Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and...

12
1 © 2018 archib Address 1/90 Cathedral Street, Woolloomooloo, NSW 2011 Education 1993 BSC Arch. (Merit) Newcastle University 1995 BACH Arch. (Honors) Newcastle University Accreditation NSW Registered Architect Reg. No. 7033 Sept 2003 Green Building Council of Australia Associate Professional May 2007+ Courses / Programs Occupational Health and Safety Induction Training For Construction Work General Aug 2006 Green Star Submissions Workshop Nov 2007 AICD Strategy & Risk for Directors Aug 2014 AICD Finance for Directors Aug 2015 Australian Institute of Architects Mentoring Program 2015 Australian Institute of Architects Champions of Change (Charter Signatory) 2015 Associations Green Building Council of Australia Australian Institute of Architects 31523 2011 Australian Institute of Company Directors July 2014 Work Experience 2018+ michael banak architect 2016-2018 Rothelowman, 171 William Street Sydney 2010 - PRINCIPAL 2001-2015 Crone Partners, 364 Kent Street Sydney 2000 - DIRECTOR 1997-2000 Group GSA Architects, William Street Sydney 2000 1994-1997 Crone Associates, 364 Kent Street Sydney 2000 Michael Banak has 20 years of experience working in architectural practices in Australia and abroad. With a focus on large-scale endeavours and the Southeast Asian market, Banak is sought after for his expertise in environmentally sustainable design, high-rise residential and commercial developments, and overseas project collaborations. Banak is a keen promoter of diversity—gender, age and culture—and engaged in various mentoring programs. He believes a leader is only as good as his team.W MB michael banak architect design collaborations Michael Banak CV

Transcript of Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and...

Page 1: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

1© 2018 archib

Address

1/90 Cathedral Street, Woolloomooloo, NSW 2011

Education

1993 BSC Arch. (Merit) Newcastle University

1995 BACH Arch. (Honors) Newcastle University

Accreditation

NSW Registered Architect Reg. No. 7033 Sept 2003

Green Building Council of Australia Associate Professional May 2007+

Courses / Programs

Occupational Health and Safety Induction Training For Construction Work

General Aug 2006

Green Star Submissions Workshop Nov 2007

AICD Strategy & Risk for Directors Aug 2014

AICD Finance for Directors Aug 2015

Australian Institute of Architects Mentoring Program 2015

Australian Institute of Architects Champions of Change (Charter Signatory) 2015

Associations

Green Building Council of Australia

Australian Institute of Architects 31523 2011

Australian Institute of Company Directors July 2014

Work Experience

2018+ michael banak architect

2016-2018 Rothelowman, 171 William Street Sydney 2010 - PRINCIPAL

2001-2015 Crone Partners, 364 Kent Street Sydney 2000 - DIRECTOR

1997-2000 Group GSA Architects, William Street Sydney 2000

1994-1997 Crone Associates, 364 Kent Street Sydney 2000

Michael Banak has 20 years of experience

working in architectural practices in

Australia and abroad. With a focus on

large-scale endeavours and the Southeast

Asian market, Banak is sought after

for his expertise in environmentally

sustainable design, high-rise residential

and commercial developments, and

overseas project collaborations. Banak

is a keen promoter of diversity—gender,

age and culture—and engaged in various

mentoring programs. He believes a leader

is only as good as his team.W

MB

michael banak architect

design collaborations

Michael Banak CV

Page 2: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

2© 2018 archib

Bankstown Central, Bankstown2016+ — Planning Proposal & Concept DAMixed-use masterplan project in Bankstown. The development

includes residential, commercial, aged care, independant living

units, education and innovation hub, student housing and hotel.

My role was Project Principal, fee negotiation, design, strategies

for maximising the sites potential, coordination of documentation

and presentations to the client in Sydney and Canterbury

Bankstown Council. Client Vicinity Centres

Michael Banak CV

Mount Gravatt, ATO2017 — Tender BidTender bid for 50,000m2 NLA, commercial office building in

Brisbane. Large floor plates at 2,500m2 NLA and targetting 5

Star Green Star certification. My role was Project Principal, client

liaison, coordination of design team, presentations to the client.

