Minden High School ImprovementsFacility Design Program
Webster Parish School Board
Minden, Louisiana
mms
hm
ms
hMHSM Architects
8.09.04
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
1
8.9.04 mms
hm
ms
h
Introduction & Acknowledgements This program document will guide the design of new and renovated facilities improvements for Minden High School. Funding is the result of a January 2004 bond election for capital improvements and a 1/2 cent sales tax for capital improvements / maintenance approved by voters in the Minden School District of the Webster Parish School System. Information in this document is the result of input from the previous and current Webster Parish School Board; previous and current School Board Administration; Minden High School administration, faculty and staff; the Minden United School Improvement Committee (MUSIC) organized by the Board for the first bond election attempt; and the committee organized by the Board and South Webster Chamber of Commerce that recommended and promoted the successful election that will fund school improvements. At the direction of Superintendent Butch Williams, Project Manager Leonard Mack and Principal Morris Busby organized a series of faculty & staff meetings with MHSM Architects to discuss specific ideas and requirements for functional areas. Teacher and student surveys were conducted and several groups of faculty and central office staff traveled to other districts in Louisiana and Texas to learn and test ideas. Information from these meetings is reflected in the this document. Special thanks to the following for ideas and enthusiasm that provides the foundation for designing the high school learning environment for the future of Minden: • Judy Knowles and Susanne Jamison— Library / Media Center • Betty Fowler— Cafeteria • David Martin— Math Department • Bewanichi Harris and Scott Martin— Science Department • Lisa Dick and Sybil Beasley— Technology and Computer Labs • Jim Croad— Visual Arts • Beth Carrolton— English Department • Becky Bays— Severe and Profound Special Education Department • Scott Herrington— History / Social Studies Department • Cindy Madden, Grady Smith and Sandy Corley — Choir, Band, Drama and Auditorium • Karen Williams and Kerry Jones— Family and Consumer Sciences • Clair Fusel— Gifted Enrichment Special Education • Bron Smotheman— Foreign Language Department • Douglas Blow— Industrial Arts • David Myers — Physical Education and Sports Teams • Administrative staff • Maintenance staff
The following people and groups provided leadership in establishing the scope of improvements leading to the passage of the 2004 bond issue: • Webster Parish School Board • Superintendent Butch Williams
Retired Superintendent Richard Knowles
• WPSB Finance Director Fred Evans • Minden United School Improvement
Committee (MUSIC) chairs & members working through the 2002 bond election
• School Improvement Committee chairs
and members working through the 2004 bond election
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
2
8.9.04 mms
hm
ms
h
Project Goals & Overview
Operation
Existing Site & Building Context
Site Improvements, Analysis & Concepts
Area Summary
Program Spaces & Descriptions
Program Adjacency Diagrams & Concepts
Code Provisions
Space Description & Equipment Worksheets
Facility M.E.P. Systems
Product Information & Web Sites
Budget
Schedule
Summary
Index
3
4
5
18
25
26
51
68
72
82
86
88
89
90
Draft 3
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
3
8.9.04 mms
hm
ms
h
Goals & Overview Form: The Minden High School Project will revitalize or renew an existing campus in the historic heart of the Minden Community. The appropriate response to residential context around the campus is important. The renewed campus should place emphasis on the pedestrian experience by excluding cars from the center of the campus. The buildings should be of permanent construction that enhances the neighborhood and provides a source of pride for Minden. The project classifies as a “green building” due to the reuse of the existing campus. The energy savings of embodied energy due to reuse places the project in this category. The goal is to apply reasonable energy conversation measures to enhance the projects status as ‘green architecture”, “sustainable design” and “smart growth”. Function: The high school design should take advantage of existing facilities when practical. The campus has limited area for building construction on high land. Demolition of some facilities will be necessary to take better advantage of available land and to improve campus functional efficiency and safety. The connection of the east and west sides of the campus through the low elevation portion of the site should be an enjoyable pedestrian experience. The circulation thru the building should provide indoor and outdoor gathering places that are easily supervised and inviting for students. Portions of the campus will be used by the public for after school functions. These areas should be located to be welcoming to the public and allow for other areas of school buildings to be secured. Building design should provide flexibility, respond to innovation in teaching methodologies and accommodate technology. Economy: The needs established in this program exceed the budget established for this project. As the project advances through schematic design and design development priorities should be reevaluated to determine a final scope of work for the high school improvements. Long term operational savings and durability of construction materials should not be compromised in a manner that results in less than a quality project. Time: The project will require phasing of construction to allow the school to be operational during construction. Improvements should be accomplished in as few phases as possible. Initial discussions and concept sketches project two phases.
Minden, La.
Minden High School
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
4
8.9.04 mms
hm
ms
h
Operations & Management Classrooms should be flexible and allow for a variety of furniture configurations. Linda Shalaway has written book that includes the linked excerpt on Classroom Organization: The Physical Environment. “Warm, well-run classrooms begin with the room's physical layout — the arrangement of desks and working space, the attractiveness and appeal of bulletin boards, the storage of materials and supplies.”
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
5
8.9.04 mms
hm
ms
h
The existing school site is approximately 22.5 acres located 2 blocks north of Minden’s historic downtown main street and is surrounded by residential property. The residential neighborhood to the east of the property is mostly well maintained and contains many older quality homes that are important to the historic fabric of Minden. The public library is in a historic building located approximately 3 blocks to the east of Minden High School and has in recent years expanded. Other neighborhood areas around the campus are in need of improvement and / or replacement. Approximately 65% of the site is located in a flood plain that divides the site into high land areas that are approximately 20 to 30 feet above the low area. Slopes along the east and west hills range from 1’ vertical for 2’ horizontal to 1’ vertical for 6’ horizontal. Low areas of the campus are appropriately used for recreation (football, track and tennis) and provide a green space with great view potential for buildings located on higher ground. The higher ground on the east side of the campus is approximately 5.5 acres and the west side approximately 2.5 acres. Existing buildings total approximately 123,000 square feet for an average attendance of approximately 900 over the last few years. The east side of the campus includes a two story 1920’s building that replaced an earlier school structure to the east of its current location; a 1950’s two story classroom building with attached cafeteria, auditorium, band, choir and consumer / family sciences buildings; and a 1980’s library addition. The buildings are separated from the remainder of the campus by drives and parking. The configuration of buildings and parking result in awkward land use and areas of the site that are difficult to supervise. Improving land use efficiency is necessary to accommodate additional programmed facilities and will likely require demolition of some structures to improve functional and operational facility design. Also included on the east side are several metal buildings that house agriculture and technical programs. These programs should be located more integrally in the school complex and of more permanent construction. The current metal building structures detract from the campus and neighborhood as well as adding to the inefficiency of land use. Four houses adjacent west of these buildings are recommended for acquisition to add to the contiguous campus land. Located on the west side of the campus is a 1950’s two level gymnasium building that includes dressing rooms for all sports and functions as a field house for the football program. Also included in this facility is a small natatorium with a pool that is no longer suitable for use. This facility will continue in use and should be refurbished and renovated as funding permits. Connection to the east campus and to football / track fields should be investigated as part of the design process.
Site & Context
Minden High School
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
6
8.9.04 mms
hm
ms
h
Site & Context
Existing site: 22.5 Acres Building area: 130,000 s.f. Current students: 837 Current faculty: 100
Downtown Minden
Residential Neighborhoods surround the High school campus. There are a number of historic residences in good condition. Some of the property is in n e e d o f r e d e v e l o p m e n t improvements.
Land around the site is hilly and wooded with a variety of hardwoods and pines.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
7
8.9.04 mms
hm
ms
h
Site & Context
View looking north
View looking South toward downtown Minden
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
8
8.9.04 mms
hm
ms
h
Site & Context
North of the 1958 building
South side of the 1958 building
South side of the 1958 building showing the entry from Richardson Street
Looking South at the 1922 building to the right and the 1958 building to the left
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
9
8.9.04 mms
hm
ms
h
Site & Context
Drainage ditch under the home side of the football stadium. The 1938 gym and field house building and covered walkways are shown in the background.
Exterior of the swimming pool room of the 1938 building. The 1922 building is in the background.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
10
8.9.04 mms
hm
ms
h
Site & Context
1922 Building: 32,800 s.f. Shops on College Street
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
11
8.9.04 mms
hm
ms
h
Existing Buildings
1953 Bldg: 59,160 s.f. First floor: 43,360 s.f.
Second floor: 15,800 s.f.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
12
8.9.04 mms
hm
ms
h
Existing Buildings
1953 Bldg: 59,160 s.f. First floor: 43,360 s.f.
Second floor: 15,800 s.f.
Classrooms and corridors in the 1958 building
Places are needed to better display trophies and artwork
Classrooms are small and crowded. Furnishings are not conducive to reconfiguration for team projects
Corridors in the 1958 are narrow and dimly lighted. Lockers are a source of noise and security issues.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
13
8.9.04 mms
hm
ms
h
Existing Buildings
1953 Bldg: 59,160 s.f. First floor: 43,360 s.f.
Second floor: 15,800 s.f.
Toilets are in bad repair and many are not functional
Science labs are crowded. One of the labs could be renovated to
provide a total of 3 labs
Auditorium acoustics need improvement and stage areas need expanding. There is no control and mixing area.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
14
8.9.04 mms
hm
ms
h
Existing Buildings
1922 Building: 32,800 s.f.
Basement: 5,600 s.f. First floor: 16,400 s.f.
Second floor: 10,800 s.f.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
15
8.9.04 mms
hm
ms
h
Existing Buildings
1922 Building: 32,800 s.f.
Basement: 5,600 s.f. First floor: 16,400 s.f.
Second floor: 10,800 s.f.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
16
8.9.04 mms
hm
ms
h
Existing Buildings
1938 Building: 31,240 s.f. Ground floor: 17,340 s.f. Second floor: 13,900 s.f.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
17
8.9.04 mms
hm
ms
h
Existing Buildings
1938 Building: 31,240 s.f. Ground floor: 17,340 s.f. Second floor: 13,900 s.f.
The pool room is an opportunity to renovate as a multi-use space by flooring in the pool.
The gym building is in good condition. If budget allows
refurbishing this building and reconfiguring the downstairs could extend the functions of
this building.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
18
8.9.04 mms
hm
ms
h
Site Improvements Site improvements will include the following based on budget limitations and priorities for spending: • Removal of all shed and metal building structures that detract from the campus
environment and are in poor condition. Where possible consolidate the uses of these buildings into new structures to provide increased efficiency and reduced maintenance.
• New and improved parking lots on existing property. • Expanded parking on newly acquired property around the campus. • Landscape (including irrigation system) and site amenity improvements that provide
outdoor gathering places for students. Replace sidewalks and coverings that connect the east and west sides of the campus as current structures are in poor condition, stairs do not comply with current codes and sidewalks are in poor repair.
• Improvements to the hill to prevent erosion and improve ability to maintain. • Refurbish the existing football stadium to include the following:
• Clean and paint steel support structure and reinforce structure where rust is severe.
• Refurbish or rebuild the press box and provide HVAC. • Explore options to consolidate toilets and concessions for home and visitors
and for renovation or reuse of the area under the west side seating. • Consolidate yard equipment and track equipment in location that does not
detract from pedestrian use of the site. Consider as part of a new building that includes concession and toilets.
• Look at an alternate to install additional seating in the existing concession area at mid field of the home side.
• Look at potential improvements on both east and west side seating for code improvements, accessibility and enhancements to improve maintainability.
• Rework field and install new irrigation system. • Improve drainage ditch below west side grandstand to control erosion. If
funding is available install culvert to connect to culverts north and south of the open ditch. This improvement will expand use of the site. Look for additional funding sources for this improvement.
• Resurface existing track. The City of Minden will make improvements to the existing culvert under the track field to address sinkholes caused by the holes in the pipe. Repair or replace cracked concrete stepped seating area located on the hill east of the track.
