7
Milwaukee II Levee WRIA 9 ITC March 20, 2019
Transcript of Milwaukee II Levee Project - Govlink
Earthen Levee and Flood Wall Levee Examples
Flood Wall Levee - Briscoe Reach 4 - Constructed in 2016
New Flood Wall Levee
New Earthen Levee
Earthen Levee – South Reach Levee -Constructed in 2016
Unique to Milwaukee II Levee
S. 259th Street Roadway Underpass at the Union Pacific Railroad