Client Scentre Group

Chermside SRG, Brisbane2017 — Design ConceptSRG commercial office development above Chermside Shopping

Centre. A grade office space wrapped around an atrium

that connected floors and encouraged interaction through

a communication stair. My role was Project Principal, fee

negotiation, client liaison, design review and presentations to the

client. Client Scentre Group

The Gables Town Centre2017+ — Design CompetitionDesign Competition for a Town Centre in Box Hill. Retail shopping

centre, commercial, residential and local community centre

functions overlooking a landscaped park and lake. My role

was Project Principal, fee & contract negotiations, design team

coordination, presentations to the client and presentation of

winning scheme. Client Celestino

Page 3: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

3© 2018 archib

100 South Creek Road, Cromer2016+ — Planning Proposal ConceptConcept Design to change the LEP from commercial to residential

use. Apartment buildings and townhouses designed around

significant trees on the site to be retained. My role was Project

Principal, coordination of design team, site strategy options, fee

negotiations and presentations to the client. Client EG Funds

Management

Michael Banak CV

Integrated Resort, Philippines2017 — Masterplan ConceptMasterplan design for a mixed use development including

residential condominiums, hotel, retail, shopping centre, casino

and entertainment hub. My role was Project Principal, client

liaison, coordination of design team, fee negotiation, securing

project, site strategy, presentations to the client in Manila. Client

MPA

Tattersalls Club, Sydney2017 — Interior DesignInterior design of dining area and pool room for the Tattersals

Club. Concept design and tender documentation due for

construction completion Feb 18. My role was Project Principal,

client liaison, fee negotiation, coordination of interior design

team, presentations to the client. Client Tattersalls Club

Rothelowman — Principal2016

Page 4: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

4© 2018 archib

12 Help Street, Chatswood.2015+ — FeasibilityFeasibility Study for prime residential and commercial

development located in Chatswood. GFA 36,300m2. 270

apartments over 38 levels including 10,000m2 of podium

commercial & retail. My role was Project Director, securing

project, fee negotiation, design, strategy for maximising the

sites potential, coordination of documentation, engagement of

planner and presentations to the client in Sydney. Client NMBE

Pty Ltd.

Michael Banak CV

333 Kent Street. 2015 — CompetitionDesign Excellence Competition for Sydney City Council,

site located in Kent Street, Sydney. GFA 20,000m2.

70 high end apartments, 200 room hotel, retail and car

parking. My role was Project/ Design Director, securing

project, coordination of design team & consultants,

presentations to the client and council. Client Maville Bay

505 George Street. 2014+ — Planning Proposal & Stage 1 DAStage 1 Development Application and Planning Proposal,

George Street, Sydney. Planning Proposal to increase the

height control from 150m to 265m. My role was Project/

Design Director, securing project, fee negotiation, client

liaison, and presentations to the client and Sydney City

Council. Client Coombes Property Group and Mirvac

Yeung McKowen House. 2014+ — Design DevelopmentMulti-level hi-end house located in Cebu, Philippines.

GFA 2,000m2. Landscape areas, car parking for 12

cars, guest rooms, wet edge pool and 4 bedrooms

including library and formal dining. My role is Project/

Design Director, securing project, fee negotiation, design,

coordination of documentation, workshop sessions in

Cebu and presentations to the client. Client Carla Yeung

and Chris McKowen

Page 5: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

5© 2018 archib

Michael Banak CV

The Alcoves.2014 — Design Development & MarketingMulti-level Premier Grade residential towers located

in Cebu, Philippines. GFA 60,000m2. 460 high end

apartments, retail and car parking. My role was Project/

Design Director, securing project, fee negotiation, design,

coordination of documentation, workshop sessions in

Cebu and Manila and presentations to the client. Client

AYALA Land Premier

Mandaue Master Plan.2014+ — Stage 1 Design20 Hectare foreshore Master Plan located in Cebu,

Philippines. GFA 1,200,000m2. Residential, Commercial,

Park Land, Retail Shopping Centre, Foreshore Promenade

and Car Parking. My role is Project/ Design Director,

securing project, fee negotiation, design, coordination of

documentation, workshop sessions in Cebu and presenta-

tions to the client. Client Hongkong Land and TAFT

Property Venture Capital

Project MEGABLOCK. 2013-2014 — ConstructionFour tower, multi-level BPO commercial and retail

development, Alabang, Philippines. GFA 175,000m2.