• Separation of bus traffic and vehicular areas on site. Improvement should include covered walkways for bus loading. Concepts include one way traffic on the east side of the property.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
19
8.9.04 mms
hm
ms
h
Site Design Concepts The Minden High School site is unique in its topography and its location in the heart of Minden. Development of the site should take advantage of the natural features as an asset that distinguishes Minden High from other schools. Site design should also enhance the potential for reinvestment in the surrounding neighborhood as a strategy to improve campus security. Appearance and maintenance of the campus plays an important role in student and community pride in schools. A site that is organized and inviting will be more secure with minimal places to hide and easy to visually supervise. Emphasis within the campus on pedestrian preference with no drives or parking separating campus buildings enhances security and the academic environment. This design strategy improves security for students and discourages traffic that does not belong on campus. Fencing should be considered a last resort as the message to the community is “keep out” and to students that “you are locked in”. The idea of “community schools” is growing and site design considerations include the use of certain school facilities during non-school hours.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
20
8.9.04 mms
hm
ms
h
Site Design Concepts
300’
180,000 s.f. High School
Acquired land for parkingand recreation
Acquired land for recreationDowntown
Fairgrounds & baseball field
300’
180,000 s.f. High School
Acquired land for parkingand recreation
Acquired land for recreationDowntown
Fairgrounds & baseball field
100’
180,000 s.f. High SchoolCampus
football
100’
180,000 s.f. High SchoolCampus
football
Alternative Site development concepts included maintaining the 1922 building shell and building a new building inside the masonry walls. The additional costs of this option over new construction requires additional grant funding of approximately $1.2 million. Removing the 1922 building allows improved functional efficiencies shown on the previous page. Connecting the High school campus to open space to the north can provide future growth for recreation. The pedestrian linkage could extend to the Lowe Alternative School and to the fairgrounds where the high school baseball team currently practices and plays games
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
21
8.9.04 mms
hm
ms
h
Site Design Concept
College Street
Ric
hard
son
Stre
et
West Union Street
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
22
8.9.04 mms
hm
ms
h
Site Design Concepts
College Street
Ric
hard
son
Stre
et
West Union Street
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
23
8.9.04 mms
hm
ms
h
Site Analysis Existing 1938 Gym / Fieldhouse building (2) is a sound structure that can be better utilized with new planned gym and support. The area around this building can accommodate a more efficient parking lot design. Access to the stadium is is awkward. Explore possible options for improving access for home and visitor sides. The small wood frame buildings should be replaced and consolidated. Storage buildings conflict with public entry in the stadium and track. Consider alternatives for equipment storage. Lighting for the football field should be relocated behind the bleachers. Property on the East side of Richardson could be a location for parking. The WPSB is in the process of acquiring some of these parcels for potential use as parking. Care should be taken to buffer parking from adjoining residential properties. Connecting the east and west sides of the campus can be improved. Properly designed the connection will encourage more parking on the west side. Drives and parking through the site currently are obstacles to a more secure pedestrian campus. Building 3, constructed in 1958, is at elevation 244’. The top of the hill at elevation 230’ is the maximum area for new construction on the east side of the campus. Building 1, the 1922 construction , has been evaluated for possible reuse if grants add to the construction budget. Current structural evaluations recommend demolition. West Union Street connects the site to Main Street and establishes an axis that is a good location for a public entry to a new building. Land acquisition along College and McIntyre will improve campus development and provide suitable locations for parking to serve the campus. Metal buildings for industrial arts present a negative image for the campus and should be demolished. These programs should be better integrated into new building design.
summer winds
winter winds
W. Union
Richardson
Ash
McIntyre
College
2
1
3
Football Field
Track & Field
Tennis
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
24
8.9.04 mms
hm
ms
h
Site Analysis & Utilities
N
S
EW
June 22 sun path
December 22sun path
60°
120°
33º North LatitudeSun Path diagram
N
S
EW
June 22 sun path
December 22sun path
60°
120°
33º North LatitudeSun Path diagram
Richardson
Ash
McIntyre
College
2
1
3
Football Field
Track & Field
Tennis W
. Union
City storm water flows south through the low area of the campus. The low area is within the flood plain of the drainage creek. under the stadium an open ditch is unsightly and a hazard. Explore the possibility of a box culvert or other improvement that will improve site utilization. The drainage is in a box culvert under the remainder of the site, however it is in poor repair and has been the source of ink holes in the track field. Electric & telephone utilities are serviced overhead from the perimeter of the site and power appears to be available from all sides of the site. There are a number of utility poles scattered through the campus that add to the visual clutter that should be address in new and renovation construction.
summer winds
winter winds
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
25
8.9.04 mms
hm
ms
h
Department Net Area (s.f.) Department Efficiency (%)
Department Total (s.f.)
Connecting Efficiency (%)
Total Area (s.f.)
Administration 6,960 85 8,200
Classrooms 54,440 80 68,050
Media Center / Library 6,880 90 7,600
Cafeteria 9,420 95 10,000
Auditorium Improvements 11,650 90 12,900
New Gymnasium 28,190 90 31,300
Old Gym / Field House 26,190 94 28,000
Technical Arts 5,770 90 6,400
Janitor and Shop 1,250 90 1,400
Mechanical / Electrical 13,040
Stadium Concession & Storage 2,450 90 2,700
Totals 127,010 189,590 80 237,000
Program Summary
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
26
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
General Building Considerations 1. Buildings should be arranged to minimize vehicular traffic through the site to provide a more secure pedestrian oriented campus environment. 2. All subject classrooms are to accommodate 32 students and a teacher unless noted otherwise. 3. Consider appropriate places to display trophies, photos and student artwork. 4. The high school will be designed as a lockerless concept which requires 2 sets of textbooks. Space should be considered for the possibility of adding lockers
at some time in the future. 5. The campus will be designed as a wireless internet environment 6. Investigate school intercom system that incorporates phone intercom for classrooms. 2-way communication between classrooms. 7. See several manufacturers of school furniture: Adirondack and Demco 8. Secure display areas for art in school corridors and public areas.
Administrative 1. Administration offices should be in a central location and near bus loading.
Principal Office • Locate away from reception area– no direct access • Desk, credenza w/ lateral files, 3 side chairs &
approximately 36’ of book shelving • Computer, monitor, printer & telephone at credenza • Toilet adjacent to office (40 s.f.)
240
Assistant Offices • Locate near principal and reception • Desk, credenza, 2 side chairs & 18’ book shelving • Computer, monitor, printer and telephone
3 150 450
Counselor Offices • Desk, credenza, 2 side chairs & book shelving • Locate in the administrative suite
3 120 360
Conference Rooms • Seating for 10 around a conference table • One located adjacent to principal and one adjacent
to counselor offices • Marker board on one wall ( consider “smart board”
as an option
2 300 600
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
27
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Administration (continued) Receptionist & Waiting • Waiting for 8
• Access form main circulation. Glass wall and door for visibility
• Reception counter with work space for 3 student workers
500
Secretarial • Work station cubicles (8’x8’) in open office configuration • Can be part of the reception area behind the counter
2 100 200
Bookkeeper • Work station cubicle located at secretarial area
120
Administration Work / Supply Room
• Adjacent to secretarial and teacher work room • Allow 18’ of lateral files, counter space for sorting and
collating, postage metering, mail box rear feed to teacher work room, fax, copy equipment and office supply storage cabinet.
300
Records Vault • 24 lineal floor feet of lateral files for student records • 2 hour fire rating • Include a small built-in safe for cash • Access from Adm. work room
200
Teacher Work Room • Mail boxes; 3 copy machines with 6’ of counter adjacent to each; counter or table space for laminator, 5 computers, printers, binding machine and miscellaneous.
• Storage cabinets for forms and supplies • Locate adjacent to teacher lounge
800
Faculty Lounge • Tables, chairs and comfortable seating for approx. 40 • Provide white board on one wall • Two 20 s.f. rooms with counter, chair and phone. Door
with view glass. • Kitchen type cabinet with double sink, dishwasher, ice
maker, refrigerator & microwave • Area with water dispenser and 3 vending machines
800
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
28
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Administration (continued)
Staff Toilets • Locate adjacent to teacher lounge 2 200 400
Spare Offices • Space for future or temporary positions • Desk, credenza and 2 side chairs
2 120 240
Security Office • Monitors for security cameras • Locate near reception area and accessible to main corri-
dor system. • Desk, credenza with lateral files and 2 side chairs
200
Nurses office / clinic • Work area with desk and lateral file cabinet • Counter with lockable storage below and above • Under counter refrigerator and hand wash sink • Cubicle curtain area for 2 beds • Toilet
350
Book Storage Room • Metal shelving for textbook storage • Locate adjacent to teacher workroom for dispensing and
collecting books
800
General Storage • Miscellaneous storage includes 30 lineal feet of metal shelving and floor area for boxes, stacking chairs etc.
400
6,960 85 8,200 Totals for Administration
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
29
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms
1. All classrooms should be wired to accommodate an “ACTIVBoard”, “Smart Board” or similar product with software included. Boards utilize a computer and ceiling mounted LCD projector. Provide lockable cabinet storage for computer, hub and VCR/DVD.
2. Classroom furnishings should include flat desks (examples: Virco 21”x28” or 2 person desks 24”x48”) with separate chairs to allow classrooms to be rearranged for group project work.. Desk should allow for textbook storage as textbooks will remain in classes as part of the lockerless school concept. Explore flexible location options for teacher desks including casters for relocating when rooms reconfigured.
3. All classrooms should be designed to accommodate 32 students unless otherwise described. Flexible arrangement ro a variety of learning configurations (See Learning and Teaching: Physical Room Layout and The Impact of Technology on Learning Environments). Provide a lockable teacher storage cabinet unless otherwise described.
4. Provide adequate outlets on all walls of classrooms and plan for 5 computers in each classroom on moveable cart/desks or at fixed counter. 5. All classrooms should have wall mounted television (consider flat screen) or wired for projecting T.V. thru the LCD projector to the ACTIVBoard. 6. Whiteboard liquid marker boards will be in all classrooms . One 4’x4’ bulletin board will also be included unless noted otherwise.
Math Classrooms • No storage cabinets or teacher desks will be provided in math classrooms if storage / offices are included in the final design. Room sizes will be increased to 800 s.f. without these rooms.
• Door between 2 classrooms for team teaching • Would like semicircular seating arrangement • One ACTIVboard per classroom & minimum 4’x8’ marker
board three walls desired, 4’x4’ bulletin board
8 750 6,000
Math Storage / Offices • 2 teacher desks for adjoining classrooms • Open metal storage shelving for books, calculators and
resources to be shared by the 2 teachers. • Room should be lockable.
4 250 1,000
Science Demonstration Classrooms
• Direct access from each classroom to an adjoining lab • Teacher demo counter with sink , gas, water & electricity
(consider a demo mirror above counter) • ACTIVboard and marker board with bulletin board • T.V. with VCR/DVD and computer connection • Physical Science— all teachers • Physics & Chemistry— one teacher • Biology— three teachers • Environmental Science— one teacher
6 900 5,400
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
30
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Science Labs • Both new labs designed for chemistry & will be used for
chemistry, physics & biology (see lab safety & planning) • Refurbished existing lab used for physical science and
environmental science • Each student work station should accommodate 4
students (8 work stations—34” to 36” counter height); minimum 1 computer per 2 work stations with internet connection; gas, water, & electricity utilities
• Fume hood in each of the 2 new labs • Emergency eye wash & shower in each lab • One wall of work counter with storage below and upper
cabinets with glass doors (lockable)
2 new (refurbish existing
chem lab)
1,200 3,600
Lab Prep / Storage Rooms • Accessed from each lab • 8’ Work counter with sink (hot and cold water) • Dishwasher, Refrigerator • 2 mobile carts • Shelving and lockable cabinets including storage for A/V
resources • Lockable chemical storage cabinets for acids & bases
3 250 750
History & Social Studies Classrooms
• Prefer classrooms to be near square to allow for more flexible furniture reconfigurations for team projects
• Map display and storage or use ATIVBoard with LCD projector with map programs. (Provide rough-ins for future at a minimum)
• Room should provide space for a project table(s). • Explore shared storage options for department.
8 800 6,400
English Classrooms • Approximately the length of one wall for counter with book shelving below. Some lockable cabinet storage.
• Provide projector screen for overhead projection or ACTIVBoard with LCD projector.
• English & Grammar textbook (currently use lockerless)
8 800 6,400
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
31
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Foreign Language • French & Spanish
• Teaching includes table top games & performing plays / skits requiring floor space
• Flexible furniture arrangements • Lockable storage cabinet
2 800 1,600
Audio Lab • Similar to foreign language labs?????? 800
Computer Labs (May teach accounting in one lab)
• Locate in close proximity to library & access to public for evening classes. One lab teacher oriented & one for team projects (conference tables / chairs on casters.
• 30 computer work stations for students + one for teacher • New desk should have computer and monitor below desk
with glass view panel and glare shield at desk top. Key-board drawer stability is important.
• Liquid marker board, bulletin board, LCD projector in ceiling, projector screen and 27” T.V. (ACTIVBoard would consolidate some equipment needs)
2 1000 2,000
Multi-purpose office / storage / workroom / conference
• Locate between computer labs • Teacher work station • Copier, overhead projector, scanners, disk storage
drawers computer parts & textbook storage shelving • Small conference / work table for FBLA officer meetings
200
“Tech Team” Multipurpose Computer Lab
• Dual purpose lab for teaching computer repair / building and also function as a classroom
• Locate adjacent to Math department • Computer work stations around perimeter of room and
conference / work tables on lock casters in center
1,000
Computer Equipment Storage
• Access from Tech Team Lab • Work counter / I.T. work station and metal shelving • Computer server and wireless hub in lockable cabinet. • Location for mapping of I.T. cabling for school
200
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
32
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Gifted Enrichment Classrooms
• Itinerant teachers • 10 students & teacher work station (Virco desks and
chairs on casters); 5 computer stations with internet • Lockable built-in storage cabinets on one wall for files,
paints, workbooks, supplies, copper sheets, projectors, computer parts, speakers... Sink in counter for art pro-jects. (would like a photography lab if shared with art)
• Adjacent to office / conference / testing room
2 750 1,500
Gifted Enrichment Conference
• Accessed from G.E. classroom • 4 person conference room for IEP, conferences, pupil
appraisal and testing • Approximately 4’x4’ clear observation window to
adjacent classroom
2 120 240
Shared Storage for Gifted Enrichment
• Locate between G.E. Rooms with access from both rooms
100
Speech Classroom • Locate near special education cluster • 5 students & teacher work station • Lockable storage cabinets on one wall
750
Special Education Classrooms
• ???? 6 750 4,500
Severe & Profound Special Education
• Sound isolated classroom located near cafeteria • 4 teacher desks (5 total staff) • 42” wide doors to classroom & support rooms • Handicap accessible kitchenette unit with sink, stove/
oven, refrigerator, microwave and blender. • Coat hanging area • 4 computers distributed around room (not clustered) • Project work tables on lock casters ( different shapes that
are handicap accessible. • Lots of display board area (more important than marker)
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
33
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Severe & Profound Special Education (continued)
• Open storage slots / shelving for student tools and materials.
