Michigan DOT Concrete Bus TourAugust 13, 20008
Bill Miller, PE, Chief, Quality Assurance Division, West
Bureau of Construction and Materials
10th Annual Concrete Conference
January 27, 2009
![Page 2: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/2.jpg)
www.dot.state.pa.us
10th Annual Concrete Conference
![Page 3: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/3.jpg)
www.dot.state.pa.us
10th Annual Concrete Conference
Two Part Format• Presentation and discussion of projects (1
½ hours)
• Bus Tour of project sites (6 ½ hours)
![Page 4: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/4.jpg)
www.dot.state.pa.us
10th Annual Concrete Conference
Demonstration Projects (Performance Update)
• Dowel bar retrofit alignment verification study
• Deicer study effects on PCC (MichiganTech Transportation
Institute)
![Page 5: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/5.jpg)
www.dot.state.pa.us
Presentation and Discussion
Dowel bar retrofit alignment verification study
Device developed in Germany
Non-destructive quick method to check dowel bar alignments FHWA owns three MIT-Scan II devices can be borrowed through the Concrete Pavement Technology Program (CPTP)
![Page 6: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/6.jpg)
www.dot.state.pa.us
Deicer study of effects
• Determine Long Term Exposure to Magnesium Chloride, Calcium Chloride & Sodium Chloride
• Estimate Potential Reduction in Service Life
on PCC Pavement• Pavement
Performance was Significant Better with Ground Blast Furnace slag or Fly Ash in the Mix
• Sealants Improved Performance, Need to be Reapplied Every 3-5 Years
![Page 7: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/7.jpg)
www.dot.state.pa.us
Pavement Tour
• 4”-6” White-topping – intersections,
collector streets and ramps
![Page 8: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/8.jpg)
www.dot.state.pa.us
Pavement Tour
![Page 9: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/9.jpg)
www.dot.state.pa.us
Observations
White-topping projects• 4-6” deep, construction very similar to
PennDOT. • Intersection reconstruction is almost
entirely white topping and the connecting roadway.
• Rutting issue was eliminated. • Anticipating 20 year pavement life • tour projects in-place 4-10 years with
no performance issues.
![Page 10: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/10.jpg)
www.dot.state.pa.us
Pavements Tour
• 6.5” Concrete Overlays 4 lanes – high truck traffic
![Page 11: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/11.jpg)
www.dot.state.pa.us
Pavement Tour
![Page 12: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/12.jpg)
www.dot.state.pa.us
Observations
Concrete overlays • 6.5” depth unbonded, 1 ½” asphalt over existing
concrete• Minimal spall & joint repairs, only areas with base
failure• Transverse joint alignment is not required• Anticipating 25 year pavement life• Michigan is experiencing very good performance.
![Page 13: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/13.jpg)
www.dot.state.pa.us
Best Practices
• Warranty for materials and workmanship, all projects
• Alternate bidding – currently very limited bituminous bids
• Pavement committee reviews all design & construction changes
![Page 14: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/14.jpg)
www.dot.state.pa.us
Results
Significant Initiatives • Alternate Bidding Procedure
• Warranty Specification
• Pavement Preservation– Overlays
![Page 15: Michigan DOT Concrete Bus Tour August 13, 20008](https://reader036.fdocuments.net/reader036/viewer/2022062501/5681668a550346895dda4a1e/html5/thumbnails/15.jpg)
www.dot.state.pa.us
THANK YOU