Typical Floor Plate GFA 2,000m2. My role was Project/

Design Director, securing project, fee negotiation,

coordination of documentation, workshop sessions in

Manila and presentations to the client. Client Filinvest

Taft East Gate. 2013 — ConstructionFour multi-level residential towers located in Cebu,

Philippines. GFA 225,000m2. 4,000 mid-level grade

apartments. My role was Project/ Design Director,

securing project, fee negotiation, design, coordination of

documentation, workshop sessions in Cebu and presenta-

tions to the client. Client TAFT Property Venture Capital

Page 6: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

6© 2018 archib

Promotion — ASIC Director & Board Member2013, Crone Partners

Michael Banak CV

128 Nivel Hills. 2013-2014 — ConstructionTwo multi-level Premier Grade residential towers located

in Cebu, Philippines. GFA 71,000m2. 550 high end

apartments, retail and car parking. My role was Project/

Design Director, securing project, fee negotiation, design,

coordination of documentation, workshop sessions in

Cebu and presentations to the client. Client Diamond

Hiland Inc.

Broadway & Greenwood Plaza Shopping Centres, Sydney. 2012-2013 — Construction CompleteMaster plan works for major refurbishment of Broadway

Shopping Centre and Greenwood Plaza Shopping Centre.

Projects include; Arrival Zone, Food Court, Amenities

Upgrade, Respite Seating, Ceiling and Lighting Design.

My role was Project/ Design Director, securing project,

fee negotiation, design and coordination of design team,

presentation to Client Groups and Centre Management.

Client Mirvac

Garden Towers, Philippines. 2011 — ConstructionTwo tower multi-level Premier Grade residential

towers located in Makati City. GFA 70,000m2. 630

high end apartments. My role was Project Director,

securing project, fee negotiation, design, coordination

of documentation, workshop sessions in Manila and

presentations to the client. Client AYALA Land Premier

180 B Ann Street, Brisbane. 2011-2014+ — Construction 34 Level A grade commercial tower located in Brisbane.

Project Cost $270m. NLA 60,000m2. 6 Star Green Star

certification. My role was Design Director during the

design phases of the project. I coordinated the Design

Team and presented to the client various packages of

work including, Building Envelope, Façade, Podium, Lobby,

Food Court, Amenities. Review of detailed documentation.

Presentations to the client and Authorities. Client DAISHO

Page 7: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

7© 2018 archib

Promotion — Studio Director, Crone2011

Promotion — Practice Director, Crone2011

Michael Banak CV

Mount Hagen Urban Master Plan Projects, Papua New Guinea2010 — TenderEngaged by the Western Highlands Provincial Government

to provide Master Plans for the Mount Hagen City

Precinct, Airport Precinct, Sports Precinct and a number

of key Infrastructure Projects. Total GFA 160,000m2.

Crone Partners were Lead Consultant engaging all

consultants and managing the process. The Mount Hagen

City Precinct included the design of a New Government

Building & Provincial Chambers. 4 level Grade A office

building and provincial chambers with capacity for

80 people. My role was Project Architect, designer,

coordination of consultants & presentations to the clients

and key stakeholders in Papua New Guinea. Client

Western Highlands Provincial Government.

Waigani Road, Papua New Guinea 2010 — Concept designFeasibility study for Grade A commercial development in

Waigaini. 5 levels including basement parking and retail.

GFA 20,000m2. My role was Project Architect, designer

and coordination of presentation documents. Client

Nambawan Super.

Ela Makana, Papua New Guinea. 2010 — Concept designFeasibility study for luxury housing in Port Moresby.

Apartment and Individual housing options investigated. My

role was Project Architect, designer and coordination of

presentation documents. Client Nambawan Super.

