Mine & Associated RehabilitationProjects inAfrica & the Indian Ocean
IslandsatLargeIndustrialScaleApplication
byRoley Nöffke
Hydromulch (Pty) LtdJohannesburg,
Republic of South Africa
12/14/17 THEVETIVERNETWORKINTERNATIONAL 1
Introduction
12/14/17 THEVETIVERNETWORKINTERNATIONAL 2
Mining and associated rehabilitation projects in Africaand the Indian Ocean Islands have been successfully
implemented jointly under the guidance and auspices of“The Vetiver Network International (TVNI) and the
International Erosion Control Association (IECA) as a resultof the interaction that has developed between the twoorganisations in Africa and on the Indian Ocean Islands.
12/14/17 THEVETIVERNETWORKINTERNATIONAL 3
Itisrecordedthatpractically95%of the53countriesontheentireAfrican Continent(includingIslands)have successfullyimplementedtheVetiver Systemforsoil&waterconservation overthepast20years. Ashortoverviewofprojectsinthe followingcountriesIllustratecurrentactivitiesusingtheVetiverSystem:
1.DemocraticRepublicofCongo 2.Congo-Brazzaville 3.Congo-PointeNoire/Brazzaville 4.Guinea 5.MadagascarA&B 6.SouthAfrica.
Thesecasestudiesreflectthemajor Stridesthathavebeenachievedin Erosion&sedimentcontrol,bio- Engineering&vegetationrestoration Andtheparticipationoflocal Communitiesingeneral.
Project No. 1 -Selembao Project, Democratic Republic of Congo
12/14/17 THEVETIVERNETWORKINTERNATIONAL 4
Collapsed bridges and urbanroads preventing access toproperties
Abandoned homes & properties
12/14/17 THEVETIVERNETWORKINTERNATIONAL 5
The Selembao Construction Site – 2006
Construction commenced in
2004
A world Bank financed project for therehabilitation of the erosion gully in thedistrict of Selembao, Kinshasa, DRC
12/14/17 THEVETIVERNETWORKINTERNATIONAL 6
12/14/17 THEVETIVERNETWORKINTERNATIONAL 7
A total of 11.5 hectares was planted to Vetiver and thenhydroseeded using locally harvested and commercial seed.
Silted Drains – Cause of excessive surfacewater runoff down side slopes
Vetiver planted Green TerraMesh Walls
12/14/17 THEVETIVERNETWORKINTERNATIONAL 8
Excessive erosion of the drain in the primary catchment area as a result of under-designed collector drains silting up and displacing storm
water directly onto the unprotected side slopes
Sand Bags inter-planted with Vetiver were used to repair the extensive erosion caused by surface water runoff
12/14/17 THEVETIVERNETWORKINTERNATIONAL 9
Correct method
Incorrect method
Installation of Sand Bags
12/14/17 THEVETIVERNETWORKINTERNATIONAL 10
Sand Bag Reinforced & Stabilised Gully
12/14/17 THEVETIVERNETWORKINTERNATIONAL 11
80,000 Sand Bags were used forthe stabilisation of the erosiongullies. Vetiver grass was plantedinto the Sand Bags.
The project whereTVNI & Hydromulchformed a
established workingrelationshipDr. Paul Truong
Dr. Dale RachmelerEng Alain NdonaRoley Noffke
12/14/17 THEVETIVERNETWORKINTERNATIONAL 12
Sporadic Fires during the dry season
Recovered Green TerraMesh walls
12/14/17 THEVETIVERNETWORKINTERNATIONAL 13
Project No.2 - Boukeni Erosion Gully Project, Brazzaville, Congo
12/14/17 THEVETIVERNETWORKINTERNATIONAL 14
Construction is by a Brazilian Company-ANDRADE Gutierez SA.The consultant Engineers for the project -EGIS-INTERNATIONAL.
Environmental & Bio-Engineering design, supervision andimplementation - Engineer Alain NDONA (TVNI).
12/14/17 THEVETIVERNETWORKINTERNATIONAL 15
• • • • •
Length of gullies : ± 600 m¹Length of drains or canals : ± 800 m¹, 50-60 meters wide and 20-40 meter deepSurface area planted to Vetiver – ± 36,000 m² per channelPlanting density - 1 m between rows and 10 plants/m¹Vetiver sourced from local community
12/14/17 THEVETIVERNETWORKINTERNATIONAL 16
Implementation of the Vetiver System on side slopes of Canal Construction
12/14/17 THEVETIVERNETWORKINTERNATIONAL 17
Vegetated Side Slopes of Concrete Drainage Channel
Engineer Alain NDONA (TVNI)
12/14/17 THEVETIVERNETWORKINTERNATIONAL 18
Project No. 3 - The Pointe Noire to Brazzaville Highway, Congo
Total length of road: ± 600 kmPlanned to plant 120 million Vetiver, slips sourced
mainly fromCHINA .On site nursery constructed: 5ha .
