Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and...
Transcript of Michael Banak CV · 2014+ — Planning Proposal & Stage 1 DA Stage 1 Development Application and...
1© 2018 archib
Address
1/90 Cathedral Street, Woolloomooloo, NSW 2011
Education
1993 BSC Arch. (Merit) Newcastle University
1995 BACH Arch. (Honors) Newcastle University
Accreditation
NSW Registered Architect Reg. No. 7033 Sept 2003
Green Building Council of Australia Associate Professional May 2007+
Courses / Programs
Occupational Health and Safety Induction Training For Construction Work
General Aug 2006
Green Star Submissions Workshop Nov 2007
AICD Strategy & Risk for Directors Aug 2014
AICD Finance for Directors Aug 2015
Australian Institute of Architects Mentoring Program 2015
Australian Institute of Architects Champions of Change (Charter Signatory) 2015
Associations
Green Building Council of Australia
Australian Institute of Architects 31523 2011
Australian Institute of Company Directors July 2014
Work Experience
2018+ michael banak architect
2016-2018 Rothelowman, 171 William Street Sydney 2010 - PRINCIPAL
2001-2015 Crone Partners, 364 Kent Street Sydney 2000 - DIRECTOR
1997-2000 Group GSA Architects, William Street Sydney 2000
1994-1997 Crone Associates, 364 Kent Street Sydney 2000
Michael Banak has 20 years of experience
working in architectural practices in
Australia and abroad. With a focus on
large-scale endeavours and the Southeast
Asian market, Banak is sought after
for his expertise in environmentally
sustainable design, high-rise residential
and commercial developments, and
overseas project collaborations. Banak
is a keen promoter of diversity—gender,
age and culture—and engaged in various
mentoring programs. He believes a leader
is only as good as his team.W
MB
michael banak architect
design collaborations
Michael Banak CV
2© 2018 archib
Bankstown Central, Bankstown2016+ — Planning Proposal & Concept DAMixed-use masterplan project in Bankstown. The development
includes residential, commercial, aged care, independant living
units, education and innovation hub, student housing and hotel.
My role was Project Principal, fee negotiation, design, strategies
for maximising the sites potential, coordination of documentation
and presentations to the client in Sydney and Canterbury
Bankstown Council. Client Vicinity Centres
Michael Banak CV
Mount Gravatt, ATO2017 — Tender BidTender bid for 50,000m2 NLA, commercial office building in
Brisbane. Large floor plates at 2,500m2 NLA and targetting 5
Star Green Star certification. My role was Project Principal, client
liaison, coordination of design team, presentations to the client.
Client Scentre Group
Chermside SRG, Brisbane2017 — Design ConceptSRG commercial office development above Chermside Shopping
Centre. A grade office space wrapped around an atrium
that connected floors and encouraged interaction through
a communication stair. My role was Project Principal, fee
negotiation, client liaison, design review and presentations to the
client. Client Scentre Group
The Gables Town Centre2017+ — Design CompetitionDesign Competition for a Town Centre in Box Hill. Retail shopping
centre, commercial, residential and local community centre
functions overlooking a landscaped park and lake. My role
was Project Principal, fee & contract negotiations, design team
coordination, presentations to the client and presentation of
winning scheme. Client Celestino
3© 2018 archib
100 South Creek Road, Cromer2016+ — Planning Proposal ConceptConcept Design to change the LEP from commercial to residential
use. Apartment buildings and townhouses designed around
significant trees on the site to be retained. My role was Project
Principal, coordination of design team, site strategy options, fee
negotiations and presentations to the client. Client EG Funds
Management
Michael Banak CV
Integrated Resort, Philippines2017 — Masterplan ConceptMasterplan design for a mixed use development including
residential condominiums, hotel, retail, shopping centre, casino
and entertainment hub. My role was Project Principal, client
liaison, coordination of design team, fee negotiation, securing
project, site strategy, presentations to the client in Manila. Client
MPA
Tattersalls Club, Sydney2017 — Interior DesignInterior design of dining area and pool room for the Tattersals
Club. Concept design and tender documentation due for
construction completion Feb 18. My role was Project Principal,
client liaison, fee negotiation, coordination of interior design
team, presentations to the client. Client Tattersalls Club
Rothelowman — Principal2016
4© 2018 archib
12 Help Street, Chatswood.2015+ — FeasibilityFeasibility Study for prime residential and commercial
development located in Chatswood. GFA 36,300m2. 270
apartments over 38 levels including 10,000m2 of podium
commercial & retail. My role was Project Director, securing
project, fee negotiation, design, strategy for maximising the
sites potential, coordination of documentation, engagement of
planner and presentations to the client in Sydney. Client NMBE
Pty Ltd.
Michael Banak CV
333 Kent Street. 2015 — CompetitionDesign Excellence Competition for Sydney City Council,
site located in Kent Street, Sydney. GFA 20,000m2.
