MINISTRY OF MINES AND ENERGY
PLANNING AND PLANNING AND BRAZILIAN ENERGY BRAZILIAN ENERGY
MATRIX MATRIX
July of 2006
Ministry Silas Rondeau
SUMARY
1 – Brazilian Electrical System
2 – Energy Planning
3 – Energy Matrix
4 – Ten Year Electrical Energy Expansion Plan 2006/2015
5 – Key Projects
6 – Electrical Energy Auctions
7 – Others Energy Souces
8 – Agro-industry
9 – Oil and Gas
BRAZILIAN ELECTRICAL SYSTEM
João Pessoa
Rio Grandedo Sul
São PauloRio de Janeiro
Paraná
Uruguai
Vitória
Pará
Paraíba
Ceará
RecifeMaceió
AracajúSalvador
Mato Grosso
Brasília
Argentina
Installed Capacity = 93,926 MW• Hydro = 71,614 MW – 76.3 %•Thermal = 20,276 MW – 21.6 %•Nuclear = 2,007 MW – 2.1 %
Number of Consumer Units = 57.0 million
Energy Production = 420.0 TWh/year
(58% of South America)
Pick load = 61,800 MW(EQUIVALENT TO UNITED KINGDOM OR ITALY)
Transmission Lines = 87 518 km
Generation : 85% State owned companies 15% Private companies
Transmission: 26 companies (15 private companies) Distribution: 64 companies (80% private companies)
Source : MME
Amazonas Maranhão
4 000 km
Sistemas Stand-alones
3.750 km 3.900 km
Continental Dimensions
BRAZIL EUROPE
BRAZILIAN ELECTRICAL SYSTEM
BRAZILIAN ELECTRICAL SYSTEM
Thermal plantsMain Source
Isolated Systems
2 % of the Total Energy Market
1,448 kmTransmission
200 MWImports
3,186 MWInstalled Capacity
HydroelectricityMain Source
Interconnected System
98 % of the Total Energy Market
84,795 kmTransmission
7,970 MWImports
89,838 MWInstalled Capacity
ISOLATED SYSTEMS
INTERCONNECTED SYSTEM
Source: MME April - 2006
BRAZILIAN ELECTRICAL SYSTEM
Source: MME, 2005
International interconnections
ITEM PRODUCT ORIGIN DESTINATION CAPACITY
1 Electrical Energy Venezuela Boa Vista - RR 200 MW
2 Electrical Energy Paraguay/Itaipu Foz do Iguaçu 5,600 MW
3 Electrical Energy Paraguay/Ande Foz do Iguaçu 50 MW
4 Electrical Energy Brazil/Argentina Garabi - RS 2,200 MW
5 Electrical Energy Brazil/Uruguay Livramento - RS 70 MW
6 Electrical Energy Argentina Uruguaiana - RS 50 MW
7 Gas Bolívia Corumbá - MS 30 millions m3
8 Gas Argentina Uruguaiana - RS 2,5 millions m3
BrazilBolivia
7 (GN)
Paraguay 3
4Argentina
8 (GN)
Uruguay
5
1
Venezuela
2
6
Ministry of Mines and Energy
ENERGY PLANNINGENERGY PLANNING
THE PLANNING PROCESS
Basics planning goals of MME:Basics planning goals of MME:
Long term studies up to 30 yearsLong term studies up to 30 years
Purpose: Integrated and global energetic goalPurpose: Integrated and global energetic goal
The Planning Process:The Planning Process:
Coordination and Definitions: MMECoordination and Definitions: MME
Studies Development: EPEStudies Development: EPE
Interaction with CNPE and Society: MMEInteraction with CNPE and Society: MME
THE PLANNING PROCESS
Ministry of Mines and Energy
ENERGY MATRIX ENERGY MATRIX
The most competitive source of the countryRenewable resource Available Power: 260 GW (28% in operation)
HYDRO PLANTS
Expressive power available for generation of electrical energy)Renewable ResourceAvailable Power over 500 MW/year
BIOMASS
Important reserves of mineral coal are available32 billion ton (90% in Rio Grande do Sul State)Power of 20,000 MW available for 100 years (supposing 50% used for generation of electrical energy)
MINERAL COAL
NUCLEAR6 th largest reserve of uranium in the world 32 billion ton (equivalent to a 1.2 billion toe )Huge power for generation of electrical energy
NATURAL GASReserve of 306 billion m3 (equivalent to 0.3 billion toe)Production: 48 million m3/day (2005)50% of Brazilian natural gas market was supplied with national production (2005)
toe – ton oil equivalent
MAIN SOURCES FOR ELECTRICTY GENERATION
Brazil
RENEWABLE NO RENEWABLE
0
20
40
60
80
100
World
14
86
4555
Source: MME, 2006
RENEWABLE SOURCES: BRAZIL AND THE WORLD
ENERGY MATRIX - 2005
Source: MME 2006
Oil 38.4%
Natural Gas9.3%
Uranium1.2%
Hidroeletricity15.0%
Other Renewable
Sources2.7%
Sugar Cane13.9%Wood
13.1%
Coal6.4%
Renewable sources:
Brazil 2005 – 45 %
World 2003 – 14 %
OCDE 2003 – 7.1 %
100%218.6 million [toe]
Matrix associated with generation of electrical energy.
