Contents• Introduction• Product• Product Design• Process Design• Schedule Design• Facility Design• Material Handling• Conclusion• References
IntroductionSustainability and Rexam
Sustainability• Since the 1980s sustainability has been used more in
the sense of human sustainability on planet Earth and this has resulted in the most widely quoted definition of sustainability as a part of the concept Sustainable development.
RexamRexam is a leading global beverage can maker.They make beverage cans for many of the world’s favourite brands.Our job is to make those cans as efficiently, profitably and sustainably as possible so that Their customers can attract and retain the loyalty of the people who consume their products. This is why, wherever you go in Rexam, you will see a common focus on operational excellence, innovation and safety to meet customers’ expectations.
Product Product Standard and Function
Product Standard & Function• Beverage Can (Standard of 330 ml )• Beverage can of Aluminum made upon request from
soda companies for holding soda drinks.• The product can be branded as the company request.
Product DesignIsometric and Main Design Features
Isometric and Main Design Features
Can Isometric View Can Body Design
Can Lid Design
Can Tap Design
Process DesignBill of Material, Route Sheet, Assembly Chart & Operation
Process Chart
Bill of MaterialThe beverage can consist of 4 parts manufactured at the facility where the rivets are the only part to buy.
Bill of material of the can
Route Sheet (Body)Product: Beverage can Part Name: Body
Raw material:Aluminum Alloy
“magnesium & Manganese” Included
Operation No. Operation Name Machine Department Operation Time
(sec)
10 Uncoiling Un-coiler Material Preparation0.01
material travel from coil to next m/c
20 Cupping Cupping press Body Making 0.0230 Body Making Body maker Body Making 0.0240 Trimming Trimmer Body Making 0.0150 Washing Washing m/c Curing & Cleaning 0.0260 Curing Oven Curing & Cleaning 0.0370 Printing Printer Product Finalizing 0.0180 Internal Coating Sprayer Product Finalizing 0.0290 Necking Necking m/c Product Finalizing 0.01
100 Inspection Can inspector Inspection 0.03110 Packaging Packaging m/c Packaging & Warehousing 0.03
Route Sheet (Lid)Product: Beverage can Part Name: Lid
Raw material:Aluminum Alloy “magnesium &
Manganese” Included
Operation No. Operation Name Machine Department Operation Time(sec)
10 Un-coiling Un-Coiler Material Preparation0.01
material travel from coil to next m/c
20 Blanking Punch press Body Making 0.02
30 Punching Punch Press Body Making 0.02
40 Scored Opening laser marking LBM Body Making 0.03
50 Curing Oven Curing & Cleaning 0.03
60 Inspection Can inspector Inspection 0.03
70 Riveting & Assembly Assembly m/c Assembly 0.01
80 Packaging Packaging m/c Packaging & Warehousing 0.05
Route Sheet (Tap)Product: Beverage can Part Name: Tap
Raw material:Aluminum Alloy “magnesium &
Manganese” Included
Operation No. Operation Name Machine Department Operation Time
(sec)
10 Blanking Punch press Body Making 0.02
20 Punching Punch Press Body Making 0.02
60 Inspection Can inspector Inspection 0.03
70 Riveting & Assembly Assembly m/c Assembly 0.01
80 Packaging Packaging m/c Packaging & Warehousing 0.05
Assembly Charts• The can consists of two main parts, the body and the end where the facility provides
the body and the end unassembled together and they are assembled and the customer’s factory after filling the can with soda.
End Assembly ChartBody Assembly Chart
Operation & Process Charts• Facility operations depend on two
main parallel manufacturing lines where the body is manufactured and the end is manufactured on another manufacturing line.
Body process Chart End process Chart
Schedule DesignRequired Machines, Annual Demand Plan, Machine Fraction
and Operators
Required Machines
(2)
(3)
Machine Fraction Calculations
Annual Demand Plan• The plan depends on customers’ demands annually, upon which
the whole production effort are concentrated in the way to fulfill customers’ needs.
Customer Demand (Can)Coca-Cola 8.2944 BCarlsberg 4.000 BPepsi 4.2944 BHeineken 4.1472 BTotal Annual Demand 20.736 B
Daily Production 57.6 MHourly Production 2.4 M
Estimated operators No.Machine Required no. / facility No. of operatorsUn Coiler 2 4
Cupping Press 1 4Body maker 1 5
Trimmer 1 4Washers 1 4
Oven 3 9Printer 1 3
Internal coating m/c 1 3Necking m/c 1 4Punch press 2 8
Facility DesignLayout Selection, Production Area, Area Calculations, Parking Area
& Food Service
Facility Layout Selection• The Most Suitable layout for the kind of Can production is
“Product or Line Layout”Justification for this Choice:• All the processing equipment and machines are arranged
according to the sequence of operations of the product. In this type of layout, only one product of one type of products is produced in an operating area. This product is standardized and produced in large quantities.• The raw material is supplied at one end of the line and goes from
one operation to the next quite rapidly with a minimum work in process, storage and material handling.