70 high end apartments, 200 room hotel, retail and car
parking. My role was Project/ Design Director, securing
project, coordination of design team & consultants,
presentations to the client and council. Client Maville Bay
505 George Street. 2014+ — Planning Proposal & Stage 1 DAStage 1 Development Application and Planning Proposal,
George Street, Sydney. Planning Proposal to increase the
height control from 150m to 265m. My role was Project/
Design Director, securing project, fee negotiation, client
liaison, and presentations to the client and Sydney City
Council. Client Coombes Property Group and Mirvac
Yeung McKowen House. 2014+ — Design DevelopmentMulti-level hi-end house located in Cebu, Philippines.
GFA 2,000m2. Landscape areas, car parking for 12
cars, guest rooms, wet edge pool and 4 bedrooms
including library and formal dining. My role is Project/
Design Director, securing project, fee negotiation, design,
coordination of documentation, workshop sessions in
Cebu and presentations to the client. Client Carla Yeung
and Chris McKowen
5© 2018 archib
Michael Banak CV
The Alcoves.2014 — Design Development & MarketingMulti-level Premier Grade residential towers located
in Cebu, Philippines. GFA 60,000m2. 460 high end
apartments, retail and car parking. My role was Project/
Design Director, securing project, fee negotiation, design,
coordination of documentation, workshop sessions in
Cebu and Manila and presentations to the client. Client
AYALA Land Premier
Mandaue Master Plan.2014+ — Stage 1 Design20 Hectare foreshore Master Plan located in Cebu,
Philippines. GFA 1,200,000m2. Residential, Commercial,
Park Land, Retail Shopping Centre, Foreshore Promenade
and Car Parking. My role is Project/ Design Director,
securing project, fee negotiation, design, coordination of
documentation, workshop sessions in Cebu and presenta-
tions to the client. Client Hongkong Land and TAFT
Property Venture Capital
Project MEGABLOCK. 2013-2014 — ConstructionFour tower, multi-level BPO commercial and retail
development, Alabang, Philippines. GFA 175,000m2.
Typical Floor Plate GFA 2,000m2. My role was Project/
Design Director, securing project, fee negotiation,
coordination of documentation, workshop sessions in
Manila and presentations to the client. Client Filinvest
Taft East Gate. 2013 — ConstructionFour multi-level residential towers located in Cebu,
Philippines. GFA 225,000m2. 4,000 mid-level grade
apartments. My role was Project/ Design Director,
securing project, fee negotiation, design, coordination of
documentation, workshop sessions in Cebu and presenta-
tions to the client. Client TAFT Property Venture Capital
6© 2018 archib
Promotion — ASIC Director & Board Member2013, Crone Partners
Michael Banak CV
128 Nivel Hills. 2013-2014 — ConstructionTwo multi-level Premier Grade residential towers located
in Cebu, Philippines. GFA 71,000m2. 550 high end
apartments, retail and car parking. My role was Project/
Design Director, securing project, fee negotiation, design,
coordination of documentation, workshop sessions in
Cebu and presentations to the client. Client Diamond
Hiland Inc.
Broadway & Greenwood Plaza Shopping Centres, Sydney. 2012-2013 — Construction CompleteMaster plan works for major refurbishment of Broadway
Shopping Centre and Greenwood Plaza Shopping Centre.
Projects include; Arrival Zone, Food Court, Amenities
Upgrade, Respite Seating, Ceiling and Lighting Design.
My role was Project/ Design Director, securing project,
fee negotiation, design and coordination of design team,
presentation to Client Groups and Centre Management.
Client Mirvac
Garden Towers, Philippines. 2011 — ConstructionTwo tower multi-level Premier Grade residential
towers located in Makati City. GFA 70,000m2. 630
high end apartments. My role was Project Director,
securing project, fee negotiation, design, coordination
of documentation, workshop sessions in Manila and
presentations to the client. Client AYALA Land Premier
180 B Ann Street, Brisbane. 2011-2014+ — Construction 34 Level A grade commercial tower located in Brisbane.
Project Cost $270m. NLA 60,000m2. 6 Star Green Star
certification. My role was Design Director during the
design phases of the project. I coordinated the Design
Team and presented to the client various packages of
work including, Building Envelope, Façade, Podium, Lobby,
Food Court, Amenities. Review of detailed documentation.
Presentations to the client and Authorities. Client DAISHO
7© 2018 archib
Promotion — Studio Director, Crone2011
Promotion — Practice Director, Crone2011
Michael Banak CV
Mount Hagen Urban Master Plan Projects, Papua New Guinea2010 — TenderEngaged by the Western Highlands Provincial Government
to provide Master Plans for the Mount Hagen City
Precinct, Airport Precinct, Sports Precinct and a number
of key Infrastructure Projects. Total GFA 160,000m2.
Crone Partners were Lead Consultant engaging all
consultants and managing the process. The Mount Hagen
City Precinct included the design of a New Government
Building & Provincial Chambers. 4 level Grade A office
building and provincial chambers with capacity for
80 people. My role was Project Architect, designer,
coordination of consultants & presentations to the clients
and key stakeholders in Papua New Guinea. Client
Western Highlands Provincial Government.