Hunter Street, Papua New Guinea. 2010 — Concept designFeasibility study for luxury housing in Port Moresby. 44

apartments and facilities over 11 levels. GFA 12,000m2.

My role was Project Architect, designer and coordination

of presentation documents. Client Nambawan Super.

Page 8: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

8© 2018 archib

Michael Banak CV

Boroko, Papua New Guinea. 2009–2010 — Tender5 level A Grade office development. GFA 6,500m2.

Target LEED Silver rating. My role was Project Architect,

Designer, coordination of consultants, Management of

documentation team, developing the design from Concept

through to Planning Approval stages. Client Nambawan

Super.

HNSW, Newcastle. 2009–2010 — Construction CompleteHNSW projects in Newcastle for Bovis Lend Lease, North

Western Sydney for Watpac and Armidale for Capital

Insight. My role was design and management of the

projects for BLL, Watpac and Capital Insight Project

Managers during design, documentation and construction

phases. BASIX environmental rating compliance. Client

HNSW

Arya Residents, Philippines. 2009–2010 — Construction Two multi-level Premier Grade residential towers

located at Fort Bonifacio Global City near Makati City.

GFA 76,000m2. 640 Apartments. Target LEED Gold

rating & BERDE rating. My role was Project Director,

securing project, fee negotiation, design, coordination

of documentation, workshop sessions in Manila and

presentations to the client in the Philippines. Client

ARTHA Land

333 George Street, Sydney. 2009–2010 — Development ApplicationProject Cost $60 Million. GFA 19,000m2. 13 level

A grade office building. Designed to DA level for

refurbishment option re-using existing structure and

lift-core. 4.5 star NABERS & target 5 Star Green Star

rating. My role was project architect, façade design,

coordination of consultants, advising and managing the

documentation team and presentations to the client and

Sydney City Council. Client Charter Hall

Page 9: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

9© 2018 archib

Michael Banak CV

Project Logan, Philippines. 2008–2009 — Concept Masterplan10 hectare Master plan project for AYALA land. Total

GFA 600,000m2. My role was design, coordination

of documentation, workshop sessions in Manila and

presentations to the client in the Philippines. Client AYALA

Land Inc.

DFC Training Centre, Dubai. 2008–2009 — Concept Design3 level Automotive and Corporate Training Facilities for

All Futtaim and Dubai Festival City. My role was design,

preparation of Feasibility and Concept Design studies.

George Street Parramatta Competition, Sydney. 2008 — CompetitionProject Cost $90 Million. 21 level office tower Design

Competition. My role was design and management of the

Design Submission. I was involved in presentations to

the client and Parramatta City Council’s Design Advisory

Committee. Client Eureka

Hassall Street Parramatta Competition, Sydney. 2008 — CompetitionProject Cost $80 Million. 20 level office tower Design

Competition. My role was design and management of the

Design Submission. I was involved in presentations to

the client and Parramatta City Council’s Design Advisory

Committee. Client Grosvenor. Builder Leighton Construc-

tions.

BGC Corporate Studios, Philippines. 2007 — Schematic Design25 level commercial tower for AYALA Land and the

Philippine Stock Exchange. I was responsible for design

and management of the project through Concept and

Schematic Design phases and presentations to the client

through a series of workshops in Makati, Philippines. Client

AYALA Land Inc.

Page 10: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

10© 2018 archib

Michael Banak CV

One Serendra, Makati City Philippines. 2006 — Construction CompleteTwo multi-level residential towers located in the

Philippines. The towers are 48 and 52 levels located

in Fort Bonifacio Global City. GFA 90,000m2. Total of

600 apartments including a “Garden Bridge” residential

building spanning between the 2 towers. My involvement

was design and management of the project through the

early design stages and presentation of the design to

the client through a series of workshops in Makati. Client

AYALA Land Premier.

WSQ ETFE Roof, Sydney. 2006–2008 — Schematic DesignProject Cost $4 million. Lightweight ETFE (Ethyl Tetra

Flouro Ethylene) “bubble roof” enclosure for the piazza

public areas at WSQ to mitigate wind problems on site. My

role was Project Architect and Designer. I was involved in

presentations to the client and council including meetings

with the Design Advisory Committee at Sydney City

Council. Client MPXD. Sub contractor – Vector Foiltec

275 George Street, Brisbane2006–2008 — Construction CompleteProject Cost $140 Million. GFA 41,000m2. 33 level PCA

“Grade A” office tower in Brisbane. 4.5 Star NABERS

& 5 Star Green Star Design and As Built certification.