Production Area Design
Production Area Calculations (Body Making Section)Machine
No. neede
d
length dimensio
n(m)
width dimensio
n(m)
Area(m2)
Clearance1.524*L+1.2
19*W(m)
auxiliary equipme
nt
in process inventor
ytotal
un coiler 1 1.7 5.1 8.67 8.8077 0 11.25 28.7277cupping 1 3 1 3 5.791 0 0 8.791
Body maker 1 2.98 2.5 7.45 7.58902 0 0 15.03902
trimmer 1 1.4 2 2.8 4.5716 0 0 7.3716washer 1 2.45 1.8 4.41 5.928 0 0 10.338
oven 2 2.716 1.89.777
6 6.333384 0 0 16.11098printer 1 2.75 2 5.5 6.629 0 2 14.129internal coating 1 2.45 4.8 11.76 9.585 0 0 21.345necking 1 1.4 2 2.8 4.5716 0 0 7.3716
Inspection 1 4 2.5 10 9.1435 0 0 19.1435Total Area 148.3674
Production Area Calculations (End Making Section)Machine
No. neede
d
length dimensio
n(m)
width dimensio
n(m)
Area(m2)
Clearance1.524*L+1.219*
W(m)
auxiliary equipme
nt
in process inventor
ytotal
Un coiler 1 1.7 5.1 8.67 8.8077 0 11.25 28.7277blanking 1 3 1 3 5.791 0 0 8.791
punch 1 3 1 3 5.791 0 0 8.791scored
opening laser
marking1 2.5 5 12.5 9.905 0 0 22.405
oven 1 2.716 1.8 4.8888 6.333384 0 0 11.2221
8inspection 1 4 2.5 10 9.1435 0 0 19.1435Assembly
& Reviting
1 2 2 4 5.486 0 2 11.486
Total Area 110.566
4
Parking Area• Employees are transported to the facility through facility
buses to ensure showing up on time and to decrease efforts and space waste.• Other officers who reach the facility by their own cars,
the facility provides for them smart parking systems which ensures protection of their cars and space saving and facilitates the trucks movements through the parking, thereby facilitating forwarding cans process.• Smart Parking system is a smart new innovative system
where cars are stored in a vertical manner to save space and energy and protect cars.
Parking Area Calculations
ItemNo. of
required Spaces
Stall length(m)
Stall Width(m)
Angle(degrees)
Outside turning radii
(m)Clearance
(m)Bus 2 12.2 3.7 90 - 4.25
Back-up Spaces 10 2.75 2.75 90 Module Module Width
W2 20.15
Smart Parking system needed Space No. of needed Parking units
Length(m)
Width(m)
Height(m) 6 units of 12 car
capacity unit6.370 5.100 13.500
Parking Layout
Parking Area Design
Food Service Area• Food service area is to provide Full kitchen for employees to
ensure they are getting healthy and sufficient complete meals helping in working circumstances, Service line to serve meals and cafeteria.• Break Duration is 60 minutes per working shift, 60 employee is
served in a period of 3o minutes.Serving shifts time table
Shift BeginsEmployees start to sit
downShift ends
11:00 11:10 11:30
11:20 11:30 11:50
Required Spaces for Food Service Area
Section No. of Employees Required Space (m2)
Cafeteria 60 275Service Line 60 – 7 Served/min 92
Kitchen 60 153Total Required Area 520
Food Service Layout• The Food Service Area is
divided into three main areas Kitchen area, Service Line area and Cafeteria Area
Food Service Area Layout
Material HandlingMass Conveyor and Fork lift
Mass ConveyorMass conveyors are preferred to single conveyors for the transportation of Cans to the Empty Can Riser from the De-palletiser, which will optimize the storage capacity and allow a constant Can flow, reducing the risk of can damage.To transport empty cans made during the production line.
Mass Conveyor
Fork lift• A forklift (also called a lift
truck, a fork truck, or a forklift truck) is a powered industrial truck used to lift and move materials short distances.
• Used to lift Aluminum Coils and Can Pallets.
Fork lift
Conclusion• Facility Design depends mainly on the most optimized
way to save space, energy and efforts, where the facility depends on automated production line and smart operations.