• Work Room / Storage Room (200 s.f.) for mats, O.T. equipment, 4 lateral files, stands, copy machine & shredder
• Large handicap accessible bathroom (100 s.f.) — table/bench, wall mounted sprayer hose next to water closet, accessible shower, lavatory and supply cabinet
• Second standard toilet that includes a urinal (70 s.f.)
1,250
Visual Arts Studio / Lab • Painting, drawing, photography, computer animation & ceramics—prefer a studio room that is square.
• 2 Lockable storage closets: one for material storage and one for student projects (150 s.f. per closet = 300 s.f.)
• Work counter around perimeter of studio. Sink in counter accessible to students.
• 5 computers work stations • Moveable furniture (seating, easels & tables) • Kiln room (100 s.f.) • Dark room for film processing (100 s.f.) • Secure display areas for art in school corridors and public
areas
1,600
Family & Consumer Sciences Food Lab (renovate & expand at ex-isting location)
• Teacher office or work station (120 s.f.) • 8 kitchen areas (85 s.f. ea.) for groups of 4 students
each. Counter space with double sink, slide-in or drop-in range/ oven, drawers for storage, upper cabinets at walls only. High or no windows—wall space more important
• Demonstration table (approx. 8’ x 3’) with sink • Work counter for 8 computers & printers • Wall space for display and marker board • Food pantry (150 s.f.): 4 refrigerators, 2 freezers, metal
storage shelving for food, small appliances, equipment & cleaning supplies.
1,500
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
34
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Family & Consumer Sciences Clothing Lab (renovate & expand at existing location)
• 3 classes with 32 students per class • 32 portable sewing machines with tables & chairs with
casters (approximately 880 s.f. including cutting tables) • 16 cutting tables on lock casters (locate table adjacent to
each 2 sewing tables— approximately 2’x 4’x 3’H) • 2’ deep storage cabinets on one wall with 100 drawers
behind lockable doors (size for student clothing projects, fabric, textbook, notebook etc.) Cabinets should also provide additional lockable shelving and possibly 2 wall mounted ironing boards
• Counter space for 5 computers • Day lighting is important for class work • Dressing room (30 s.f.) & fitting area with angled fitting
mirror (60 s.f.) • Storage for books, supplies, copy machine, ironing
boards— shared with food lab. Closet for finish garments and fabric (150 s.f.)
• Teacher work room shared with food lab (160 s.f.) • Washer & dryer shared with food lab (80 s.f.)
1,600
Family & Consumer Sciences Classroom
• Shared 32 person classroom for clothing and food labs • Classes will include housing & adult responsibilities • Moveable desks and chairs with casters • Marker board, bulletin board, LCD projector in ceiling and
projector screen or ACTIVBoard • 5 computer stations • Locate with direct access from both FCS labs
750
Choir Rehearsal Suite (renovate and expand existing)
• Rehearsal room with curved risers for up to 30 students (provide appropriate seating for music & equip with swing arm table if available to allow for use as a lecture class for fine arts music)
• Provide good acoustics and sound isolation • One marker board scored for music and one plain
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
35
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Choir Rehearsal Suite (continued)
• Provide adequate electric outlets to allow for 5 electric keyboards, 3 computers, midi & recording equipment
• Floor space for a grand piano • Rehearsal room should allow for photo & memorabilia
display on walls • Racks or slots for dispensing student folders (existing
rack is approximately 7’ long with angled shelving) • Music storage room (currently 1100 boxes of sheet
music) - consider high density filing system (Spacesaver) to conserve space & provide for future additions (250 s.f.)
• Robe Storage closet (100 s.f.) • General storage for 5 portable risers, carts &
miscellaneous equipment (150 s.f.) • Office with window to rehearsal room— desk, chair,
credenza with lateral files & side chair (120 s.f.) • Two soundproof modular rehearsal rooms for up to 10
people each located for sharing with band (Wenger provides rehearsal rooms, seating, risers & instrument storage units) (120 s.f. each = 240 s.f.)
2,100
Band Suite • 98 students in band in flat floor rehearsal room (2100 s.f.) • Room should be live acoustically and sound isolated from
other areas. • Provide display for trophies and photos • Counter with sink for washing mouthpieces. Locate in or
adjacent to rehearsal room • Instrument storage room (300 s.f.) • Uniform storage– hanging and shelves (180 s.f.) • Music storage— 30 lineal floor feet of shelving plus work
counter for organizing (180 s.f.) • Miscellaneous Storage including color guard equipment &
flags (100 s.f.) •
3,200
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
36
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Classrooms (continued) Band Suite (continued) • Office with window to rehearsal room— desk, chair,
credenza with lateral files & side chair (120 s.f.)
Totals for Classrooms and Departments 54,440 80% 68,050
Media Center / Library 1. Glass entry, day lighting, higher ceiling height and light colors are important features that will make the library more inviting and encourage use. High
windows and skylights are desirable to utilize more wall space. Consider ceiling height changes to enhance the learning environment. 2. The entry, control desk and office should have good visibility of the library reading areas, stacks and other areas. Consider elevating these areas with ramp
& steps to below. 3. The media center should encourage arts and literature competition. Provide areas to display art. 4. Design the library for 2 staff and 3 student workers. One entry is preferred to better control traffic in and out of the library 5. Media Center / Library should be easily accessible from classrooms, commons areas and by the public after school hours. 6. Books will have metal identification strips with a detector at the entry door to alert librarian when books are leaving that have not been properly checked out. 7. The library currently has 16,000 volumes (approximately 2,700 feet of shelving). New library should accommodate approximately 20,000 volumes
(approximately 3,200 feet of shelving). New shelving should be planned for 5 shelves high to provide better visibility of stack areas.
Circulation / Control Desk • Locate at entry with visibility to entire library • Book drop slot on the entry side of the desk— carpet
lined drawer accessed from the desk side (see photo) • 2 work spaces with below counter monitors & keyboard
drawers • Below counter storage for printers, computers, drawers
and carts.
120
Reading Area • Seating for 60 people: Informal seating for 30 including some seating on the floor or at listening stations (casual learning environment); and seating at tables for 30
• Computer tables to accommodate 20 computers with above counter flat screen monitors for easy supervision by staff (provide patch panels for computers)
1,400
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
37
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Media Center / Library (continued) Reading Area (continued)
• Powered projector screen switched from control desk • Listening center should include a variety of seating.
Include some benches with storage and plug-ins for head phones. Provide display area for art
Stack Areas • Organize stacks into fiction and non-fiction with separate area for reference shelving. Design for 5 shelves of height to improve visibility.
• Periodical shelving located close to circulation desk and reading area. Consider system with storage shelving behind hinged angled shelving for magazines.
• Fiction — 9,000 volumes? Approximately 1,500 feet shelving or 300 lineal floor feet
• Non-fiction — 9,000 volumes? Approximately 1,500 feet shelving or 300 lineal floor feet
• Reference — 2,000 volumes? Approximately 300 feet shelving or 60 lineal floor feet
• Periodical display shelving — 100 feet shelving? Approximately 20 lineal floor feet
• Compressed video shelving—20 floor feet shelving? Locate near circulation desk
2,400
Conference / Project Rooms
• Accessed from reading area and visible from circulation desk. Glass wall and door to reading room side.
• Conference table for 4 and computer work station on wall
2 120 240
Librarian Office / Work Room
• 2 librarian work stations cubicles and 2 student work areas at a tables
• 30’ work counter with sink and counter height outlets, storage above & below counter (space for microwave & under counter refrigerator.
• Four lateral files with pull out shelves and flip doors • Glass wall with visibility to reading and stacks and access
to circulation desk
400
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
38
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Media Center / Library (continued) Equipment Storage • Lockable room access from circulation desk or work room
• Storage for televisions, carts, projectors and other equipment used in classrooms.
120
Book Storage • Storage for books and periodicals • 160 lineal floor feet of high density storage shelving
system. Work counter on one wall
500
Teacher Resource / AV Room
• Shelving for teacher reference materials (20 lineal floor feet?)
• Work table and 2 computer stations • Marker board on one wall
250
Computer lab • 30 computer lab (refer to classroom section of program for description of 2 lab suite)
• Should be located in close proximity to library and accessible for after hour instruction to community.
Refer to classroom section for
area
Lecture Room • Small auditorium space for 80 to 100 people • Location for distance learning • Swing tablet arm fixed seating or tables with attached
seats • Consider stepped floor • Locate with access from library and by public for after
hours use
1,000
Computer Network Room • Location for equipment, hub and I.T. work station. Alternate location could be in administration
250
6,880 90% 7,600 Totals for Media Center / Library
Media Production & Broadcast Room
• Soundproof room for television and radio production similar to a Wenger modular room
400
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
39
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Cafeteria
1. Dining tables should provide a variety of indoor and outdoor seating options (round tables with moveable chairs and rectangular with attached seating, see VIRCO and KI ) .
2. The New Design Handbook for School Food Service includes checklists and design standards for school kitchen and cafeterias. Additional information is available from the National Food Service Management Institute.
3. Kitchen separated from dining area with pass thru refrigerators and warmers to serving areas. 4. Current Dining area is approximately 2,400 s.f. with seating for approximately 200 and is supplemented with outdoor dining and serving. The current kitchen
is approximately 1700 s.f. including support areas. The total existing cafeteria is approximately 5,300 s.f. serving approximately 800. 5. The new cafeteria is planned to serve 1,000. Concepts explored should include a food court scenario and a traditional food line. Both concepts should
incorporate a prepackaged line, 2 hot meal lines and a serving window for outdoor dining. 4 cashier stations with each concept. Serving time is based on an average of 8 people per minute per line requiring 32 minutes to serve 1,000 people. Dining areas can be anticipated to turn over 2.5 times during the lunch period with interior seating capacity of 350 and exterior seating capacity of 60.
6. Noise control should be considered in placement of kitchen and dining and in material selections to absorb sound. Consider a background music system to mask sound and chairs with glides that minimize noise from sliding chairs.
7. Finishes should be durable and easy to clean. Quarry tile is not preferred. Terrazzo is first preference followed by sealed and waxed concrete flooring.
Receiving & Waste Disposal
• Covered loading dock with 3’-6” dock height and face attached leveler (200 s.f.). Loading dock can also serve gymnasium. Accommodate 2 trucks and a trash dumpster.
• Storage room for carts, hand trucks etc. (100 s.f.) • Can wash area with water and floor sink (100 s.f.) • Receiving vestibule with 4’x8’ locked door or double
doors from dock (doorbell &/or electric lock). Check in received supplies (100 s.f.)
500
Toilets & Lockers • Locate off receiving entry. Men and women handicap accessible toilets (40 s.f. each).
• Locker vestibule for 28 (120 s.f.)
200
Manager Office • View window(s) to food prep and receiving • Desk, chair, credenza, side chair, lateral file, phone &
computer
120
Janitor & Cleaning Storage • Soap & cleaning chemical storage convenient to pot & dishwashing. Locate away from food storage and prep.
• Mop sink and storage shelving
100
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
40
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Cafeteria (continued) Dry Storage • Dry food and paper goods storage accessible from
receiving without crossing food prep. Visible from office. Consider view window into storage.
• Locate adjacent to food prep, cooler & freezer • 18” deep metal shelving. Allow some floor space for
pallets. Aisles should be 48”.
500
Refrigerated Storage • Modular cooler (200 s.f.) existing 8’x16’ could be used • Modular Freezer (200 s.f.) existing 8’x16’ could be used • Adjacent to dry storage and food prep
400
Preparation & Cooking Area
• Room proportion of approximately 3:2 is desirable • 54” aisles are desirable, 48” minimum • Work areas: salads, cooking & bakery • Equipment that could be reused includes: tilting skillet,
fryer with built-in filter (approx. 6’wx3’6”d’ floor area), 2 4’x6’ stainless work tables and an 80 quart mixer.
• New equipment will include pass thru refrigerators and warmers, tilting kettle, ovens, etc. (equipment lists and data sheets will be provided by WPSB staff)
1,000
Dish / tray washing & Pot / Pan washing
• Pot & pan wash should be out of prep & cooking area but convenient to both. Locate in dishwashing area. Locate convenient to serving area. Stainless 3 compartment sink with side areas for soiled and clean with room for portable racks.
• Dish & tray washing equipment will determine exact size of room. Provide space for dish / flatware / tray cart storage. Locate near serving and adjacent to tray return.
• Tray / dish return should be directly adjacent to dining ,out of the dining room and away from serving line traffic (100 s.f.).
250
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
41
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Cafeteria (continued) Holding and Serving • Staging space in food prep area
• Pass thru refrigerators and warmers • Serving line equipment for 3 lines: packaged and 2 hot
meal lines
500
Food Court or Serving Line • Area for cueing lines for serving • 3 cashiers with internet access • Minimize lines in dining room and cross traffic from
entering & check out.
700
Outdoor Serving Window • Serving line with window or glass panel garage door to outside.
• Locate with access to food prep and pot / pan wash • Cashier at end of line
200
Dining Room • Seating for 350 at 14 s.f. / seat • Variety of seating to include round and rectangular tables
and fixed and moveable chairs. • Views to campus & connected to outdoor dining • Dining could function as a commons area
4,500
Outdoor Covered Dining • Covered outdoor tables and seating for 60 • Consider ceiling fans to extend use.
1,000
General Storage • Table and chair storage to allow for optional uses of dining room
200
9,420 95% 10,000 Totals for Cafeteria
Vending • Locate near serving area and accessible from corridor • Allow for 8 vending machines
150
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
42
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Renovated Auditorium / Theatre
1. The current auditorium seating area is approximately 6,000 s.f. seating approximately 850. The seating will be reduced to 600 to provide space for a control platform at the rear of the auditorium and area at the front of the auditorium to allow for increasing the stage area by projecting into the current seating area.