Included energy imported from Itaipu. Source: MME 2006
BRAZILIAN ELECTRICAL ENERGY MATRIX
100%441.6 [TWh]
Renewable Sources:
Brazil 2005 – 89%
World 2003 – 18%
Hydro85.4%
Uranium2.2%
OilDerivatives
2.8%Biomass
3.9%
Natural Gas4.1%
Coal1.6%
AGENDA
TEN YEAR EXPANSION PLAN2006-2015
Ministry of Mines and Energy
TEN YEAR EXPANSION PLAN 2006-2015
Important aspects:Important aspects:
MME guidelines: Specific plans, since long term studies are on execution.
Electrical Energy Market: from 374 TWh, in 2005, to 618 TWh, in 2015, requiring increments from 2,500 to 3,300 MW per year (firm energy) in the supply capacity, over the ten year period.
Supply: Adjustment of supply capacity to market requirements
At the end of planning period:
Brazil strongly interconnected.
TEN YEAR EXPANSION PLAN 2006-2015
Reference Terms: Developed by MME and handed to all public and private agents.
Plan Technical Studies: developed by EPE (Enterprise of Energetic Resource) under contract, supervision and follow up by MME.
Integration MME/EPE: strong interaction during the process with the teams of EPE and of MME/SPE.
Report of Ten Year Expansion Plan - 2006/2015: subject to public consultation on MME’s home page at http://www.mme .gov.br
Preparation Process:Preparation Process:
TEN YEAR EXPANSION PLAN 2006-2015 DEMAND
Market Forecast: three projections of the economic growth
0 2 4 6 8
2006-2011
2011-2016
0 2 4 6 8
2006-2011
2011-2016
0 2 4 6 8
2006-2011
2011-2016
6.0%
4.5%
HIGH GROWTH
4.5%
4.0%
REFERENCE GROWTH
3.5%
3.0%
LOW GROWTH
ten years average of GDP: 5.0% p.a.
GDP
ten years average of GDP: 4.2% p.a.
ten years average of GDP: 3.1% p.a.
TEN YEAR EXPANSION PLAN 2006-2015 DEMAND
Obs.: Load supplied by Electricity System without classic self-production (without use the transmission lines). **Trajectory of reference
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 201546 341 48 591 51 120 53 703 56 167 58 635 61 342 64 522 67 757 70 800 73 998
Load of Electricity** [MWyear]
300 000
350 000
400 000
450 000
500 000
550 000
600 000
2005 2007 2009 2011 2013 2015
High
Reference
Low
Total demand - Brazil (GWh)Total demand - Brazil (GWh) Load - Brazil (MWyear)Load - Brazil (MWyear)
45 000
50 000
55 000
60 000
65 000
70 000
75 000
80 000
85 000
(*) percentual of reference forecast
11,732MW year15.4% (*)
High
Reference
Low
87.2 TWh9,954 MWyear16.9% (*)
2005 2007 2009 2011 2013 2015
TEN YEAR EXPANSION PLAN 2006-2015 DEMAND
Industrial43.2%
Other13.7% Residential
25.1%Commercial
18.0%
Industrial46.5%
Other14.4%Commercial
15.3%
Residential23.8%
2005 2015
Total 2005*: 346 TWh Total 2015*: 567 TWh
* Without classic self-production (when energy is produced near the load and without using the transmission system) .
