Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J....
-
Upload
dustin-charles -
Category
Documents
-
view
214 -
download
2
Transcript of Mission Directorate Exploration Systems MSFC CD Chief S&MA Officer MSFC SMA DART Project Office (J....
Mission Directorate Exploration Systems
MSFC CD
Chief S&MA Officer
MSFC SMA DART Project Office (J. Snoddy)
DART Contract
(CPIF)
17
Mission Directorate Space Operations
KSC LSPOKSC SMA
KSC CD
SELVES Contract
(FFP)
Orbital Sciences Corp. LSG-Pegasus
L10-11 VAFB INT & OPS
Vehicle
VAFB- Range Safety- Ground Safety- Range LRR
Pegasus
Orbital Sciences Corp. LSG-DART
S/W IV&V (P. Medley)
ARPO
Explorers Program Office
KSC LS SMA
1 SMA (T. Arrigo)
KSC LS SMA Quality Mgr (K. Monette) Safety Mgr (H. Schultz)
FAA -- L1011 Airworthiness -- Public Safety
DART SMA Mgr (M. Kennedy)
6 7 8
3
1
DART Mission Assurance Process Map
DART
KSC LSP Mission Int. (Bellinger) Res. Office (Westoff)
DART SMA Qual Eng (Pierce)
OSC LSG Qual,Safety&Rel
Assurance
OSC TSD Quality
Assurance
MSFC SMA DART S/W Assurance (Mitchell)
MSFC SMA Test Engr
(Kalia)
AVGS
MSFC DART SMA Qual Insp (Blair)
MSFC DART SMA Qual
Assur (Rains)
4
5
11 12 13 14
1819 20
21Matrix-ed relationshipDirect report relationshipInformation flow
Independent MA activityIn-line MA activity
SFIA (D. Elliott)
LS SMA MAM (J. Roddy)
2
MSFC SMA DART S/W Assurance (Mitchell)
OSC S/W
Assur.
15
16
10
LSP Eng Teams (J. Wood,
B. Henry)
9
Ref Mission Phase
***
DART Mission Assurance Activities Location Point of Contact Organization
1 1,2,5-10
KSC SMA/Launch Services Division SMA (KSC LS SMA) Mission Assurance Mgr. : Pegasus Flt. Readiness assessment and SMA support to KSC Launch Services Program (LSP) (L3)
KSC Jordan Roddy KSC LS SMA
2 2 KSC SMA Space Flight Independent Assessment (SFIA) Focused IA to KSC LSP (L3) KSC Dawn Elliott KSC LS SMA
3 2,5-10 LSP Vehicle Engineering Specialty Teams: Chief Engr and Vehicle Systems Lead. Mission Analysis, ERBs, TIMs, Design Reviews, Readiness Reviews, Project Decision Meetings, Mission-Unique Design Validation and Verification to Orbital Sciences Corp. (OSC) Launch Services Group (LSG) – Pegasus (L4-5)
KSC James WoodBob Henry
KSC LSP
4 3,4,5 DART SMA Manager to OSC LSG-DART: Reliability prediction/FEMA, Safety Training (L5); Hazard analyses, Monitoring of mishap reporting, GIDEP alerts, Review of discrepancy reports, Limited Life Item Status, Mission Risks Review, Waivers/Deviations Review (L3)
Dulles Marcie Kennedy MSFC SMA
5 2-7 Software IV&V to DART operational elements (L3) GSFC Peter Medley NASA HQ
6 9 FAA oversight of L10-11 (Airworthiness and Public Safety) Moave FAA
7 5-10 KSC LS SMA Quality Management to Pegasus Integration & Test (L3) VAFB Kevin Monette KSC LS SMA
7 5-10 KSC LS SMA Safety Management to Pegasus Integration & Test (L3) VAFB Heidi Schultz KSC LS SMA
8 2,5-10 KSC LSP Mission Integration Engineering (Spacecraft integration to LV). Approval of integration reqmts. (L4-5) Dulles Frank Bellinger KSC LS SMA
9 2,5-10 KSC LSP Resident Office Engineering support to VAFB Payload Integration and Launch Operations (L4) Chandler Wendy Westoff KSC LSP
10 2,5-10 KSC LS SMA support to VAFB Payload Integration and Launch Operations (L4) KSC Tony Arrigo KSC LS SMA
11 1-10 OSC LSG Quality, Safety & Reliability Assurance to Vehicle Hardware Development and Test (direct in-line contractor participation) (L5)
Dulles OSC LSG
12 3,4 Systems Test Engineering and Reliability Consultation to Vehicle Hardware Development and Test (L3) Dulles Prince Kalia MSFC SMA
13 3,4 Systems Test Engineering and Reliability Consultation to AVGS Hardware Development and Test (L3) Dulles Prince Kalia MSFC SMA
14 1-7 OSC Technical Services Division (TSD) Quality Assurance to AVGS Hardware Development and Test (direct in-line contractor participation) (L5)
Dulles OSC TSD
15 2-7 OSC S/W Quality Assurance to Autonomous Rendezvous & Proximity Operations (ARPO) S/W Development (L5) Dulles OSC
16 2-7 Software Assurance to DART on-board computer software development (L3) MSFC George Mitchell MSFC DART SMA
17 3,4 Quality Engineering surveillance of Vehicle Hardware Development, Assembly, and Test (L5) Dulles Jim Pierce MSFC SMA
18 3,4 Quality Engineering surveillance of AVGS Hardware Development and Test, and vehicle systems integration test (L5) Dulles Jim Pierce MSFC SMA
19 1,2,3 Quality Assurance SMA surveillance to AVGS Hardware Development and Test (L5) Dulles Rains MSFC DART SMA
20 1 Quality Assurance (Receiving & Inspection) to AVGS Hardware Development (L5) MSFC Blair MSFC DART SMA
21 2-7 Software Assurance to AVGS Software Development (L5) MSFC George Mitchell MSFC DART SMA
*** Mission Phases:1. Procurement, 2. Design (HW & SW), 3. Payload Manufacture, 4. Payload Systems test, 5. S/C integration to LV, 6. LV integration, 7. System test and Simulated flight, 8. Pre-launch Ops, 9. Launch ops, 10. Post-launch ops.