2. The current auditorium acoustics are inadequate. Removing the ceiling and exposing structure will allow more volume to support acoustic improvements 3. New sound system with communication between control platform and stage wings. New stage lighting, controls and curtains
Auditorium Seating • Reduce seating to 600 • Install new seating with improved sight lines and compare
continental seating to conventional. • Renovate space, improve acoustics and modify entry
5,400
Control Platform • Locate in the rear of the auditorium with stairs to platform level. Consider access form second floor of existing classroom building
• Counter for mixing and lighting board. Space for 2 spot lights.
200
Auditorium Entry foyer • Transition space between lobby and auditorium 200
Lobby • Shared lobby for other school functions • Area for art and trophy display
1,000
Concession and Ticketing • Serving counter with overhead coiling aluminum door • Work counter with sink and floor space for vendor
equipment, coolers and drink / food storage • Ticket booth can be part of concession or a separate
room (50 s.f,)
250
Lobby Toilets • Men & Women toilets that serve auditorium and other school functions. Screened entries without doors (
350 700
Stage • Remove existing dressing rooms to increase stage and wings to approximately 1,600 s.f.
• Expand stage in front of proscenium into audience area approximately 12’ to add approximately 500 s.f.
• Add wing loading foyer with overhead door access
2,300
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
43
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Renovated Auditorium / Theatre (continued) Stage / Wing Storage • Access to stage wing. Air conditioned Storage
• Scene and prop storage • Hanging area for costume storage • Access to corridor serving band and choir as additional
support area for stage productions
950
Dressing Rooms • Locate off corridor outside of stage • Provide counter with mirror above and 10 stack chairs • Sink in counter • Clothes and costume hanging rod and shelf • Handicap toilet (40 s.f.)
2 250 500
Green Room • Informal seating with counter, sink, under counter refrigerator
150
Totals for Auditorium / Theatre 11,650 90% 12,900
New Gymnasium 1. A new gymnasium will provide seating for 1,500 (750 in fixed seating above the gym floor and 750 in bleachers accessed from the gym floor level).
Motorized retractable bleachers if budget permits> 2. The existing gm building (approximately 28,000 s.f.) will be renovated and refurbished as budget allows. 3. Two full scoreboards and all 6 goals motorized raising and lowering operation. Gym should be equipped with good sound system. 4. Ventilated athletic locker information is available from Republic or Cisco-Eagle 5. Locate so classroom toilets also serve as public toilets for lobby
Gymnasium Floor • Wood flooring, 4 side goals with glass backboards and motor hoist to raise to ceiling, 2 main goals should also include motor driven hoist
• Floor area large enough for retractable bleachers to not crowd court and player seating
• 2 full size side courts divided with a drop down curtain • Provide retractable stage at one end of the gym that
recesses into wall.
10,500
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
44
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
New Gymnasium (continued) Fixed seating
• Seating above gym floor on both sides for a total of approximately 750
• Access from the second floor of the new classroom building.
5,200
Girls Physical Education and Visitors dressing & Locker Room
• 450 gym clothes lockers (approximately 18”x18”x12”D) (750 s.f.)
• 40 clothes hanging lockers (approximately 18”Wx36”H) distributed with small lockers (200 s.f.)
• Toilet area with 5 water closets & 5 lavs. (200 s.f.) • 10 shower stalls (220 s.f.) & drying area (120 s.f.)
1,520
Laundry Room • One commercial washer and one dryer (120 s.f.) • Space for carts/ laundry baskets • Storage room with shelves for towels, hanging for
uniforms and shelving for detergent etc. (100 s.f.)
220
Boys Varsity Dressing & Locker Room
• 30 full height lockers in dressing area (500 s.f.) • Toilet area with 2 water closets, 2 urinals and 2 lavatories
(150 s.f.) • Gang shower with 6 heads (150 s.f.)
800
Girls Varsity Dressing & Locker Room
• 30 full height lockers in dressing area (500 s.f.) • Toilet area with 3 water closets and 3 lavatories (150 s.f.) • 5 Shower stalls (150 s.f.) • Drying area (100 s.f.)
800
Boys Physical Education and Visitors dressing & Locker Room
• 450 gym clothes lockers (approximately 18”x18”x12”D) (750 s.f.)
• 40 clothes hanging lockers (approximately 18”Wx36”H) distributed with small lockers (200s.f.)
• Toilet area with 2 water closets, 4 urinals & 3 lavs. (230 s.f.)
• Gang shower with 10 heads (220 s.f.) & drying (120 s.f.)
1,520
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
45
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
New Gymnasium (continued)
Equipment Storage • Basketball, volleyball and softball equipment storage • 15 lineal floor feet of metal shelving and floor space • Separate storage for boys and girls
2 200 400
Uniform Storage • Separate rooms for boys and girls • Hanging rods on one wall and shelving on one wall
2 150 300
General Storage • Chair storage and miscellaneous for assemblies • Accessible from loading dock
600
Coaches Offices • 2 offices for girls coaches and 2 for boys coaches • Each office should accommodate 2 people • Computer, desk, chair, lateral file/ credenza & phone at
each work station • 2 Toilets with shower and dressing area with full size
lockers (120 s.f. each = 240 s.f.)
4 160 880
Training Rooms • 2 tables for taping & stretching • Lockable cabinet for supplies • Sink • Space for 2 small therapy whirlpools
2 250 500
Training / Workout Room • Resistance / weight machines and other workout equipment (weight room to remain in old gym)
• Mirrors on one wall • Accessible to boys & girls
900
Multipurpose Room • Possible use for dance, as a classroom, wrestling or use • Mirror on one wall • Wood flooring
1,200
Lobby & Concession • Concession area with sinks & storage (250 s.f.) 1,250
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
46
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
New Gymnasium (continued) Film / Meeting Room • Classroom furnishings for 32
• Storage room for game films (100 s.f.) • Outlets and location for projector • Marker board
850
Health Classroom • Classroom furnishings for 32 • Marker board & storage cabinets
750
Totals for New Gymnasium 28,190 90% 31,300
Old Gym / Field House Refurbishment / Renovation (Approx. 28,000 s.f. 2 story building) 1. Install HVAC if budget permits, Improve ventilation at minimum. 2. Repair or replace roofing.
Gym • Install new lighting • Repair ceiling panels and repaint
7,700
Dressing Rooms at Gym Level
• Refurbish dressing rooms and toilets for use by cheerleaders and dance line
• These dressing rooms can also be used when old & new gym are used for tournaments.
2 800 1,600
Lobby & Concession / Multipurpose Room
• Refurbish to utilize lobby as a multipurpose room on a daily basis and as a lobby when used for tournaments.
• Renovate toilets and modify some space for general storage for chairs and desks / tables
2,000
Ground Level Multipurpose Room
• Renovate natatorium as a multipurpose room for use by dance line, ROTC, cheerleaders & pep squad
• Infill pool or construct floor and use as basement storage. •
3,200
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
47
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Old Gym / Field House Refurbishment / Renovation (continued) General Storage • Identify space for 3 general storage rooms to be used by
cheerleaders, pep squad and ROTC 3 150 450
ROTC Offices • Desk, chair, lateral files / credenza and 2 side chairs 2 120 240
Locker Rooms & Showers • Renovate & Refurbish all dressing areas to include training room and storage to accommodate Minden and visitors football teams. Visitors locker / dressing should have multipurpose use (track and / or baseball)
6,500
Weight Room / Classroom • Existing room has been recently refurbished. Explore possibility of subdividing room to separate classroom.
3,500
Totals for New Gymnasium 26,190 94% 28,000
CAD Lab • 20 CAD stations with small drawing tables • Marker board
800
Teacher Office • Desk, chair, lateral file / credenza 2 side chairs & book shelving.
• Toilet with shower (50 s.f.)
170
Classroom • 800
Technical Arts 1. Maximum of 15 students per class 2.
Coaches Offices & Dressing
• Renovate and / or refurbish 1,000
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
48
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Technical Arts (continued) Woodworking Shop • Include a dust collection system
• Utilize reel outlets for equipment • Equipment data sheets to be provided by WPSB • Include sink and eye wash • Locate with access from inside school and from exterior
with overhead door and egress door
1,200
Greenhouse • Locate adjacent to Ag Lab with exterior access 1,200
Ag Lab • Welding will be taught in this lab • Include sink and eye wash • Locate with access from inside school and from exterior
with overhead door and egress door
1,000
Storage • Supply storage for Technical Arts 600
Totals for Technical Arts 5,770 90% 6,400
Janitorial and Shop 1. Currently 5 janitors maintain buildings and grounds.
Supply Storage • Shelving for toilet paper, wax, paper towels, buffers and other cleaning supplies. Locate near loading lock
300
Shop • Work counter and space for repairs 150
Yard Maintenance Storage • Lawn mowers, trimmers, gasoline etc • Could be located with equipment for track and field
maintenance
500
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
49
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Janitorial and Shop (continued) Janitor closets • Locate a janitor closet at each public toilet location 5 60 300
Totals for Janitorial and Shop 1,250 90% 1,400
Stadium Concession & Storage Building
1. Concession building could be located to serve both visitors and home sides of the football stadium or separate facilities on both sides. 2. Many of the existing wood frame structures around the stadium should be demolished and replaced with fewer, better located buildings. 3. This building should provide track storage and possibly mowing equipment and other yard equipment unless located at Janitorial & Shop.
Concession Serving • Approximately 20’ of serving counter • Work counter with hand wash sink • Location for ice machine • Provide for vendor equipment, drink containers, coolers...
250
Concession Storage • 100
Public Toilets • Design for entries that do not require doors. Provide gates or doors to secure toilets when not needed.
• Toilets to accommodate approximately 3,000
2 650 1,300
Track Storage • Storage for hurdles, high jump, pole vault and other related track equipment
500
Yard Equipment Storage • Mowers and yard equipment, This storage could be located as part of the main building or in the basement of the existing gym building.
300
2,450 90% 2,700 Totals for Stadium Concession & Storage Building
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
50
8.9.04 mms
hm
ms
h
Space Space Description Quantity Area / Space (s.f.)
Net Area (s.f.)
Efficiency (%)
Total Area (s.f.)
Mechanical / Electrical Spaces 1.
Mechanical Equipment • Allow 7% of sum of total department area • 173,560 s.f. x .07 = 12,170
12,170
Electrical and Communications
• Allow .5% of sum of total department area • 173,560 s.f. x .005 = 870
870
•
Mechanical / Electrical Spaces 13,040
Program Spaces
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
51
8.9.04 mms
hm
ms
h
Program Diagrams
Reception&
Waiting
Reception&
Waiting Secretarial&
Bookkeeping
Secretarial&
Bookkeeping
Work&
Supply
Work&
SupplyRecords
VaultRecords
Vault
ConferenceConference PrincipalPrincipal Assist.Office
Assist.Office
Assist.Office
Assist.Office
Assist.Office
Assist.Office
GeneralStorage
GeneralStorage
SecurityOffice
SecurityOffice
Nurse Office & Clinic
Nurse Office & Clinic ConferenceConference
CounselOffice
CounselOffice
CounselOffice
CounselOffice
CounselOffice
CounselOffice OfficeOffice OfficeOffice
Public Entry Staff Access
Book StorageBook StorageTeacher
Work RoomTeacher
Work Room
FacultyLounge
FacultyLounge
StaffToiletStaffToilet
StaffToiletStaffToilet
Administration
Public Corridor
Reception&
Waiting
Reception&
Waiting Secretarial&
Bookkeeping
Secretarial&
Bookkeeping
Work&
Supply
Work&
SupplyRecords
VaultRecords
Vault
ConferenceConference PrincipalPrincipal Assist.Office
Assist.Office
Assist.Office
Assist.Office
Assist.Office
Assist.Office
GeneralStorage
GeneralStorage
SecurityOffice
SecurityOffice
Nurse Office & Clinic
Nurse Office & Clinic ConferenceConference
CounselOffice
CounselOffice
CounselOffice
CounselOffice
CounselOffice
CounselOffice OfficeOffice OfficeOffice
Public Entry Staff Access
Book StorageBook StorageTeacher
Work RoomTeacher
Work Room
FacultyLounge
FacultyLounge
StaffToiletStaffToilet
StaffToiletStaffToilet
Administration
Public CorridorPublic Corridor
Administration can be located in the renovated existing classroom building. These office areas can take advantage of the shorter spans in the existing building that are no longer workable for most classrooms.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
52
8.9.04 mms
hm
ms
h
Program Diagrams
ConferenceConference
Reception&
Waiting
Reception&
Waiting
Secretarial&
Bookkeeping
Secretarial&
Bookkeeping
Work&
Supply
Work&
SupplyRecords
VaultRecords
Vault
PrincipalPrincipal Assist.Office
Assist.Office
GeneralStorage
GeneralStorage
CounselOffice
CounselOffice OfficeOffice OfficeOffice
Public Entry
Book StorageBook StorageTeacher
Work RoomTeacher
Work RoomFacultyLoungeFacultyLounge
StaffToiletStaffToilet
StaffToiletStaffToilet
Public CorridorPublic Corridor
CounselOffice
CounselOffice
CounselOffice
CounselOffice Assist.
OfficeAssist.Office
Assist.Office
Assist.Office
Tlt.Tlt. Sto.Sto.