Consumption StructureConsumption Structure
TEN YEAR EXPANSION PLAN 2006-2015 SUPPLY
Sources:Sources:
Hydroelectricity;
Natural Gas;
Coal;
Biomass*;
Small Hydro Plants*;
Wind Power Plant*;
Nuclear
Cogeneration by natural gas;
Modernization and Power Upgrading;
* Sources of the governmental program called PROINFA
TEN YEAR EXPANSION PLAN 2006-2015 GRID
System under study:System under study:
REFERENCE GROWTH
GROWTH GDP = 4.2% Population = 2.0 millions/year
Electrical energy consumption = 5.1% year
INSTALLED CAPACITY
2005 – 92,865 MW
2015 – 134,667 MW
ENERGY NECESSARY
2005 – 47,500 MW average
2015 – 76,000 MW average
DEMAND NECESSARY
2005 – 62,000 MWh/h
2015 – 99,000 MWh/h
BASIC GRID
2005 – 82,092 km
2015 – 123,429 km
41,800 MW INSTALLED
CAPACITY IN 10 YEARS
Investments US$ 56 billions by 10 years
Source: MME, PDEE 2006-2015
41,300 Km OF TRANSMISSION LINES IN 10 YEARS
TEN YEAR EXPANSION PLAN 2006-2015 SUMMARY
HYDRO73% NUCLEAR
2%
COAL2%
PCH, PROINFA, etc.3%
FUEL OIL1%
GAS9%
IMPORTS8%
DIESEL OIL2%
BIOMASS0%
OTHERS10%
HYDRO73%
NUCLEAR2%
PCH, PROINFA, etc.4%
FUEL OIL1%
GAS9%
IMPORTS6%
DIESEL OIL2%
BIOMASS1%
OTHERS12%
COAL2%
Jan/2006 – 93,728 MW (*)
Dec/2015 – 134,667 MW
(*) Included the power of the existing plants in the Isolated Systems that will be connected: Manaus/Macapá and
Rondônia/Acre
Share of the Sources
Source: MME, PDEE 2006-2015
TEN YEAR EXPANSION PLAN 2006-2015 Installed Capacity
Source: MME, PDEE 2006-2015
Interconnections ExpansionInterconnections Expansion
20092009
North (Imperatriz) / North East – 1,500 MW in Dec.
20102010 Magnifying North/South – 1,100 MW in Dec.South/South East /Mid West – 1,000 MW in Dec.
20112011 Madeira / South East – 3,000 MW in Jan.
20122012 Madeira / South East – 3,000 MW in Dec.
20132013 Belo Monte / North – 3,000 MW in Dec. Belo Monte (Colinas) / South East – 1,100 MW in Dec.
20142014 Belo Monte / Colinas – 3,000 MW in Dec.
NE
N/ Man
SE/CO/RO
SIvaiporã
Imperatriz
*
IT
Mad
BM
DC
System
AC System
TEN YEAR EXPANSION PLAN 2006-2015
GRID
AGENDA
KEY PROJECTS
Ministry of Mines and Energy
KEY PROJECTS
Hydro plants on the Madeira riverHydro plants on the Madeira river
AHE Rio Madeira
AHE Santo Antônio
AHE Jirau
BOLIVIA
Madeira river (6,450 MW) JIRAU Hydro plant - Capacity: 3,150 MW
- Expected to operate (first unit): January, 2011.
SANTO ANTÔNIO Hydro plant - Capacity: 3,300 MW
- Expected to operate (first unit): January, 2012.
Total Investment:
US$ 7,378.80 millions
US$ 1.00 = R$ 2.70
KEY PROJECTS
BELO MONTE Hydro plantBELO MONTE Hydro plant
AHE Belo Monte
BELO MONTE - project overview
Xingú river
Capacity: 11,181 MW
Expected to operate (first unit): December, 2013.
Total Investment: US$ 3,162.76 millions
US$ 1.00 = R$ 2.70
Average of ground inundated per power installed:
• UHEs existing: 0.52 km²/MW
• UHEs of PDEE: 0.27 km²/MW
• UHE Belo Monte: 0.04 km²/MW
• UHE Jirau: 0.08 km²/MW
• UHE Santo Antônio: 0.09 km²/MW
ENVIRONMENTAL AND SOCIAL INDICATORS
Source: MME, PDEE 2006-2015
KEY PROJECTS
TRANSMISSION GRID:
• Two circuits, alternating current, 500 kV, 3 350 km, 2 250 MW; and
• Two bipolos, direct current, 600 kV, 2 450 km, 4 200 MW.