My role was Project Architect and Façade Designer. My

role changed to an advisory role directing the managing

architect during Construction Phase and my focus was

Facade and Lobby design. Client Charter Hall. Builder

Watpac

Sky Vue, Sydney.2005–2009 — Construction CompleteProject Cost $60 Million. 12 level A grade office tower

with internal glazed atrium and heritage façade on George

Street. GFA 18,000m2. My role was Project Architect

and I worked through the detail design of facades, internal

atrium, glass lift enclosures and shop fronts. I provided

Defects Inspections and reports in 2009. Client Kordella.

Builder Grocon

Page 11: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

11© 2018 archib

Promotion — Associate Director 2005, Crone

Promotion — Associate 2002, Crone

Michael Banak CV

World Square Retail, Sydney.2002-2004 — Construction CompleteProject Cost $90 Million. 14 level podium building. My role

was Project Architect/ Designer. I managed the design

and documentation of the facades to the podium areas

from concept stage through to construction. I managed

the design and documentation of the Interior Design

elements for review by Multiplex Developments (MPXD).

My roles included coordination of consultants, builders,

sub-contractors and presentations to the client. Cient

MPXD. Builder MPXC

Mixed-Use Development, Cremorne. 2001 — Schematic DesignProject Cost $10 million. 6 level mixed–use development.

The development comprised of 30 apartments, medical

centre, restaurant/café and retail shops located in a

prominent location on Military Road Cremorne. I worked

on the project for 12 months through a number of design

changes including a re-design after the client purchased

the adjacent site. My role was Project Architect and

Designer under the guidance of the project director. Client

Giselle and Andrew Kaunitz

Ernst & Young Centre, Sydney CBD. 2001-2004 — Construction CompleteProject Cost including retail $270 million. 32 level A

grade office tower. GFA 135,000m2. 4.5 Star NABERS

rating. My role was Project Architect/ Designer of the

facades for the tower and podium. The role included work

on the change of use design competition for the tower

from residential to commercial. I was responsible for the

coordination and production of trade tender packages

for Multiplex Constructions (MPXC) under a Design

Construction Contract. Client Multiplex Developments.

Builder Multiplex Constructions

Page 12: Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and Planning Proposal, George Street, Sydney. Planning Proposal to increase the height

12© 2018 archib

Michael Banak CV

Opryland Hotel and Convention Centre USA 1999 — Construction CompleteProject Cost US$90 million approx. I worked for Group

GSA from Hnedak Bobo Group offices in Memphis

Tennessee for 9 months. My roles included design,

documentation, services coordination and coordination

of documentation between the offices. I also assisted

Hnedak Bobo Group design team in the detailing of the

Convention Centre and Hotel façade systems. Client

Gaylord Entertainment

Telstra Office Tower & Retail 1996-1999 — Construction CompleteProject cost $170 million. 30 level office tower. My roles

included design and documentation of the facades for the

tower and podium areas. I worked from concept design

through to construction documentation. My primary focus

was the design and documentation of the Sydney Arcade

retail street connecting the Pitt Street Mall with King

Street. Builder Grocon.

Aurora Place & 155 Macquarie Street 1999-2000 — Construction CompleteProject cost $200 and $70 million respectively.

Group GSA were commissioned to document both the

residential and office towers designed by Renzo Piano

Building Workshop (RPBW). My role was to manage the

Design Development documentation for the penthouse

apartments located on roof levels 16 to 18. I worked with

RPBW Sydney and Genoa offices reviewing façade details

and junctions between the exterior façade (RPBW) and

the interior design (Group GSA). I produced detail design

sketches and construction documentation for review by

both Bovis Lend Lease and Mirvac. The apartments sold

for $6.8 and $7.4 million each. Client Bovis Lend Lease.

Builder Bovis Lend Lease.