Nurse Office
& Clinic
Nurse Office
& Clinic
Tlt.Tlt. Tlt.Tlt. ConferenceConferenceSecretarial
& Counselor Reception
Secretarial& Counselor
Reception
DetentionClassroomDetentionClassroom
SecurityOffice
SecurityOffice
windows in offices
Administration can be located in the renovated existing classroom building. These office areas can take advantage of the shorter spans in the existing building that are no longer workable for most classrooms.
Blue areas are program spaces added after review and are not accounted in the program summary.
Administration
The above alternate diagram was included after high school administration review of the initial space diagram on the previous page. Areas will be adjusted in the listing of spaces during schematic design.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
53
8.9.04 mms
hm
ms
h
Program Diagrams
Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom
Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom
Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom
Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom
Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath Classroom
MathStorage
&Office
MathStorage
&Office
Math ClassroomMath Classroom
Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom Math ClassroomMath ClassroomMath
Storage&
Office
MathStorage
&Office
Math ClassroomMath Classroom
Computer LabComputer Lab
Office /Stor. /Work /Conf.
Office /Stor. /Work /Conf.
Computer LabComputer Lab
Comp.Equip.Stor.
Comp.Equip.Stor.
Tech TeamMulti-purposeComputer Lab
Tech TeamMulti-purposeComputer Lab
Computer LabComputer Lab
Office /Stor. /Work /Conf.
Office /Stor. /Work /Conf.
Computer LabComputer Lab
Comp.Equip.Stor.
Comp.Equip.Stor.
Tech TeamMulti-purposeComputer Lab
Tech TeamMulti-purposeComputer Lab
CorridorCorridorMath Department
Computer Labs & I.T. Department
Computer labs should be located adjacent or near the library and accessible to public after hours. Tech Team Lab should be located adjacent or near the math department.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
54
8.9.04 mms
hm
ms
h
Program Diagrams
ScienceDemonstration
Classroom
ScienceDemonstration
ClassroomScience
Lab
ScienceLab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
Corridor
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceLabScience
Lab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
ClassroomScience
Lab
ScienceLab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
CorridorCorridor
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceLabScience
Lab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
ClassroomScience
Lab
ScienceLab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
Corridor
ScienceDemonstration
Classroom
ScienceDemonstration
ClassroomScience
Lab
ScienceLab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
ScienceDemonstration
ClassroomScience
Lab
ScienceLab
LabPrep
& Stor.
LabPrep
& Stor.
ScienceDemonstration
Classroom
ScienceDemonstration
Classroom
CorridorCorridor
Science Department
Two labs and adjoining classes will be in a new classroom building. One lab and adjoining classes shown below will be in the renovated existing classroom building.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
55
8.9.04 mms
hm
ms
h
Program Diagrams
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
Corridor
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
History&
Social StudiesClassroom
CorridorCorridor
History & Social Studies Department
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
56
8.9.04 mms
hm
ms
h
Program Diagrams
EnglishClassroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
Corridor
EnglishClassroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroom English
Classroom
EnglishClassroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
EnglishClassroomEnglish
Classroom
CorridorCorridor
English Department
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
57
8.9.04 mms
hm
ms
h
Program Diagrams
Foreign LanguageClassroom
Foreign LanguageClassroom
Foreign LanguageClassroom
Foreign LanguageClassroom
AudioLabAudio
Lab
Corridor
SpeechSpeech
Foreign LanguageClassroom
Foreign LanguageClassroom
Foreign LanguageClassroom
Foreign LanguageClassroom
AudioLabAudio
Lab
CorridorCorridor
SpeechSpeech
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
SpecialEducationClassroom
CorridorCorridor
Gifted EnrichmentGifted Enrichment Confer.Confer.
StorageStorage
Confer.Confer.
Gifted EnrichmentGifted EnrichmentGifted EnrichmentGifted Enrichment Confer.Confer.
StorageStorage
Confer.Confer.
Gifted EnrichmentGifted Enrichment
ToiletToilet
ToiletToilet
Severe & ProfoundSpecial Education
Severe & ProfoundSpecial Education
Work&
Stor.
Work&
Stor.
ToiletToilet
ToiletToilet
Severe & ProfoundSpecial Education
Severe & ProfoundSpecial Education
Work&
Stor.
Work&
Stor.
Foreign Language, Speech & Special Education Departments
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
58
8.9.04 mms
hm
ms
h
Program Diagrams
KilnRoomKiln
Room
DarkRoomDarkRoom
Visual Arts Studio / LabVisual Arts Studio / Lab
MaterialStorageMaterial
Storage
MaterialStorageMaterial
Storage
KilnRoomKiln
Room
DarkRoomDarkRoom
Visual Arts Studio / LabVisual Arts Studio / Lab
MaterialStorageMaterial
Storage
MaterialStorageMaterial
Storage
KilnRoomKiln
Room
DarkRoomDarkRoom
Visual Arts Studio / LabVisual Arts Studio / Lab
MaterialStorageMaterial
Storage
MaterialStorageMaterial
Storage
FCSClothing LabFCS
Clothing Lab
FitFit DressDress
Shared Work Rm.Shared
Work Rm.
FCSFood LabFCS
Food Lab
TeacherWork Sta.
Wash& Dry
Wash& Dry
SharedStor.
SharedStor.
FoodPantryFood
Pantry
FCSClassroomFCS
Classroom
FCSClothing LabFCS
Clothing Lab
FitFit DressDress
Shared Work Rm.Shared
Work Rm.
FCSFood LabFCS
Food Lab
TeacherWork Sta.
Wash& Dry
Wash& Dry
SharedStor.
SharedStor.
FoodPantryFood
Pantry
FCSClassroomFCS
Classroom
FCSClothing LabFCS
Clothing Lab
FitFit DressDress
Shared Work Rm.Shared
Work Rm.
FCSFood LabFCS
Food Lab
TeacherWork Sta.
Wash& Dry
Wash& Dry
SharedStor.
SharedStor.
FoodPantryFood
Pantry
FCSClassroomFCS
Classroom
Family & Consumer Sciences
Visual Arts
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
59
8.9.04 mms
hm
ms
h
Program Diagrams
OfficeOffice
RehearseRehearse
RehearseRehearse
Choir Rehearsal RoomChoir
Rehearsal Room
Rob Stor.Rob Stor.
MusicStor.
MusicStor.
StorageStorage
OfficeOffice
RehearseRehearse
RehearseRehearse
Choir Rehearsal RoomChoir
Rehearsal Room
Rob Stor.Rob Stor.
MusicStor.
MusicStor.
StorageStorage
Robe Sto.Robe Sto.MusicStor.
MusicStor.
RehearseRehearse
OfficeOffice
RehearseRehearseChoir Rehearsal RoomChoir
Rehearsal Room
StorageStorage
Robe Sto.Robe Sto.MusicStor.
MusicStor.
RehearseRehearse
OfficeOffice
RehearseRehearseChoir Rehearsal RoomChoir
Rehearsal Room
StorageStorage
Stor.Stor. OfficeOffice
MusicStorageMusic
Storage
UniformStorage
UniformStorage
InstrumentStorage
InstrumentStorage
Choir Rehearsal RoomChoir
Rehearsal Room
Stor.Stor. OfficeOffice
MusicStorageMusic
Storage
UniformStorage
UniformStorage
InstrumentStorage
InstrumentStorage
Choir Rehearsal RoomChoir
Rehearsal Room
Choir Rehearsal Suite Options Band Suite
Locate support spaces to aid in sound isolation. These improvements will likely involve renovation and addition to existing space.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
60
8.9.04 mms
hm
ms
h
Program Diagrams
Consider elevating the circulation desk and Librarian work areas and providing ramp to reading and stack areas.
Lecture AuditoriumLecture
AuditoriumMedia
Production & Broadcast
MediaProduction & Broadcast
Project&
Conf.
Project&
Conf.
Project&
Conf.
Project&
Conf.
TeacherResourceTeacher
Resource
ComputerNetworkRoom
ComputerNetworkRoom
Equip.Stor.
Equip.Stor.
LibrarianOffice
&Work
LibrarianOffice
&Work
Reading&
StackAreas
Reading&
StackAreas
Book StorageBook Storage
CirculationDesk
Computer LabComputer Lab
Office / Stor. /Work / Conf.
Office / Stor. /Work / Conf.
Computer LabComputer Lab
Day lighting with north facing windows,consider secure outdoor reading area
Cor
ridor
Cor
ridor
Lecture AuditoriumLecture
AuditoriumMedia
Production & Broadcast
MediaProduction & Broadcast
Project&
Conf.
Project&
Conf.
Project&
Conf.
Project&
Conf.
TeacherResourceTeacher
Resource
ComputerNetworkRoom
ComputerNetworkRoom
Equip.Stor.
Equip.Stor.
LibrarianOffice
&Work
LibrarianOffice
&Work
Reading&
StackAreas
Reading&
StackAreas
Book StorageBook Storage
CirculationDesk
Computer LabComputer Lab
Office / Stor. /Work / Conf.
Office / Stor. /Work / Conf.
Computer LabComputer Lab
Day lighting with north facing windows,consider secure outdoor reading area
Lecture AuditoriumLecture
AuditoriumMedia
Production & Broadcast
MediaProduction & Broadcast
Project&
Conf.
Project&
Conf.
Project&
Conf.
Project&
Conf.
TeacherResourceTeacher
Resource
ComputerNetworkRoom
ComputerNetworkRoom
Equip.Stor.
Equip.Stor.
LibrarianOffice
&Work
LibrarianOffice
&Work
Reading&
StackAreas
Reading&
StackAreas
Book StorageBook Storage
CirculationDesk
Computer LabComputer Lab
Office / Stor. /Work / Conf.
Office / Stor. /Work / Conf.
Computer LabComputer Lab
Day lighting with north facing windows,consider secure outdoor reading area
Cor
ridor
Cor
ridor
Cor
ridor
Cor
ridor
Media Center / Library
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
61
8.9.04 mms
hm
ms
h
Program Diagrams w
aste
was
te
VendingVending
Gen.Stor.
Gen.Stor. Food Court /
servingFood Court /
serving
Holding &
Serving
Holding &
Serving
Mgr.OfficeMgr.
Office
FreezerFreezer
CoolerCooler
Dry StorageDry Storage
ReceivingReceiving
ToiletToilet
Toilet.Toilet.
Lock
erLo
ckerLoading
DockLoading
DockCartSto.
CartSto.
CanWashCan
Wash
Preparation&
Cooking
Preparation&
Cooking
Jan. & Sto.Jan. & Sto.
Dish,Tray
Pot /PanWash
Dish,Tray
Pot /PanWash
TrayRtrn.TrayRtrn.
OutdoorServing
OutdoorServing
Dining &Multi-purpose CourtDining &
Multi-purpose Court
Outdoor DiningOutdoor Diningw
aste
was
te
VendingVending
Gen.Stor.
Gen.Stor. Food Court /
servingFood Court /
serving
Holding &
Serving
Holding &
Serving
Mgr.OfficeMgr.
Office
FreezerFreezer
CoolerCooler
Dry StorageDry Storage
ReceivingReceiving
ToiletToilet
Toilet.Toilet.
Lock
erLo
ckerLoading
DockLoading
DockCartSto.
CartSto.
CanWashCan
Wash
Preparation&
Cooking
Preparation&
Cooking
Jan. & Sto.Jan. & Sto.
Dish,Tray
Pot /PanWash
Dish,Tray
Pot /PanWash
TrayRtrn.TrayRtrn.
OutdoorServing
OutdoorServing
Dining &Multi-purpose CourtDining &
Multi-purpose Court
Outdoor DiningOutdoor Dining
Day lighting & view to fields below
Cafeteria
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
62
8.9.04 mms
hm
ms
h
Program Diagrams w
aste
was
te
Mgr.OfficeMgr.
Office
Food Court /Serving
Food Court /Serving
VendingVending
FreezerFreezer
CoolerCooler
Dry StorageDry Storage
ReceivingReceiving
ToiletToilet
Toilet.Toilet.Lo
cker
Lock
erLoadingDock
LoadingDock
CartSto.
CartSto.
Dining& Multi-purpose CourtDining
& Multi-purpose Court
Outdoor DiningOutdoor Dining
CanWashCan
Wash
Preparation&
Cooking
Preparation&
Cooking
Jan. & Sto.Jan. & Sto.
Dish, Tray,Pot & Pan
Wash
Dish, Tray,Pot & Pan
Wash
TrayReturnTray
Return
OutdoorServing
OutdoorServing
Gen.Stor.
Gen.Stor.
Holding &
Serving
Holding &
Serving
Corridor
was
tew
aste
Mgr.OfficeMgr.
Office
Food Court /Serving
Food Court /Serving
VendingVending
FreezerFreezer
CoolerCooler
Dry StorageDry Storage
ReceivingReceiving
ToiletToilet
Toilet.Toilet.Lo
cker
Lock
erLoadingDock
LoadingDock
CartSto.
CartSto.
Dining& Multi-purpose CourtDining
& Multi-purpose Court
Outdoor DiningOutdoor Dining
CanWashCan
Wash
Preparation&
Cooking
Preparation&
Cooking
Jan. & Sto.Jan. & Sto.
Dish, Tray,Pot & Pan
Wash
Dish, Tray,Pot & Pan
Wash
TrayReturnTray
Return
OutdoorServing
OutdoorServing
Gen.Stor.
Gen.Stor.
Holding &
Serving
Holding &
Serving
was
tew
aste
Mgr.OfficeMgr.