System Interconnection Projects - MADEIRASystem Interconnection Projects - MADEIRA
KEY PROJECTS
TRANSMISSION GRID:
• Under study to supply the NW and N regions.
• Existing interconnection already to SE.
Interconnections studied - BELO MONTEInterconnections studied - BELO MONTE
AGENDA
AUCTION 2006
Ministry of Mines and Energy
Auction Date: June 29, 2006
Start of Supply : 2009
Projects that traded electrical energy:
15 Hydro plants and 16 Thermal plants
Results:
Energy traded: 356,314 MWh (1,682 MW year)
Hydro: 270,331 MWh (1,028 MW year)
Thermal: 85,983 MWh (654 MW year)
Total Investment: US$ 16.9 billions
Average Price: Hydro plants - US$ 46.95/MWh
Thermal plants - US$ 49.03/MWh
Average Price - US$ 47.76/MWh
ELECTRICAL ENERGY AUCTION - A-3
US$ 1.00 = R$ 2.70
7 Projects:7 Projects:
Salto Grande53 MWMauá
382 MW
Dardanelos261 MW
Barra do Pomba80 MW
Cambuci50 MW
Santo Antônio3,150 MW
Jirau3,300 MW
MW US$ millions
7,276 7,977
US$ 1.00 = R$ 2.70
Date: 09/05/2006
ELECTRICAL ENERGY AUCTION - A-5
Power Total Investments
TRANSMISSION AUCTION
AUGUST/2006
RIO BRANCO
BOA VISTA
MANAUS
MACAPÁ
BELÉM
SÃO LUÍS
TERESINA
FORTALEZA
NATAL
J OÃOPESSOA
RECIFE
MACEIÓ
ARACAJ U
SALVADOR
CUIABÁ
CAMPO GRANDE
SÃOPAULO
VITÓRIA
RIO DE J ANEIRO
CURITIBA
FLORIANÓPOLIS
PORTOALEGRE
BRASÍLIA
GOIÂNIA
B.HORIZONTE
PALMAS
Jauru
Vilhena
PimentaBueno
Ariquemes
PORTO VELHO
Ji Paraná
Funil
Itapebi
Marimbondo
Poços deCaldas
São Simão
Ribeirão Preto
Ja guaráMasca renhas
Verona
Mato Grosso – Rondônia Integration - 230 kV – 949 km
5 Projects
Completing Norte – Sul Integration 500 kV – 720 km
6 Projects
Mascarenhas – Verona 230 kV – 107 km
Funil – Itapebi 230 kV – 198 km
Auction 01(August, 18 of 2006)
2,261 kmUS$ 414.6 millionsUS$ 1.00 = R$ 2.70
Cascavel Oeste – Foz Iguaçu 230 kV – 115 km
Neves1 – Mesquita 500 kV – 172 km
Bateias
Jaguariaíva
Londrina
Itararé
Paraíso
Açu
Atlântida
CamposNovos
Pirapora
Paracatu
Brumado
Ibicoara
Santa Maria
D. Francisca
Tauá
Picos
Videira
Maringá
RIO BRANCO
BOA VISTA
MANAUS
MACAPÁ
BELÉM
SÃO LUÍS
TERESINA
FORTALEZA
NATAL
J OÃOPESSOA
RECIFE
MACEIÓ
ARACAJ U
SALVADOR
CUIABÁ
CAMPO GRANDE
SÃOPAULO
VITÓRIA
RIO DE J ANEIRO
CURITIBA
FLORIANÓPOLIS
PORTO ALEGRE
BRASÍLIA
GOIÂNIA
B.HORIZONTE
PALMAS
Paraíso – Açu 230 kV – 135 km
Curitiba – Bateias 500 kV – 38 km
C. Novos – Videira 230 kV – 71 km
Tauá – Picos 230 kV – 180 km
Paracatu – Pirapora 500 kV – 260 km
Ibicoara – Brumado 230 kV – 105 km
Londrina – Maringá 230 kV – 83 km
D. Francisca – Santa Maria 230 kV – 66 km
Canoinhas – S.Mateus 230 kV – 48 km
Itararé – Jaguaraíva 230 kV – 40 km
Auction 02(September)
1,026 kmUS$ 199.4 millionsUS$ 1.00 = R$ 2.70
TRANSMISSION AUCTION
SEPTEMBER/2006
OTHERS ENERGY SOURCES
PROINFA, co-coordinated by the Ministry of Mines and
Energy (MME) and implemented by Eletrobrás, is an
important instrument to the diversification of the
national energy mix, once it will guarantee greater
reliability and supply security.
