Mirant Mid-AtlanticMWAQC Technical Advisory Committee BriefingJanuary 21, 2005
![Page 2: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/2.jpg)
Discussion Topics
NOx Settlement Progress Report on Current Projects View on Multipollutant Legislation
![Page 3: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/3.jpg)
NOx Settlement
![Page 4: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/4.jpg)
Key Elementsof Mid-Atlantic Global NOx Settlement
Control Technology to be Installed– Potomac River 3,4,5 – Low NOx Burners in 2004, SOFA in 2005– Morgantown 1,2 – SCRs in 2007, 2008
Declining NOx Tonnage Caps from 2004 through 2010– Ozone Season Caps – for Potomac River and System– Annual Caps – for System
Emissions Rate Limits– Ozone Season System limit of 0.150 lb/MBtu starting in 2008– Morgantown SCRs limit of 0.100 year-round, once installed
Penalty and Projects– Cash payment of $500,000– Supplemental Projects totaling $1.0 M to reduce dust and particulate matter
emissions at the site
![Page 5: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/5.jpg)
Terms of SettlementNOx Caps & Trading Provisions
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
2004 2005 2006 2007 2008 2009 2010
Year
Ozone Season Cap Annual Cap
![Page 6: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/6.jpg)
Environmental ProjectsPROJECT Est. PM Reduction Ash Silo Vent Secondary Filters 30 tons Truck Wash Facility 13.7 tons Coal Pile Fencing 2.8 tons Coal Pile Binding Agent 800 lbs Ash Unloader Replacement 200 lbs Truck Loading Dust Suppression 200 lbs Railcar Unloading Dust Suppression 200 lbs Settled Dust Study Contribution to Clean Air Partners
TOTAL Cost = $1,000,000
![Page 7: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/7.jpg)
Annual System NOx Reductions
Mid-Atlantic System Annual NOx Emissions
0
10000
20000
30000
40000
50000
60000
70000
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Year
An
nu
al N
Ox
Em
issi
on
s
73% Reduction thru 2010
35% Reduction from 1999
Absolute NOx Limits
![Page 8: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/8.jpg)
Summer NOx Reductions
Potomac River Summer NOx Emissions
1000
1500
2000
2500
3000
3500
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Year
Ozo
ne
Se
as
on
NO
x
36% Reduction since 1999
55% Reduction thru 2010
Absolute NOx Limits
![Page 9: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/9.jpg)
Benefits of Settlement
Resolves Potomac River NOV Achieves 0.15 lb/MBtu system NOx average by 2008 Year-round SCR operation will reduce PM2.5 emissions Emission caps ensure environmental benefit while
allowing flexibility over methods to reach compliance targets
When paired with future SO2 controls, significant Hg and additional PM2.5 reductions
![Page 10: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/10.jpg)
Progress on NOx Projects
![Page 11: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/11.jpg)
Current NOx Projects
Chalk Point Unit #2 SACR Morgantown #1 SCR Potomac River #3-5 SOFA
![Page 12: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/12.jpg)
Chalk Point #2 SACR
SACR = Selective Auto-Catalytic Reduction Injects ammonia + natural gas in convection pass of
boiler Gas acts as catalyst for NOx reduction and consumes
excess ammonia Expecting ~50% reduction in NOx In final engineering / procurement phase Reagent switch from anhydrous ammonia to urea System in service late 2005 / early 2006
![Page 13: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/13.jpg)
Morgantown #1 SCR
First SCR went out for bids in October 2004 Bid evaluation process underway Currently on schedule for May 2007 in-service date Urea selected as reagent
![Page 14: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/14.jpg)
Potomac River #3-5 SOFA
Dampers, drives, ductwork being procured / fabricated All three units to be retrofitted this spring Low NOx burners installed on Units 3-5 last spring -
15% reduction Low NOx burners installed on Unit 1-2 last fall - 5-10%
reduction
![Page 15: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/15.jpg)
Potomac River SOFA
![Page 16: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/16.jpg)
Burner Corner
SOFA Port
![Page 17: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/17.jpg)
SOFA Ductwork
![Page 18: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/18.jpg)
Multipollutant Legislation
![Page 19: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/19.jpg)
Multipollutant Legislation Cap & Trade approach vs. Percent Reduction Realistic Timeline to Implement
– Technical: Time to engineer, procure, and install– Financial: Cost of NOx, SO2, & Hg controls simultaneously– Alignment with Federal programs
Mercury– Substantial Co-benefits from NOx & SO2 controls– No large scale / long term demonstrations yet– Continuous Hg monitors not commercially available
CO2– Few options for significant reduction on coal-fired units– Fuel switch / repowering to gas costly to customer and generator
![Page 20: Mirant Mid-Atlantic MWAQC Technical Advisory Committee Briefing January 21, 2005.](https://reader035.fdocuments.net/reader035/viewer/2022062716/56649dfe5503460f94ae6459/html5/thumbnails/20.jpg)
Questions