Office
Food Court /Serving
Food Court /Serving
VendingVending
FreezerFreezer
CoolerCooler
Dry StorageDry Storage
ReceivingReceiving
ToiletToilet
Toilet.Toilet.Lo
cker
Lock
erLoadingDock
LoadingDock
CartSto.
CartSto.
Dining& Multi-purpose CourtDining
& Multi-purpose Court
Outdoor DiningOutdoor Dining
CanWashCan
Wash
Preparation&
Cooking
Preparation&
Cooking
Jan. & Sto.Jan. & Sto.
Dish, Tray,Pot & Pan
Wash
Dish, Tray,Pot & Pan
Wash
TrayReturnTray
Return
OutdoorServing
OutdoorServing
Gen.Stor.
Gen.Stor.
Holding &
Serving
Holding &
Serving
CorridorCorridor
Day lighting & view to fields below
Cafeteria
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
63
8.9.04 mms
hm
ms
h
Program Diagrams
Auditorium SeatingAuditorium Seating
LobbyLobby
Con
trol P
latfo
rm
Concession&
Ticketing
Concession&
Ticketing
WomenPublic ToiletWomen
Public Toilet
MenPublic ToiletMen
Public Toilet
Stage& WingsStage
& Wings
Stage / Wing StorageStage / Wing Storage
GreenRoomGreen
RoomDressing
DressingDressing
Dressing
Gallery Corridor
Tlt.Tlt.
Auditorium SeatingAuditorium Seating
LobbyLobby
Con
trol P
latfo
rm
Concession&
Ticketing
Concession&
Ticketing
WomenPublic ToiletWomen
Public Toilet
MenPublic ToiletMen
Public Toilet
Stage& WingsStage
& Wings
Stage& WingsStage
& Wings
Stage / Wing StorageStage / Wing Storage
GreenRoomGreen
RoomDressing
DressingDressing
Dressing
Gallery CorridorGallery Corridor
Tlt.Tlt.
Renovations & Additions to Auditorium
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
64
8.9.04 mms
hm
ms
h
Program Diagrams
GirlsTrainingGirls
Training
GirlsUniformsGirls
Uniforms
Girls CoachesGirls
Coaches
GirlsP.E.
& VisitorsDressing
GirlsP.E.
& VisitorsDressing
Boys CoachesBoys
Coaches
BoysP.E.
& VisitorsDressing
BoysP.E.
& VisitorsDressing
LobbyLobby
Gymnasium Floor Gymnasium Floor
RetractableStage
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Boys Varsity
Dressing
Boys Varsity
Dressing
Girls Varsity
Dressing
Girls Varsity
Dressing
Concession
LaundryLaundry
GirlsEquip. Girls
Equip.
Boys UniformsBoys
Uniforms
General StorageGeneral Storage
BoysTrainingBoys
Training
Training /Workout Room
At 2nd level
Training /Workout Room
At 2nd level
BoysEquip. Boys
Equip.
Multi-purpose RoomAt 2nd levelMulti-purpose Room
At 2nd level
Film &MeetingRoom
Film &MeetingRoom
Health ClassroomHealth
Classroom
Health ClassroomHealth
Classroom
PublicToiletPublic
Toilet
PublicToiletPublic
Toilet
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
GirlsTrainingGirls
Training
GirlsUniformsGirls
Uniforms
Girls CoachesGirls
Coaches
GirlsP.E.
& VisitorsDressing
GirlsP.E.
& VisitorsDressing
Boys CoachesBoys
Coaches
BoysP.E.
& VisitorsDressing
BoysP.E.
& VisitorsDressing
LobbyLobby
Gymnasium Floor Gymnasium Floor
RetractableStage
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Fixed Seatingabove
Dressing
Boys Varsity
Dressing
Boys Varsity
Dressing
Girls Varsity
Dressing
Girls Varsity
Dressing
Concession
LaundryLaundry
GirlsEquip. Girls
Equip.
Boys UniformsBoys
Uniforms
General StorageGeneral Storage
BoysTrainingBoys
Training
Training /Workout Room
At 2nd level
Training /Workout Room
At 2nd level
BoysEquip. Boys
Equip.
Multi-purpose RoomAt 2nd levelMulti-purpose Room
At 2nd level
Film &MeetingRoom
Film &MeetingRoom
Health ClassroomHealth
Classroom
Health ClassroomHealth
Classroom
Film &MeetingRoom
Film &MeetingRoom
Health ClassroomHealth
Classroom
Health ClassroomHealth
Classroom
PublicToiletPublic
Toilet
PublicToiletPublic
Toilet
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
CoachOffice
CoachOffice
CoachOffice
CoachOffice
Tlt.
Dre
ssTl
t. D
ress
P.E. &Visitors
Dressing&
Lockers
P.E. &Visitors
Dressing&
Lockers
Toile
tTo
ilet
Dry
Dry
Show
erSh
ower
Toile
tTo
ilet
Dry
Dry
Shw
r.Sh
wr.
VarsityDressing & Lockers
VarsityDressing & Lockers
Cor
ridor
CoachOffice
CoachOffice
CoachOffice
CoachOffice
Tlt.
Dre
ssTl
t. D
ress
P.E. &Visitors
Dressing&
Lockers
P.E. &Visitors
Dressing&
Lockers
Toile
tTo
ilet
Dry
Dry
Show
erSh
ower
Toile
tTo
ilet
Dry
Dry
Shw
r.Sh
wr.
VarsityDressing & Lockers
VarsityDressing & Lockers
Cor
ridor
Cor
ridor
Dressing Areas
Enlarged portion of new Gym diagram. Boys & Girls sides of Gym similar
New Gymnasium
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
65
8.9.04 mms
hm
ms
h
Program Diagrams
Dre
ssin
g D
ress
ing
Gymnasium Floor Gymnasium Floor
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
Classrm. /Multi-useClassrm. /
Multi-use
Classrm. /Multi-useClassrm. /
Multi-use
Dre
ssin
g D
ress
ing
StorageStorage
Lobby/Classrm. /Multi-use
Lobby/Classrm. /Multi-use
Concess.Concess.
ToiletToilet
ToiletToilet
Dre
ssin
g D
ress
ing
Gymnasium Floor Gymnasium Floor
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
Classrm. /Multi-useClassrm. /
Multi-use
Classrm. /Multi-useClassrm. /
Multi-use
Dre
ssin
g D
ress
ing
StorageStorage
Lobby/Classrm. /Multi-use
Lobby/Classrm. /Multi-use
Concess.Concess.
ToiletToilet
ToiletToilet
Dre
ssin
g D
ress
ing
Gymnasium Floor Gymnasium Floor
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
Gymnasium Floor Gymnasium Floor
Ret
ract
able
Ble
ache
rs
Ret
ract
able
Ble
ache
rs
Classrm. /Multi-useClassrm. /
Multi-use
Classrm. /Multi-useClassrm. /
Multi-use
Dre
ssin
g D
ress
ing
StorageStorage
Lobby/Classrm. /Multi-use
Lobby/Classrm. /Multi-use
Concess.Concess.
ToiletToilet
ToiletToilet
Lower Level Upper Level
Renovation & Refurbishment of Existing Gym / Field House
ROTCROTC
ROTCROTC
cartscarts
cartscarts
Trai
ning
Trai
ning
FootballDressingFootball
Dressing
Visitors, Track & BaseballDressing
Visitors, Track & BaseballDressing
Shwrs.Shwrs.
DryDry
ToiletsToilets
ToiletsToilets
DryDry
Shwrs.Shwrs.
CoachesOffice /
Cubicles
CoachesOffice /
Cubicles Tlt.,
Shw
r.&
Dre
ssg.
Tlt.,
Shw
r.&
Dre
ssg.
LaundryLaundry
EquipmentStorageEquipment
Storage
Classroom&
Film
Classroom&
Film
Multi-purpose Room
Multi-purpose Room
Weight RoomWeight Room
Sto.Sto.
UniformStorageUniform
Storage
ROTCROTC
ROTCROTC
cartscarts
cartscarts
Trai
ning
Trai
ning
FootballDressingFootball
Dressing
Visitors, Track & BaseballDressing
Visitors, Track & BaseballDressing
Shwrs.Shwrs.
DryDry
ToiletsToilets
ToiletsToilets
DryDry
Shwrs.Shwrs.
CoachesOffice /
Cubicles
CoachesOffice /
Cubicles Tlt.,
Shw
r.&
Dre
ssg.
Tlt.,
Shw
r.&
Dre
ssg.
LaundryLaundry
EquipmentStorageEquipment
Storage
Classroom&
Film
Classroom&
Film
Multi-purpose Room
Multi-purpose Room
Weight RoomWeight Room
Sto.Sto.
UniformStorageUniform
Storage
ROTCROTC
ROTCROTC
cartscarts
cartscarts
Trai
ning
Trai
ning
FootballDressingFootball
Dressing
Visitors, Track & BaseballDressing
Visitors, Track & BaseballDressing
Shwrs.Shwrs.
DryDry
ToiletsToilets
ToiletsToilets
DryDry
Shwrs.Shwrs.
CoachesOffice /
Cubicles
CoachesOffice /
Cubicles Tlt.,
Shw
r.&
Dre
ssg.
Tlt.,
Shw
r.&
Dre
ssg.
LaundryLaundry
EquipmentStorageEquipment
Storage
Classroom&
Film
Classroom&
Film
Multi-purpose Room
Multi-purpose Room
Weight RoomWeight Room
Sto.Sto.
UniformStorageUniform
Storage
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
66
8.9.04 mms
hm
ms
h
Program Diagrams
Cad LabCad Lab
StorageStorage Office
Office
Ag LabAg Lab
WoodworkingShopWoodworking
Shop
GreenhouseGreenhouse
ClassroomClassroom
Views to fields belowPedestrian & Service
Walkway
Cad LabCad Lab
StorageStorage Office
Office
Ag LabAg Lab
WoodworkingShopWoodworking
Shop
GreenhouseGreenhouse
ClassroomClassroom
Views to fields belowPedestrian & Service
WalkwayPedestrian & Service
Walkway
Technical Arts
Locate below cafeteria with access from above and from walkway along hilltop west of new building.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
67
8.9.04 mms
hm
ms
h
Program Diagrams
Supply StorageSupply
StorageShop
Shop
Yard MaintenanceStorageYard Maintenance
Storage
Supply StorageSupply
StorageShop
Shop
Yard MaintenanceStorageYard Maintenance
Storage
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
JanitorJanitor
Janitorial & Shop
Storage and shop area located adjacent to Central plant. Janitor closets distributed thru Campus buildings.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
68
8.9.04 mms
hm
ms
h
Code Category N.F.P.A.. 101 (2003 Edition) International Building Code (2000 Edition)
General Building Description: • Approximately 180,000 s.f.; 1, 2 or 3 stories; approximately 105,000 s.f. new construction; approximately 48,000 s.f. renovated & 28,000 s.f. refurbished • Assembly areas include new gymnasium, new cafeteria, renovated auditorium, renovated gymnasium and refurbished football stadium
Occupancy Classification :
• Education (chapter 14) • Mixed or multiple occupancy design strategies require that
assembly spaces comply chapter 12 (14.1.2) • Multiple occupancy separates uses with fire rated construction
(6.14.2.3 & table 6.1.14.4.1) • Mixed occupancies intermingles uses w/ more stringent
requirements (6.1.14.3)
• Education (section 305) • Incidental Use areas such as labs, vocational shops, laundry
rooms over 100 s.f. and storage over 100 s.f. require 1 hour separation or sprinkler protection (table 302.1.1)
• Assembly areas ≤ 10% area are not separate occupancies (table 302.3.3.e)
Construction Type : • Type II (000) • Type II A sprinkled (Sprinkler reduces 1 hour to 0—table 601.d)
Allowable Height & Area • • 3 stories, 65’ height maximum (table 503) 4 stories & 85’ with sprinkler (504.2)
• Multi-story maximum = 26,500 s.f./ floor (area increase up to 75% with open perimeter per section 506.2 = 46,375 s.f. max)
Occupant Load (s.f./ occupant)
• Classrooms: 20 net; shops, labs & library reading: 50 net; as-sembly: 7 net for concentrated without fixed seats, 15 net less concentrated without fixed seats, actual number of fixed seats; kitchens, library stacks & offices: 100 (table 7.3.1.2)
• Classrooms: 20 net; Labs & shops: 50 net; Assembly: 7 net for chair only, 5 for standing, 15 for tables & chairs, and actual number for fixed seating
• Office areas: 100 s.f. gross / occupant
Exit Capacity • .2” / person for doors and aisles • .3” / person for stairs • Minimum door width = 36” (32” clear)
• .2” / person or .15” with sprinkler • .3” / person for stairs or .2” with sprinkler • Minimum door width = 36” ( 34” clear)
Number of exits • 2 Minimum (14.2.4) • All rooms occupied by students shall exit to an exit access
corridor thru no more than one intervening room (14.2.5.4)
• 2 Minimum for 1-500(1 for spaces with less than 50 occupants) • 3 for 501-1,000 and 4 for over 1,000 • Exterior stairs permitted (1005.3.6.5)
Dead End Limit • 20’ increased to 50’ when sprinkled (14.2.5.2)) • 20’ (1004.3.2.3)
Common Path of Travel • 75’ increased to 100’ when sprinkled (14.2.5.3) • 75’ (1004.2.5)
Exit Stairs & Shaft Enclosures & exit passageways
• 1 hour separation for up to 3 floors • 48” minimum clear between handrails per 7.2.12.2.3 where
stairwell used as area of refuge
• Up to 3 floors require 1 hour enclosures (1005.3.2); exception 8 permits 50% to exit one floor thru an unenclosed stair
• Exit passageway: 1 hour rated and 44” minimum width
Code Provisions
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
69
8.9.04 mms
hm
ms
h
Code Category N.F.P.A.. 101 (2003 Edition) International Building Code (2000 Edition)
Exit Access Corridors • 1 hour rating. Corridors do not require rating in buildings protected by automatic sprinkler (14.3.6)
• Minimum width of 72” (14.2.3.2)
• 1 hour rated; No rating when sprinkled (table 1004.3.2.1)
Travel Distance • 150’ increased to 200’ when sprinkled (14.2.6)) • 200’ (250’ when sprinkled) table 1004.2.4 • 1/2 diagonal distance (1/3 when sprinkled) from rooms with 2
exits (1004.2.2)
Emergency Lighting • Required per 7.9 • Required in spaces with 2 exits and components of egress (1003.2.11.2)
Exit Signs • Not required at main exterior exit doors (7.10.1.2) • Not required at main entries obvious as exits or in rooms with one exit (1003.2.10.1 exceptions 1& 2)
Protection from Hazards • One hour or sprinkler protection except 1 hour & sprinkler for laundries, shops, rooms for combustibles (14.3.2)
• Furnace rooms over 400,000 Btuh, boileres over 15 psi, and refrigerant rms.—1 hour separation or sprinkler (table 302.1.1)
Compartmentation & Tenant Separation
• 1 hour smoke partitions required to separate areas exceeding 30,000 s.f. or dimensions exceeding 300’ (14.4)
• Floors serve as smoke barriers in type II(000) const. • Horizontal exits permitted per 7.2.4
•
Atrium / Vertical Opening • When connecting up to 3 floors as a communicating space for egress use the provisions of 8.6.6 and the building shall be fully sprinkled per 14.3.5.4
• 2 adjacent stories can be connected when not used as a required means of egress using the convenience openings provisions of 8.6.8
• Sprinkler protection required for entire building except atrium ceiling above 55’
Interior finish • Wall & Ceiling: Class A in exits, Class A or B in other areas • Artwork wall coverage: 20% max, 50% for sprinkled (14.7.4)
• Exits– class A; exit access corridors—class B; rooms—class C • Sprinkler reduces finishes to classes B,C,C for above list
Extinguishing Requirements
• Automatic sprinklers per NFPA 13 • Portable fire extinguishers per NFPA 10 • Buildings with assembly occupancies greater than 300 shall
be sprinkled (12.3.5)
• Required for each fire area exceeding 20,000 s.f. & areas below level of exit discharge (903.2)
Laboratory Requirements • NFPA 45 chemicals. Design based on class “C” quantities •
Hazard Classification • Ordinary & Low Hazard operations •
Code Provisions
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
70
8.9.04 mms
hm
ms
h
Code Category N.F.P.A.. 101 (2003 Edition) International Building Code (2000 Edition)
Renovated Auditorium with fixed seating for 600
• Type II (000) construction permitted for any assembly at level of exit discharge
•
Stage Classification • Regular Stages do not require rated separation and do not require rated a fire curtain. Suggest using a 20 minute fire rated curtain which exceeds code requirements.