PROINFA has assured the purchase of 3,300 MW from
power plants based on biomass, wind and small hydro
power (SHP) to be connected to the integrated national
grid (SIN).
RENEWABLE ENERGY INCENTIVE PROGRAM PROINFA
GENERAL RESULTS
Programa de Incentivo às
Fontes Alternativas de Energia Elétrica - PROINFA
139 projects hired. :Total capacity 3,300 MW- 06 in operation (capacity – 141.70 MW)- 36 under construction- 52 with EPCs signed
Forecast 2006 – 38 power plants installed ( 938.27 MW)Forecast 2007 – 101 power plants installed (2,211.73 MW)
Renewable Energy Incentive Program PROINFA
AGRO- INDUSTRY
Current Situation:
Number of Sugar mills/Distilleries: 313 Production: 16 million m3
Production Capacity: 18 million m3
Cropped Area for ethanol Production: 3 million hectares
As of 2010:
Investments that will amount US$ 10.0 billion in 89 plants Increase in the ethanol production (in comparison with 2005): 8 million m3
Expansion in the sugarcane cropped area: 2 million hectares
BRAZIL (Territorial Extension): 851Total Agriculture Area: 383
of which:Fertile and free areas for agriculture: 91Present cropped area for ethanol: 3
(in million of hectares)
Source: Ministry of Mines and Energy;Ministry of Agriculture, Livestock and Food Supply - 2005
SUGARCANE AGRO-INDUSTRY
FLEX-FUEL Technology
Any mixture of gasoline and alcohol can be used, from 0 to 100% ; In May/2006: The domestic flex-fuel vehicle sales represented 71% of
all light vehicles (including imported) sold in the same period;
Total domestic flex-fuel vehicle sales (2003-2006): 1,757,606 units. (*)
7 multinational automotive manufacturers settled in Brazil are producing 32 different models of
FFV vehiclesLast June, an automotive manufacturer
announced that, from now on, it will going to produce FFV vehicles only.
(*) until May/2006.
Source: Ministry of Development, Industry and Foreign Trade;Brazilian Association of Automotive Vehicle Manufacturers - 2006
AGRI-ENERGY - ETHANOL
(*) Elaborated with obtained information of producing potentials and investors. Position of 31/05/06.ANP: National Petroleum AgencySRF: IRS (Internal Revenue Service)
Legend:
Under Construction or Project
In Commercial Operation
New Project Intentions
In Authorization Process (ANP / SRF)
2005to
2007
Authorized 2%
2008to
2012
Mandatory 2%
From 2013on
Mandatory 5%
Number of Plants
Installed Capacity (MM L/year)
• IN COMMERCIAL OPERATION 7 91
• IN AUTHORIZATION PROCESS (ANP / SRF) 15 366
• UNDER CONSTRUCTION OR PROJECT 15 813
• NEW PROJECTS 15 687
TOTAL 52 1,957
BIODIESEL: Producers in Commercial Operation and Projects Forecast (As of Dec/2007)
In 2005, The Federal Government has established:
The mandatory B2 mixture is now anticipated for January of 2006, only for biodiesel produced by industries that have the so-called Social Fuel Certificate and commercialized in public auctions promoted by the National Agency of Petroleum – ANP.
(1) And (2): One single Auction with two Lots that will take place in July, 11th and 12th of 2006.
ANP = National Petroleum Agency
Biodiesel Auctions
Auction Volume
(Million liters)
Deliver
Nov/2005 70 2006
Mar/2006 170 2006 and 2007
Jul/2006 (1) ( 2) 600 2007
BIODIESEL AUCTIONS
H-BIO: A NEW BRAZILIAN TECHNOLOGY
Diesel oil production process that uses vegetable oils as raw materials in a petroleum refinery.
Hidrogenation of the mixture: diesel + vegetable oil.
