jenis = 5 Mutu Beton a Umur = 28 hari b ζbk = 325 Kg/cm2 6 Standar Deviasi S = 50 Kg/cm2 45<S<55, Vol 35<S<45, Vol 25<S<35, Vol 7 Slump = 6 - 10 cm Pengerasan J Pembetonan M Tabel PBI 1971 : Nila 8 Benda Uji a Silinder = 15x30 cm Benda Kubus 15x15x Ukuran Maximum Agregat / Batu Pecah Nilai Slum Pekerj Dinding, Pla Pondasi, Pon Tapak Berula Pondasi Tapa Berulang, Ka Konst. Bawah Plat , Balok Dinding

Transcript of Mix Design (Standard Aci)

Page 1: Mix Design (Standard Aci)

Data Material

120 mm

2 Agregat Kasar / Batu Pecah 5mm - 20mma Berat Jenis SSD = 2.65 (hasil Lab)b Berat isi (Unit Weight) = 1.7 Kg/liter (hasil Lab)c Penyerapan Air (%) = 2 (%) (hasil Lab)d Gradasi = (hasil Lab)e Modulus Kehalusan = 6.63 (hasil Lab)f Kadar Air dalam split = 1.5 (%) (hasil Lab)

3 Agregat Halus (Pasir)a Berat Jenis SSD = 2.6 (hasil Lab)b Berat isi (Unit Weight) = 1.55 Kg/liter (hasil Lab)c Penyerapan Air (%) = 3 (%) (hasil Lab)d Gradasi = (hasil Lab)e Modulus Kehalusan = 3 (hasil Lab)f Kadar Air dalam split = 5.2 (%) (hasil Lab)

4 Semena Type = 1b Berat Jenis =

5 Mutu Betona Umur = 28 harib ζbk = 325 Kg/cm2

6 Standar DeviasiS = 50 Kg/cm2 45<S<55, Volume pekerjaan beton <1000m2

35<S<45, Volume pekerjaan beton 1000-300025<S<35, Volume pekerjaan beton >3000m2

7 Slump = 6 - 10 cm

Plat , Balok, DindingPengerasan JalanPembetonan MasalTabel PBI 1971 : Nilai Slump

8 Benda Uji

a Silinder = 15x30 cmBenda Uji

Kubus 15x15x15cm

Ukuran Maximum Agregat / Batu Pecah

Nilai Slump untuk Pekerjaan

Dinding, Plat Pondasi, Pondasi Tapak Berulang

Pondasi Tapak Tak Berulang, Kaison, & Konst. Bawah Tanah

Page 2: Mix Design (Standard Aci)

Kubus 20x20x20cmSilinder 15x30cm

Calculation

1 Mengitung Kadar Air (W)

Tabel "Properties of Concrete" by AM Neville.

10 225 3 20012.5 215 2.5 190

20 200 2 18025 195 2.5 17540 175 1 16050 170 0.5 15570 160 0.3 150

150 140 0.2 135

Slump = 6 - 10 cmMax agregate = 20 mm

W = 200.00 Kg/m3

2 Menentukan harga W/C dari tabel

Tabel Hubungan W/C dan Kekuatan Tekan Hancur beton (ACI Standard 211.3-75)

Water / Cement ratio

48 486.72 0.3341 415.74 0.41 0.3234 344.76 0.48 0.428 283.92 0.57 0.4821 212.94 0.68 0.5914 141.96 0.82 0.74

Mutu Beton (ζbk) = 325 Kg/cm2Stanar Deviasi (S) = 50 Kg/cm2

Benda Uji = Silinder, 15x30 cmζbm yang akan dicapai = ζbk + 1.64 S

407 kg/cm2Diubah kedalam kekuatan 34

Silinder, 15x30 = 337.81 kg/cm2

= 0.49 interpolasi

Ukuran Maximum Agregat

Jumlah Air yang diperlukan (tidak ada udara dalam beton)

kg/m3

% udara dalam beton

Jumlah Air yang diperlukan (ada udara dalam beton) kg/m3

Kekuatan tekan pada umur 28 hari

Satuan Mpa

Satuan Kg/cm2

Untuk beton yang tak ada udara didalamnya

Untuk beton yang ada udara didalamnya

Adukan beton tanpa udara, didapat W/C

Page 3: Mix Design (Standard Aci)

3 Menentukan jumlah semen dalam 1m3 adukan

W/C = 0.49C = 408.16 Kg

4 Menentukan volume total aggregat kasar untuk 1 satuan volume beton

Tabel "Properties of Concrete" by AM Neville. (Tabel 10.17)

2.4 2.6 2.8 310 0.5 0.48 0.46 0.44

12.5 0.59 0.57 0.55 0.5320 0.66 0.64 0.62 0.625 0.71 0.69 0.67 0.6540 0.75 0.73 0.71 0.6950 0.78 0.76 0.74 0.7270 0.82 0.8 0.78 0.76

150 0.87 0.85 0.83 0.81

Modulus kehalusan pasir = 3Max agregate = 20 mmBerat isi (Unit Weight) = 1.7 Kg/literJadi berat agregat kasar = 34000

Uk max aggregat kasar (mm)

Vol. Total agregat kasar per satuan volume beton utk harga fineness modulus pasir

Page 4: Mix Design (Standard Aci)