•
Accessory Rooms • Workshops, storerooms and dressing rooms shall be sepa-rated by one hour fire resistance construction where stages exceed 1000 s.f. Smoke ventilation is also required for regular stages exceeding this size (12.4.5.4)
•
Stage sprinkler system • Sprinkler protection required for all stages unless less than 1000 s.f. and a proscenium height of less than 50’ (12.4.5.10)
•
Standpipes • Regular stages over 1000 s.f. shall be equipped with 1 1/2” hose lines on each side of the stage
•
Stage ventilators • Smoke control provided by either: fan powered smoke control system or; two or more labeled roof vents providing free area equal to 5% of the stage area for regular stages over 1,000 s.f. and activated by heat detector and manually (12.4.5.5)
•
Smoke protected assembly seating
• Sprinkler protection of seating areas & smoke ventilation of egress areas serving seating (12.4.2). Smoke protection provides for increases in travel distance and increases in capacity for stairs & other means of egress components.
•
Assembly seating access aisles
• Where rows exceed 14 seats with aisles at both ends the aisle access clear width of 12” shall be increased .6” for each additional seat. Minimum aisle width is not required to exceed 22” (12.4.2.5) For single access rows the increase begins at 7 seats
•
Windows for rescue • 7.5 s.f. clear operable window required up to 3 stories & classrooms greater than 250 s.f. unless fully sprinkled (14.2.11.1)
•
Classroom aisles • 30” wide minimum (14.2.5.6) •
Code Provisions
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
71
8.9.04 mms
hm
ms
h
Code Category N.F.P.A.. 101 (2003 Edition) International Building Code (2000 Edition)
Detection, Alarms and Communications
• Fire Alarm system required per 9.6 • Manual fire alarm boxes may be eliminated when (1) interior
corridor smoke detection, (2) assembly areas include heat detection, (3) shops / labs include heat detection & (4) central point to manually activate signal in affected areas (14.3.4.2.3)
• Automatic initiation with sprinkler (14.3.4.2.2) • Notification: Audible and visible per NFPA 72
• Required for occupant load ≥ 50 (section 907) • Manual fire alarm system connected to sprinkler and smoke
detection. Pull stations not required per 907.2.3 exceptions 2.1 thru 2.6 when all 6 requirements are met ( 1. Smoke detection 2. Heat detection in assembly areas 3. Heat detection in shops & labs 4. Off-premises monitoring 5. Activation from central point 6. Two-way communication)
Equipment Access • Minimum with for walkway, platform or stair is 22”, riser height up to 9”
• Alternating tread stairs acceptable
• 2 exits are required from boiler rooms over 500 s.f. one of which may be a ladder or alternating tread device
Plumbing fixtures required per Louisiana Plumbing Code
Parking • Parking for 1,500 seat gym at 1 space per 3 people = 500 spaces parking demand • Parking for school hours based on 1,000 students at 1 car per 4 students = 250 cars + 80 (1/employee) = 330 parking demand
Accessible Parking • • 5 accessible spaces required for 101-150 spaces • One of the required accessible shall be van accessible for
every 8 accessible spaces
Raised or Roof mounted equipment
• • Clearance requirements when roofing extends beneath equipment ranges from 14” to 48” depending on size in table
Structural Considerations • •
• Occupant load = Maximum daily population of 1,000 students plus 100 staff • Water Closets = 23 male, 23 female • Lavatories = 10 male, 10 female • Urinals = 11 male ( can substitute for half of male WC’s) • Drinking fountains = one required for each 3 classrooms with 1 pair / floor minimum • Showers = no specific requirements
Code Provisions
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
72
8.9.04 mms
hm
ms
h
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
See examples this page Stackable
Room Worksheets
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
73
8.9.04 mms
hm
ms
h
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Classrooms
32 + teacher
Varies by department
Teacher computer 5 student computers ACTIVBoard or equal w/ ceiling LCD projector
See examples this page Stackable
Direct / indirect fixtures using T-5 lamps. Also use day lighting to reduce energy
In specified classrooms
110 V outlets
Wireless connection
Room Worksheets
Class arrangements should allow for a variety of room arrangements
2 drawer lateral file for teacher
Telephone w/ intercom
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
74
8.9.04 mms
hm
ms
h
Classrooms (continued) Room Worksheets
19’ 7’
24’-6”
32’
Typical Classroom Model
1 2 3
4
5
6
6
6
7
1.Teacher workstation with phone with intercom, computer & 2 drawer lateral file 2.Storage cabinets above and below work counter. 3.Optional location for sink in classrooms where needed 4.Desks and stackable chairs for reconfiguring learning environment (see page 75) 5.ACTIVBoard with ceiling mounted LCD projector that is also used for television 6.Marker board and bulletin board options on front and rear walls of classroom 7.Counter space for up to five computer stations with computer below counter. Bookshelves could be installed on this wall as an option.
1
2 3
Elevation A
Elevation B
Elevation C
Elevation D
Elevation A
Elevation B
Elevation C
Elevation D
5
5
6 6
6
7
7
7 2
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
75
8.9.04 mms
hm
ms
h
Classrooms (continued) Room Worksheets
Teacher Oriented Team Project / Peer Learning
Discussion Groups
Flexible classroom configurations for a variety of learning environments
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
76
8.9.04 mms
hm
ms
h
Classrooms (continued) Room Worksheets
Paired Math Classrooms Model
1. Liquid marker board on 3 walls 2. Desk height counter with space for 5 computers (computers below counter) 3. ACTIVBoard or equal with ceiling mounted LCD projector that is also used
as a television (optional location for T.V. in corner) 4. Classroom desks and stackable chairs to allow for room reconfiguration 5. Teacher storage (open shelving) 6. Teacher desks (room will be lockable)
24’-6” 8’-0””
30’ t
o 32
’
1
1
1
1
2
3
4 5
6
6
5
Math Classroom Math Classroom
Teac
her W
orkr
oom
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
77
8.9.04 mms
hm
ms
h
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Science Labs & Classrooms
Room Worksheets
Classroom
Classroom
Shared Science Lab
Shared Lab &
Classroom Storage
and Prep See Fisher Scientific lab casework (plastic laminate) for information See Wood lab casework for information
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
78
8.9.04 mms
hm
ms
h
Science Labs Room Worksheets
67” square
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
79
8.9.04 mms
hm
ms
h
Science Labs Room Worksheets
Science Classrooms should have more lab / classroom flexibility
Classroom / Lab Classroom Shared Lab Classroom
Science Classrooms should have more lab / classroom flexibility
Classroom / Lab Classroom Shared Lab Classroom
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
80
8.9.04 mms
hm
ms
h
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Library & Media Center
Dishwasher Refrigerator / Freezer Ice machine Water Dispenser Microwave
Room Worksheets
The library should be in a central location and accessible tothe public for distance learning and other programs
Library(increase size)
stack area for 20,000 vols.& reading area
Library(increase size)
stack area for 20,000 vols.& reading area
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
Distance Learning
Distance Learning
Storagefor
300 piecesof
equipment
Storagefor
300 piecesof
equipment
Computer NetworkRoom
Computer NetworkRoom
T-1 connection to WEB
PublicAccess
Dual Access
The library should be in a central location and accessible tothe public for distance learning and other programs
Library(increase size)
stack area for 20,000 vols.& reading area
Library(increase size)
stack area for 20,000 vols.& reading area
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
ComputerLab
Distance Learning
Distance Learning
Storagefor
300 piecesof
equipment
Storagefor
300 piecesof
equipment
Computer NetworkRoom
Computer NetworkRoom
T-1 connection to WEB
PublicAccess
Dual Access
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
81
8.9.04 mms
hm
ms
h
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Activities:
Equipment:
Number of people:Hours of operation:Important adjacencies:Description of tasks / activities:
Equipment name: size: utility requirements: description:
Furnishings: (size & description)Desks:Tables:Chairs:
Lab casework:File Cabinet:Other:
Environmental Issues:Temperature Requirements:Lighting requirements:Exhaust requirements:Other:
Sinks:Deionized water:Compressed air:Vacuum:Power requirements:
Gas:Internet::Data/ Communications:Emergency Power:Other:
Utilities:
Cafeteria & Commons
Dishwasher Refrigerator / Freezer Ice machine Water Dispenser Microwave
Room Worksheets
IndoorCommons
&FoodCourt
OutdoorCommonsKitchen
Food service lines To classrooms
IndoorCommons
&FoodCourt
OutdoorCommonsKitchen
Food service lines To classrooms
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
82
8.9.04 mms
hm
ms
h
Facility M.E.P. Systems Mechanical
Site Utilities Building services to be served by site utilities include natural gas, domestic cold water, sanitary drainage, storm drainage and fire sprinkler water systems. The specific utility requirements and services will be coordinated based upon the actual site and utility conditions. Domestic cold water shall be connected in a metered connection to the existing public mains and extended to the building. Sanitary sewerage system drainage shall be gravity run to the existing municipal mains. Storm drainage will be a combination of surface and subsurface drainage. Roof drainage system of the building shall tie into catch basins which will also provide drainage for parking lots and open areas. Fire sprinkler main shall be connected to the public water supply with separate main to the building. Air Conditioning, Heating and Ventilation The following are relevant considerations to be considered in the design of the HVAC systems for the new buildings:
• The public areas of the building are expected to be in occupied operation 50 to 55 hours per week. • Temperature in classrooms, offices and common spaces should be maintained between 68°F and 75°F while the building is in operation. Night
setback temperatures shall be 55°F and 80°F. • Areas of the building are divided into air handling unit zones based on the similarity in the usage of space, time of use, and thermal loading.
Separate air distribution systems shall serve the auditorium, cafeteria, classrooms, offices, etc. Each classroom area shall have individual room temperature control.
