MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE … · Disclaimer0241 MINISTRY OF TRANSPORTATION AND...
Transcript of MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE … · Disclaimer0241 MINISTRY OF TRANSPORTATION AND...
Disclaimer0241
MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE ROCKWORK ENGINEERING
March 2018
SITE REFERENCE INFORMATION
Project 86002-0241
Rock Slope Stabilization, Jackass Mountain Bluff, Zones 14 to 15
Information provided in the site reference material is intended to be used by the Ministry of Transportation and Infrastructure in conjunction with other data relevant to the site. Although reasonable care has been exercised in collecting and assembling the site reference photographs and other data, the Ministry does not warrant the information for accuracy or reliability. The conditions shown are representative of the locations at the time the photos were taken and other data collected. These conditions are subject to change with time. Any interpretation placed on this information by the Contractor will be at the Contractor’s own risk.
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 1 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
To Lytton To Hope
Photo #1: Overall view of site showing location of proposed work in Zones 14 and 15Ref# 11641 SCP May 12, 2017
0.0000.098
0.2910.212
Zone 15Zone 14
Zone 13Zone 11
Zone 12
Zone 10Zone 9
Existing shotcrete (2005)
Existing bolts (1991) in Zones 14 to 15 not shown -- 4 m to 8 m long
Proposed work:
Scale 6930 m2
Gabion mesh 6157 m2
Tecco mesh 773 m2
Bolts 38x6m = 228 m
Shotcrete 126 m3
Avalanche path# 92.0
Proposed 12 stanchions Type 5 vertical heights above pavement
Stan#
7
8
9
10
11
12
13
14
15
16
17
18
Ht (m)
16
29
31
43
37
19
23
23
22
20
17
12
7
89
1011
1213141516
1718
Tecco mesh
Install Tecco mesh stanchions 12 to 14
Gabion mesh
Gabion mesh
Jackass Summit Pullout
Confine scaling to entire mesh area, do not disturb upper slopes
Scaling to be within outlined gabion and Tecco mesh areas
Photo #2: View showing proposed work in Zone 14Ref# 7407 SCP October 31, 2007
0.0980.212 Zone 14Zone 15 Zone 13
Existing bolts (1991) circled -- 4 m to 8 m long
3 guy cables
3 guy cablesMain anchors and guy cables
7
8
9
1011
12
1314
Install Tecco mesh between stanchions 12 and 14
Tecco mesh
Area 1Area 2Area 3
Area 4
Area 5
Area 6
Area 7Area 8
Area 9
Area 10
Area 11
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 2 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Gabion mesh
Main anchors
Photo #3: View showing proposed work in Zone 15Ref# 7407 SCP October 31, 2007
0.212
Existing bolts (1991) circled -- 5 m to 7 m long
0.291 Zone 15Zone 16 Zone 14
3 guy cables
3 guy cables
12
1314
15
16
17
18
Tecco mesh
Install Tecco mesh between stanchions 12 and 14
Area 1Area 2Area 3
Area 6
Area 5
Area 4
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 3 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Gabion mesh
Photos #4: View showing proposed work in Zones 13 to 14 Ref# 11649 SCP May 30, 2017
78
910
0.098Zone 14 Zone 13
Some existing bolts (1991) circled -- 5 m long
Area 1
Shotcrete 5 m3
Bolts 2x6m
Area 3
Shotcrete 20 m3
Bolts 2x6m
Area 2Bolts 4x6m
Areas 4 to 11
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 4 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #5: View showing proposed work in Zone 14 – south portion Ref# 11649 SCP May 30, 2017
89
10
11
0.098Zone 14
Zone 13
7
Area 3
Shotcrete 20 m3
Bolts 2x6m
Area 2Bolts 4x6m
Area 1
Shotcrete 5 m3
Bolts 2x6m
Areas 4 to 11
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 5 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #6: View showing proposed work in Zone 14 – central portion Ref# 11649 SCP May 30, 2017
8
10
11
9
7
12
1314
0.098
Zone 14
0.212
Existing bolts (1991) circled -- 4 m to 8 m long
Area 6
Shotcrete 10 m3
Area 4
Shotcrete 15 m3
Bolts 5x6m
Area 7
Shotcrete 3 m3
Area 5
Shotcrete 5 m3
Bolts 2x6m
Area 10
Area 11
Areas 1 to 3Area 8
Area 9
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 6 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #7: View showing proposed work in Zone 14 – north portion Ref# 11649 SCP May 30, 2017
8
1011
9
7
12
13
14
15
0.098Zone 140.212
Area 5
Shotcrete 5 m3
Bolts 2x6m
Areas 1 to 4
Area 6
Shotcrete 10 m3
Area 7
Shotcrete 3 m3Area 8
Shotcrete 10 m3
Area 9
Bolts 2x6m
Area 10
Area 11
Existing bolts (1991) circled -- 4 m to 8 m long
Shotcrete 2 m3
Shotcrete 2 m3
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 7 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #8: View showing proposed work in Zones 14 to 15 Ref# 11649 SCP May 30, 2017
8
10
11
9
1213
14
15
16
Zone 140.212
Zone 15
Area 6
Area 8Shotcrete 10 m3
Area 9
Bolts 2x6m
Area 10Area 11
Area 5
Shotcrete 2 m3Shotcrete 2 m3
Areas 1 to 4
Some existing bolts (1991) circled -- 4 m to 8 m long
Area 1
Shotcrete 5 m3
Bolts 3x6m
Area 2
Shotcrete 5 m3
Bolts 6x6m
Areas 3 to 6
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 8 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #9: View showing proposed work in Zone 15 – south portion Ref# 11649 SCP May 30, 2017
10
11
12
13
14
15
16
17
89
Zone 140.212Zone 15
Area 1
Shotcrete 5 m3
Bolts 3x6mArea 2
Shotcrete 5 m3
Bolts 6x6m
Some existing bolts (1991) circled -- 4 m to 8 m long
Areas 1 to 11
Area 3
Shotcrete 2 m3Areas 4 to 6
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 9 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #10: View showing proposed work in Zone 15 – central portion Ref# 11649 SCP May 30, 2017
11
12
13
1516
17
18
14
Zone 14
0.212Zone 15
0.291Area 4
Shotcrete 25 m3
Bolts 6x6m Areas 1 to 3Area 5
Shotcrete 2 m3
Bolts 2x6mArea 6
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 10 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #11: View showing proposed work in Zone 15 – north portion Ref# 11649 SCP May 30, 2017
11
12
13
15
1617
18
14
0.212Zone 150.291
Area 6
Shotcrete 15 m3
Bolts 4x6m Areas 1 to 5
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 11 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6
Photos #12: View showing proposed work in Zone 15 – north end Ref# 11649 SCP May 30, 2017
15
16
17
18
14
0.212Zone 150.291
Areas 1 to 6
File: 0241_Jackass_Mountain_Bluff_Zones_14_to_15_Photos_Proposed_Work_May_23_2017.pptx
May 23, 2017
Ministry of Transportation and Infrastructure, Rockwork Engineering File: 33300-30/0241.10Photographs Showing Proposed Work, Rockwork Project No. 86002-0241
Page 12 of 12Jackass Mountain Bluff Zones 14 to 15, Highway #1RFI Landmark No.: 200100, RFI Landmark Name: Jackass Summit, RFI Offset: 0.098 to 0.291 kmLKI Segment: 0905, LKI Segment Name: Hope to Lytton, LKI km: 91.4 to 91.6