45<S<55, Volume pekerjaan beton <1000m235<S<45, Volume pekerjaan beton 1000-300025<S<35, Volume pekerjaan beton >3000m2

Slump (cm)

Max Min

12.50 5.00

9.00 2.50

15.00 7.50 7.50 5.00 7.50 2.50

1.00

Perbandingan Kekuatan Tekan

Page 5: Mix Design (Standard Aci)

0.95 0.83

Page 6: Mix Design (Standard Aci)

FOOTING SCHEDULE

MARKSIZE Banyaknya QTY Semen Air (W) Pasir (S) Split (G)

(widthxdepth- mm) Buah m3 Kg Ltr Kg Kg

F1 400 x 400

F2 300 x 300

P1 900 x 900 x 400 Dmin 7 2.268 842.228 453.60 1,754.76 2,313.36

P2 900 x 600 x 400 Dmin 2 0.432 160.424 86.40 334.24 440.64

P3 600 x 600 x 400 Dmin 15 2.160 802.122 432.00 1,671.20 2,203.20

P4 600 x 400 x 400 Dmin 8 0.768 285.199 153.60 594.20 783.36

P5 900 x 900 x 400 Dmin 2 0.648 240.637 129.60 501.36 660.96

P6 900 x 900 x 400 Dmin 7 2.268 842.228 453.60 1,754.76 2,313.36 Total 8.544 3,172.838 1,708.800 6,610.509 8,714.880

FOOTING SCHEDULE revisi

MARKSIZE Banyaknya QTY Semen Air (W) Pasir (S) Split (G)

(widthxdepth- mm) Buah m3 Kg Ltr Kg Kg

F1 400 x 400

F2 300 x 300

P1 900 x 900 x 400 Dmin 7 2.268 842.228 453.60 1,754.76 2,313.36

P2 900 x 600 x 400 Dmin - - - - -

P3 600 x 600 x 400 Dmin 15 2.160 802.122 432.00 1,671.20 2,203.20

P4 600 x 400 x 400 Dmin 3 0.288 106.950 57.60 222.83 293.76

P5 900 x 900 x 400 Dmin - - - - -

P6 900 x 900 x 400 Dmin 7 2.268 842.228 453.60 1,754.76 2,313.36 Total 6.984 2,593.528 1,396.800 5,403.534 7,123.680

Page 7: Mix Design (Standard Aci)

MIX DESIGN CONCRETE 30 Mpa

MUTU BETON 300 Kg/M2 30 MPAUKURAN AGGREGAT 20 MMBerat jenis semen 3.16Berat jenis split 2.65Berat jenis pasir 2.6

1 MENENTUKAN HARGA W/C

TABEL ACI (SILINDER 15X30)

WATER/CEMENT RATIOSATUAN SATUAN

MPA KG/CM2

48 487 0.33 - 41 415.9 0.41 0.32 34 344.9 0.48 0.40 28 284.1 0.57 0.48 21 213 0.68 0.59 18 142 0.82 0.74

1 MPA = 10.145 KG/CM2STANDAR DEVIASI 50 KG/CM2ζbm yg akan dicapai = ζbk + 1.64 x S

382 KG/CM2diubah dlm kekuatan silinder (0.83)

317.06dari tabel W/C 0.5386

2 Menentukan jumlah semen dalam 1 m3 adukanW/C = 0.5386

tabel properties of concrete by AM Nevile

mm kg/m3 kg/m3 kg/m310 225 3 200

12.5 215 2.5 19020 200 2 18025 195 2.5 17540 175 1 16050 170 0.5 15570 160 0.3 150

150 140 0.2 135

W = 200W/C = 0.5386C = 371.35 Kg

KEKUATAN TEKAN PADA UMUR 28 HARI

UKURAN BETON YANG TAK ADA UDARA

UKURAN BETON YANG ADA UDARA

Uk. Max aggregat

Jumlah air yg diperlukan (tidak ada udara dalam beton

% udara dalam beton

Jumlah air yg diperlukan (ada udara dalam beton

Page 8: Mix Design (Standard Aci)

3 Menentukan vol total aggregat kasar utk 1 satuan volume betonmodulus kehalusan pasir 3.13UKURAN AGGREGAT 20

Uk max. volume total aggregat kasar per satuanaggregat kasar volume beton untuk harga finnesses

modulus pasirmm 2.4 2.6 2.8 310 0.5 0.48 0.46 0.44

12.5 0.59 0.57 0.55 0.5320 0.66 0.64 0.62 0.625 0.71 0.69 0.67 0.6540 0.75 0.73 0.71 0.6950 0.78 0.76 0.74 0.7270 0.82 0.8 0.78 0.76

150 0.87 0.85 0.83 0.81

dari tabel diperoleh volumetotal aggregat kasar = 0.6Berat isi aggregat kasar 1.7 t/m3Jadi berat ag. Kasar(split) 1020 Kg

4 Menentukan jumlah pasir dalam adukanberat / berat jenis

vol semen = 117.52 liter

vol air = 200.00 litervol split = 384.91 litertotal 702.42 liter

Jadi volume pasir = 297.58 literBerat pasir = 773.70 Kg

5 Hasil Mix DesignUntuk 1 m3 beton Semen 371.35 KgW/C 0.5386 Air (W) 200.00 LtrPasir (S) 773.70 KgSplit (G) 1,020.00 Kg