Due to its high energy efficiency, a variable air volume (VAV) system is proposed for individual space and zone control. Two types of VAV systems are being considered:
1. VAV with downstream hydronic (hot water) heat 2. VAV with downstream electric heat
An economic analysis between the two options based on current utility rates will be utilized to determine the most cost effective system type. Hydronic or electric heat at the VAV terminal boxes will provide heating for each zone. The airside of the HVAC system shall consist of central station variable air volume (VAV) air handling units with terminal boxes for zone airflow and heating control. The proposed air distribution system from the air-handling units (AHU) is a single duct system. The AHU's shall be modular draw-thru units consisting of a mixing box, preheat coil, ultraviolet light section for air and coil cleaning, chilled water coil and fan section. Each AHU will produce 55°F air to the single duct system for its respective area. Supply air distribution system will consist of oval or spiral round ductwork and will conduct the cooled supply air to the individual VAV boxes. Each box will modulate the amount of air to the space based on space temperature setpoint. As the cooling load is satisfied, the air valve will close. The air valve will continue to close until the minimum airflow setting for the box is reached; if the space temperature continues to fall, the heating coil at the
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
83
8.9.04 mms
hm
ms
h
Facility M.E.P. Systems VAV box will warm the air to maintain space temperature and avoid overcooling. The main supply and return ducts, VAV boxes, and hydronic piping will be located for ease of access and maintenance. When air valves at the VAV boxes close and open, the pressure in the ductwork increases and decreases, respectively. A pressure sensor in each main branch of the duct system will sense the changes in duct pressure and signal the variable frequency drive (VFD) at the air handler fan motor to vary the system air flow by speeding up or slowing down the fan. This sequence will reduce fan energy consumption and minimize the energy penalty for overcooling and/or reheating. The building exhaust system will consist of a general exhaust system serving public toilets, janitor closets, etc. through central systems with roof mounted exhaust fans, and individual exhaust fans for any fume hoods in science classrooms. The air handling units will be located in mechanical spaces strategically positioned throughout the building. Multiple areas of the building (classrooms, offices, toilets, etc.) will require constant ventilation airflow during occupied time periods to maintain minimum ventilation rates as dictated by current codes. During unoccupied periods, these areas can reduce both their supply and ventilation airflows to conserve energy. Control of the main air handling and hydronic systems as well as the individual zones shall be by electronic direct digital control devices tied to a main energy management, building automation system. The building system can be tied into a district-wide energy management system. In order to generate the cooling medium required by the building, air or water-cooled water chillers will be incorporated using two chillers. The new chiller, pumps and auxiliary equipment will be located in a mechanical room in the back of the building. Insulated piping systems will distribute chilled water to air handling units throughout the building. If the project includes air conditioning for the 1938 gym / field house building a separate system will be used to avoid piping cost from the central plant for the east side of the campus. This will likely be a split system with outdoor condensing units. Plumbing • Plumbing fixtures will consist of water closets and lavatories at toilets, work sinks and janitor’s sinks and water coolers. Emergency eyewash or showers
will be provided where required in science classrooms. • High efficiency natural gas-fired water heaters will be utilized to produce domestic hot water at 110OF for general use and 140OF water for the cafeteria
kitchen. • All exterior cold water, hot water (including recirculating lines), and roof drain leaders within the building shall be insulated. • All flat roof areas of the new building shall be equipped with roof drains, and overflow scuppers. Roof drain leaders should run within the building and a
new site tie-in made as described under Site Utilities. • Natural gas will be piped to laboratory workbenches where desired. Each science lab will have an emergency gas shut-off button to allow the teacher to
stop the gas flow to the lab during an emergency. • Science classroom waste piping shall be routed separately from the general building waste piping and shall be piped through a neutralization basin prior to
entering the municipal sanitary sewer system.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
84
8.9.04 mms
hm
ms
h
Facility M.E.P. Systems Fire Protection • A complete wet system as defined in NFPA 13 will be provided for the entire building. Each zone and riser will be provided with a shut-off valve and flow
and tamper switches. • If the municipal water pressure is not sufficient, a fire pump will be required to provide the flow and pressure mandated by NFPA. Electrical Power Distribution • Site electrical power shall be derived by overhead high voltage utility mains adjacent to the site. High voltage primary service shall drop underground and
extend to a pad mounted distribution transformer located adjacent to the building. The 480Y/277 volts secondary service shall enter the building at an electrical room near the transformer location. Power shall be 480/277 volts, three phase 4-wire for building distribution.
• Building electrical power shall be derived from the main distribution panels and be distributed to sub-distribution points throughout the building. Lighting shall generally run at 277 volts with transformers and distribution for receptacle power at 120 volts. Small rooms will be provided at various locations for panels to provide cost effective power distribution.
• Consideration shall be given to concentrated use of computers and computer-similar equipment. Distribution devices shall be specified to handle the normally occurring high harmonic currents found in such areas.
Lighting • The building shall be equipped with an energy management system, which will be used, through control points, to switch the public area lighting so that,
only at those times required, are the public areas illuminated. • Exterior and interior lighting will be designed to provide a comfortable and durable installation based on building architectural design criteria. Classrooms
will be combination direct / indirect fixtures utilizing T-5 lamps. Corridor lighting will also utilize indirect lighting with some areas designed for display. Day lighting will be incorporated as an energy savings and indoor environment consideration.
• All lighting shall be designed in accordance with minimum light levels as recommended by the Illuminating Engineering Society of North America. Power Outlets and Electrical Connections • General-purpose duplex receptacles will be provided in all places inside the building as governed by Code and good design practices. Outlets willl be
spaced so that the building may be maintained without the use of extension power cords longer than 25’-0”. Reel type outlets will be utilized in industrial arts areas, ag labs and possibly in classrooms. Classrooms will be wired for ACTIVBoards or equal with ceiling mounted LCD projectors. These devices may be added in the future based on budget constraints.
• Receptacles for dedicated computer and computer server use, telecommunication equipment and other electronic equipment shall be “isolated ground” type.
• Each interior receptacle located within 6’-0” of a source of water shall be the “ground-fault-interrupter” type.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
85
8.9.04 mms
hm
ms
h
Product & Information Web Sites Telecommunications/Data • The local telephone carrier will extend telephone mains to each facility. Each classroom will have a telephone equipped with an intercom or a traditional. • A main telecommunications area will be provided. Downstream satellite distribution backboards will be provided. Telephones and data outlets at the user
location shall be a combination of category 5 data cable and category 3 voice communications cable. • The category 5 system shall be capable of supporting local area computer networks. • Wireless hubs will also be part of planning for internet connections. Central Clock • If requested by Webster Parish Schools a correcting master clock system with correctable indicating clocks located at various points throughout the
building will be designed. Fire Alarm System • A fully supervised addressable fire alarm system will be provided. Device spacing will be in accordance with State Fire Marshall template based on
lumens output. Energy Conservation • Mechanical system design, service water heating design and electrical and lighting design shall be in accordance with the Louisiana Commercial Building
Energy Code. Security Systems • Security systems will be evaluated through the course of designing the project. Perimeter control points and camera locations are likely to be part of this
system. The assistance of a special consultant provided by the WPSB will be needed to finalize these requirements. Phasing construction will require renovation of the existing swimming pool structure as an open plan classroom for 4 classes of approximately 28 students. After construction this room will be amulti-purpose room for ROTC, cheerleaders, dance line, wrestling or other uses that could have spectators on the existing seating risers. A split system air conditioning system will likely be used for this and other spaces that receive air conditioning in the old gym.
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
86
8.9.04 mms
hm
ms
h
Product & Information Web Sites Classroom Organization: The Physical Environment http://teacher.scholastic.com/professional/futureteachers/classroom_organization.htm Adirondack School Furniture http://www.adirondack.com/mainCategory.cgi?catname=school&ssid=QQQ18F22BF2DE7FH9IN10B Demco http://www.demco.com/webprd_demco/product_index/FRN_SCF.htm ACTIVBoard http://www.activboard.com/index.htm SmartBoard http://www.smarttech.com/ Virco http://www.virco.com/Pages/setL1.htm Learning and Teaching: Physical Room Layout http://www.dmu.ac.uk/~jamesa/teaching/layout.htm The Impact of Technology on Learning Environments http://www.pkal.org/docs/anshen_shepley.pdf Whiteboards http://www.whiteboardsetc.com/ VIRCO http://www.virco.com/Pages/setL1.htm KI http://www.adirondack.com/product.cgi?pid=640&ssid=QQQ18F22BF2DE7FH9IN10B The New Design Handbook for School Food Service http://www.nfsmi.org/epubs/ex11-95/pdf_list.htm National Food Service Management institute http://www.nfsmi.org/ Wenger music education equipment products and rehearsal rooms http://www.wengercorp.com/wenger/wengerhome.nsf/MainFrameset!OpenFrameset Spacesaver high-density files http://www.spacesaver.com/
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
87
8.9.04 mms
hm
ms
h
Product & Information Web Sites Safety in high school labs https://fscimage.fishersci.com/webimages_FSC/downloads/Fisher_Safety.pdf Fisher Scientific teaching lab casework (plastic laminate) http://www.fisherhamilton.com/pdf/pdf_catalogs/14442/14442001.PDF Wood lab casework http://www.fisherhamilton.com/pdf/pdf_catalogs/13114/13114089.pdf Fisher lab planning guide http://www.fisherhamilton.com/pdf/pdf_catalogs/14442/14442001.PDF Republic Ventilated Athletic Lockers http://www.republicstorage.com/lockers/athletic.aspx?type=ventilated Cisco - Eagle Athletic Lockers http://www.cisco-eagle.com/storage/Lockers/athletic_lockers.htm
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
88
8.9.04 mms
hm
ms
h
Budget Site acquisition Property purchased for parking. Priorities for purchase are: 1. Houses
at the south end of the high school property at the corner of College and McIntyre (±120 parking), 2. Land south of College from the High school (±110 parking) and 3. Land and houses east of Richardson (±160 spaces). Numbers represent priorities for acquisition. ± 180 spaces can be provided within existing property around renovation and new construction.
Demolition Demolition includes the 1922 building, portions of the of the 1953
building and library addition, miscellaneous wood frame buildings for the track and football field, and the industrial / ag metal buildings.
Site improvements Paving includes new and existing asphalt drives and parking (± 300
spaces). Refurbishment of the home side stadium and press box; new concession and storage building; resurfacing the existing track; sidewalk improvements along the top of the hill to the west side of new construction; new covered walk to connect the east and west campus buildings; drainage improvements under the home side grandstand; and landscape and irrigation. The final scope of site improvements will be based on budget priorities and may not include all of the described work .
New Construction New construction will consist of approximately 160,000 s.f. at a
budgeted cost of $78 / s.f. Renovation Renovation of the 1953 building will include approximately 43,000 s.f.
of the existing building at a budgeted cost of $57 / s.f. Gym / Field House Refurbishment Refurbishment of the 29,000 s.f. existing building is budgeted at $21 /
s.f. Subtotal of Construction Costs Contingency Total Construction Cost
College
McIntyre
Richardson
Ash
W. U
nion 1
2
3
$300,000
320,000
610,000
12,480,000
2,450,000
610,000
16,770,000
1,600,000
$18,300,000
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
89
8.9.04 mms
hm
ms
h
Schedule
Survey
Facility Programming
Schematic Design
Design Development
Furniture Selections & bid documents
Construction Documents
Fire Marshal Review
Bidding
Contract & Notice to Proceed
Phase 1 Construction
Bid & order furniture
Phase 2 Construction
Furniture Installation
Occupancy
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D2004 2005 2006 2007
8.7
8.6
9.28
1.04
4.27
5.18
6.01
6.15
11.15
11.15
Survey
Facility Programming
Schematic Design
Design Development
Furniture Selections & bid documents
Construction Documents
Fire Marshal Review
Bidding
Contract & Notice to Proceed
Phase 1 Construction
Bid & order furniture
Phase 2 Construction
Furniture Installation
Occupancy
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D2004 2005 2006 2007
J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D2004 2005 2006 2007
8.7
8.6
9.28
1.04
4.27
5.18
6.01
6.15
11.15
11.15
Minden High School Facility Design Program Webster Parish School Board . Minden, Louisiana
Minden High School Design Program Morgan Hill Sutton & Mitchell Architects LLC
90
8.9.04 mms
hm
ms
h
Summary Minden has chosen to invest in renewing the Minden High School campus to serve the education needs of the community for the future. The decision to improve existing school sites recognizes the importance of the historic center of town to the long term economic health of Minden. It is a progressive direction that classifies the project as a part of “smart growth” and “sustainable design” or “green Architecture”. Approximately two thirds of the site is flood prone. This portion of the site is appropriately used for sports fields. The low area divides the campus into east and west portions of the campus suitable for buildings The existing collection of buildings have been added over decades. Buildings and parking placement have contributed to the current environment that is need of reorganization and an overall master plan. This program document represents the functional space requirements and demonstrates the inadequacy of the existing buildings to accommodate future education needs of the Minden community. To make most efficient use of the site and improve the image of the campus several buildings or portions of building will require demolition. In summarizing this program document there are several statements that should shape the design of a renewed Minden High School: Form: The appropriate response to residential context around the campus is important. The renewed campus should place emphasis on the pedestrian experience by excluding cars from the center of the campus. The buildings should be of permanent construction that enhances the neighborhood and provides a source of pride for Minden. Building design should incorporate reasonable energy conversation measures to enhance the projects status as ‘green architecture”, “sustainable design” and “smart growth”. Function: The high school design should take advantage of existing facilities when practical. The connection of the east and west sides of the campus through the low elevation portion of the site should be an enjoyable pedestrian experience. The circulation thru the buildings should provide indoor and outdoor gathering places that are easily supervised and inviting for students. Portions of the campus will be used by the public for after school functions. These areas should be located to be welcoming to the public and allow for other areas of school buildings to be secured. Building design should provide flexibility, respond to innovation in teaching methodologies and accommodate technology. Economy: The needs established in this program exceed the budget established for this project. As the project advances through schematic design and design development priorities should be reevaluated to determine a final scope of work for the high school improvements. Long term operational savings and durability of construction materials should not be compromised in a manner that results in less than a quality project. Time: The project will require phasing of construction to allow the school to be operational during construction. Improvements should be accomplished in as few phases as possible. Initial discussions and concept sketches project two phases.