H-BIO AND BIODIESEL:COMPLEMENTARY PROCESSES
BiodieselBiodiesel
GlGlyycerin cerin OthersOthers
Refinery
Hidrogen Fractions of diesel
Gas Station
Distributors
Agribusiness
Plantation Oil Crushing
Grains
RefinedOil
DieselDiesel
H-BIO
B2 or B5
mixtureDieselOR
TransesterificationUnitEthanol Ethanol
or
MethanolMethanol
OR
OR
BIOFUELS PRODUCTION
Castor Beans Sunflower Palm Oil CottonSoy
Average Agriculture Productivity
1,500 kg/ha 1,500 kg/ha 3,000 kg/ha 20,000 kg/ha 3,000 kg/ha
Percentage of Vegetable Oil
47% 42% 18% 20% 15%
Vegetable Oil Production (kg/ha)
705 630 540 4,000 450
Brazilian Production in 2005 m3/year
90,000 23,000 5,600,000 151,000 315,000
CHARGE OPTIONS FOR H-BIO PROCESS
OIL AND GAS
500
1.000
1.500
2.000
2.500
3.000
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
Thousand barrels/day
Oil Production Oil Products + NG and Alcohol Consumption Oil Products Consumption
1995
45%
2000
71%
2005
96%
Production/Consumption Ratio
SELF-SUFFICIENCY
APRIL/2006
OIL: SELF-SUFFICIENCY
Refineries : (13) – nominal capacity: 2,000 thousand barrels/dayNew Refineries: (2) – nominal capacity: 350 thousand barrels/dayPetrochemical (4) – nominal capacity: 7,500 thousand ton / yearComplexes:
Estimated Investiments
Refineries: US$ 9 billion
Petrochemical Complexes: US$ 8.5 billion
REFINING AND PETROCHEMICAL
Source: ANP May/2006
Evolution of the Natural Gas Production in Brazil
25,05 26,9229,56
32,4836,29
38,3542,53 43,27
46,3748,48
56,80
65,60
81,17
90,20
101,80
-
20,00
40,00
60,00
80,00
100,00
120,00
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Millio
n d
e m
³/d
Production Foreseen
BRAZILIAN MARKET OF NATURAL GAS
• Gas pipelines network expansion: 4,557.6 km• Investment: US$ 4.5 billion
Present Pipelines Gas Pipes under implementation
New Gas Pipes
PIPELINES kmIVESTMENT
US$ million
Present 5,688 -
Under Implementation
1,076 1,054
New 3,481.6 3,469
Total 10,245.6 4,523
Markets million m³/d
Consumption (*) 46.6
Potential until 2010 127
(*) Industry, automobile, residence, commerce, power generation, cogeneration and orders (including CNG).
#
S
Northeastern Network
GaseneSoutheastern Network
North Network
South Network Expansion
GAS PIPELINES NETWORK
Stable rules
More than US$ 1.3 billion in signature bonus
US$ 16 billions in exploration and production of predicted investments (Minimum Exploratory Program)
594 awarded blocks
64 E&P concessionaries 28 from Brazil
36 foreign companies from 16 different countries
Stable rules
More than US$ 1.3 billion in signature bonus
US$ 16 billions in exploration and production of predicted investments (Minimum Exploratory Program)
594 awarded blocks
64 E&P concessionaries 28 from Brazil
36 foreign companies from 16 different countries
Perspective for 20068th Bidding Round for Exploratories
Blocks
Perspective for 20068th Bidding Round for Exploratories
Blocks
Sedimentary basins: • 6.4 millions sq km
Granted area: • 332 thousand sq km (5%)
Sedimentary basins: • 6.4 millions sq km
Granted area: • 332 thousand sq km (5%)
Source: MME/ANP (Feb/2006)
SEVEN SUCCESSFUL ROUNDS: 1999-2005
OBJECTIVES
Replace petroleum reserves to guarantee the self-sufficiency at medium and long term
Replace and increase the natural gas reserves in order to enhance the production Expectation: enhancement of 30% in the natural
gas offer
8TH BIDDING ROUND FOR EXPLORATORIES BLOCKSSEPTEMBER OF 2006
MINISTRY OF MINES AND ENERGY
PLANNING AND PLANNING AND BRAZILIAN ENERGY BRAZILIAN ENERGY
MATRIX MATRIX
July of 2006
Ministry Silas Rondeau