12/14/17 THEVETIVERNETWORKINTERNATIONAL 19
Side Slope Rehabilitation in progress
45° slope angle with benching at 10 m intervals on average .
12/14/17 THEVETIVERNETWORKINTERNATIONAL 20
Highly dispersive and erodible side slope material
12/14/17 THEVETIVERNETWORKINTERNATIONAL
Construction by a Chinese company - China State Construction Engineering Corporation LTD (CSCEC).
The consultant Engineers for the project- EGIS-INTERNATIONAL.Environmental & Bio-Engineering design and supervision - Engineer
Alain NDONA.
1 m¹ between rows and 10 plants/m¹
12/14/17 THEVETIVERNETWORKINTERNATIONAL 22
Setting out & Planting of vetiver hedge rows
StableSideSlopeEstablishedwithVetiverSystem
12/14/17 THEVETIVERNETWORKINTERNATIONAL 23
Stable SideSlopeEstablishedwithVetiverSystem
Vetiver Planted to date: 50,000 m¹.
45° slope angle with benching at 10 m intervals on average .
12/14/17 THEVETIVERNETWORKINTERNATIONAL 24
Project No. 4 - The Rio Tinto Project- Simandou, Guinea
12/14/17 THEVETIVERNETWORKINTERNATIONAL 25
Rehabilitation of the highest point of Pic du Fon, Simandou, Guinea
12/14/17 THEVETIVERNETWORKINTERNATIONAL 26
InstallationofBio-EngineeringTechniques&HydroseedingonExplorationSiteforprotectionofchimpanzeehabitat
12/14/17 THEVETIVERNETWORKINTERNATIONAL 27
Established Vetiver & Hydroseeded Slope
12/14/17 THEVETIVERNETWORKINTERNATIONAL 28
On-Going Stabilisation work on Access Roads along the Montane area
12/14/17 THEVETIVERNETWORKINTERNATIONAL 29
Madagascar- Projects
Projects 7 A – Rio Tinto/QMM Ilmenite Mine
Projects 7 B – Sherritt Mining Ambatovy Pipeline
12/14/17 THEVETIVERNETWORKINTERNATIONAL 30
Local Malagasy Community–TheEmployees
12/14/17 THEVETIVERNETWORKINTERNATIONAL 31
Project No. 7 A - Ilmenite Project, Madagascar
Ehoala Dune Cut
New Harbour
Quarry
12/14/17 THEVETIVERNETWORKINTERNATIONAL 32
mine
Vetiver Sources• Vetiver plant material was sourced from surrounding areas withina 50 km radius
• No planting material was imported or introduced from outsideareas
12/14/17 THEVETIVERNETWORKINTERNATIONAL 33
Community Vetiver Propagation
12/14/17 THEVETIVERNETWORKINTERNATIONAL 34
• Environmental work Started in 2006 with 15 communities, expanded to 32
• communities by 2008.40 hectares were stabilized and re-vegetated.• 4,000,000 Vetiver plants were propagated & supplied by local
villagers.• Assisted in setting up Vetiver nurseries and provided the necessary
training• of the local communities.
12/14/17 THEVETIVERNETWORKINTERNATIONAL 35
Planting of Vetiver Grass Hedge Rows on the Ehoala Dune
12/14/17 THEVETIVERNETWORKINTERNATIONAL 36
Impact of Prevailing Winds - Primary Dune
Prevailing wind direction(In excess of 35 days withintense gusting up to45 knots at times)
Wind Damaged planted areas
Note -Vetiver root system
12/14/17 THEVETIVERNETWORKINTERNATIONAL 37
Surface Water Runoff control with Vetiver Hedge Rows
12/14/17 THEVETIVERNETWORKINTERNATIONAL 38
Established & Stable Ehoala Dune – 9 ha in extent
12/14/17 THEVETIVERNETWORKINTERNATIONAL 39
Project No. 7 B – Ambatovy Project, Moramanga to Tamatave, Madagascar
12/14/17 THEVETIVERNETWORKINTERNATIONAL 40
Installed Erosion Control Structures & Hydroseeding
12/14/17 THEVETIVERNETWORKINTERNATIONAL 41
Length of ROW: 220 KilometresArea rehabilitated – 550 hectaresRehabilitation period: 3 yearsVetiver plants & fascines sourcedfrom local communities
Progressive RehabilitationOfPipeline ROW (Right of Way)
12/14/17 THEVETIVERNETWORKINTERNATIONAL 42
Functional Erosion Control Structures & Established HydroSeeding
12/14/17 THEVETIVERNETWORKINTERNATIONAL 43
Rehabilitation of extremely difficult
rock sections through mountain terrain- ROW (Right of Way)
Accessible only via access roadsOften inaccessible for up to 2
months due to weather conditionsUnstable cut slopes rehabilitated byVetiver plants & fascines sourced
from local communities
12/14/17 THEVETIVERNETWORKINTERNATIONAL 44
Rehabilitated fill side slopes & stabilised shoulder break point
12/14/17 THEVETIVERNETWORKINTERNATIONAL 45