Waigani Road, Papua New Guinea 2010 — Concept designFeasibility study for Grade A commercial development in
Waigaini. 5 levels including basement parking and retail.
GFA 20,000m2. My role was Project Architect, designer
and coordination of presentation documents. Client
Nambawan Super.
Ela Makana, Papua New Guinea. 2010 — Concept designFeasibility study for luxury housing in Port Moresby.
Apartment and Individual housing options investigated. My
role was Project Architect, designer and coordination of
presentation documents. Client Nambawan Super.
Hunter Street, Papua New Guinea. 2010 — Concept designFeasibility study for luxury housing in Port Moresby. 44
apartments and facilities over 11 levels. GFA 12,000m2.
My role was Project Architect, designer and coordination
of presentation documents. Client Nambawan Super.
8© 2018 archib
Michael Banak CV
Boroko, Papua New Guinea. 2009–2010 — Tender5 level A Grade office development. GFA 6,500m2.
Target LEED Silver rating. My role was Project Architect,
Designer, coordination of consultants, Management of
documentation team, developing the design from Concept
through to Planning Approval stages. Client Nambawan
Super.
HNSW, Newcastle. 2009–2010 — Construction CompleteHNSW projects in Newcastle for Bovis Lend Lease, North
Western Sydney for Watpac and Armidale for Capital
Insight. My role was design and management of the
projects for BLL, Watpac and Capital Insight Project
Managers during design, documentation and construction
phases. BASIX environmental rating compliance. Client
HNSW
Arya Residents, Philippines. 2009–2010 — Construction Two multi-level Premier Grade residential towers
located at Fort Bonifacio Global City near Makati City.
GFA 76,000m2. 640 Apartments. Target LEED Gold
rating & BERDE rating. My role was Project Director,
securing project, fee negotiation, design, coordination
of documentation, workshop sessions in Manila and
presentations to the client in the Philippines. Client
ARTHA Land
333 George Street, Sydney. 2009–2010 — Development ApplicationProject Cost $60 Million. GFA 19,000m2. 13 level
A grade office building. Designed to DA level for
refurbishment option re-using existing structure and
lift-core. 4.5 star NABERS & target 5 Star Green Star
rating. My role was project architect, façade design,
coordination of consultants, advising and managing the
documentation team and presentations to the client and
Sydney City Council. Client Charter Hall
9© 2018 archib
Michael Banak CV
Project Logan, Philippines. 2008–2009 — Concept Masterplan10 hectare Master plan project for AYALA land. Total
GFA 600,000m2. My role was design, coordination
of documentation, workshop sessions in Manila and
presentations to the client in the Philippines. Client AYALA
Land Inc.
DFC Training Centre, Dubai. 2008–2009 — Concept Design3 level Automotive and Corporate Training Facilities for
All Futtaim and Dubai Festival City. My role was design,
preparation of Feasibility and Concept Design studies.
George Street Parramatta Competition, Sydney. 2008 — CompetitionProject Cost $90 Million. 21 level office tower Design
Competition. My role was design and management of the
Design Submission. I was involved in presentations to
the client and Parramatta City Council’s Design Advisory
Committee. Client Eureka
Hassall Street Parramatta Competition, Sydney. 2008 — CompetitionProject Cost $80 Million. 20 level office tower Design
Competition. My role was design and management of the
Design Submission. I was involved in presentations to
the client and Parramatta City Council’s Design Advisory
Committee. Client Grosvenor. Builder Leighton Construc-
tions.
BGC Corporate Studios, Philippines. 2007 — Schematic Design25 level commercial tower for AYALA Land and the
Philippine Stock Exchange. I was responsible for design
and management of the project through Concept and
Schematic Design phases and presentations to the client
through a series of workshops in Makati, Philippines. Client
AYALA Land Inc.
10© 2018 archib
Michael Banak CV
One Serendra, Makati City Philippines. 2006 — Construction CompleteTwo multi-level residential towers located in the
Philippines. The towers are 48 and 52 levels located
in Fort Bonifacio Global City. GFA 90,000m2. Total of
600 apartments including a “Garden Bridge” residential
building spanning between the 2 towers. My involvement
was design and management of the project through the
early design stages and presentation of the design to
the client through a series of workshops in Makati. Client
AYALA Land Premier.
WSQ ETFE Roof, Sydney. 2006–2008 — Schematic DesignProject Cost $4 million. Lightweight ETFE (Ethyl Tetra
Flouro Ethylene) “bubble roof” enclosure for the piazza
public areas at WSQ to mitigate wind problems on site. My
role was Project Architect and Designer. I was involved in
presentations to the client and council including meetings
with the Design Advisory Committee at Sydney City
Council. Client MPXD. Sub contractor – Vector Foiltec
275 George Street, Brisbane2006–2008 — Construction CompleteProject Cost $140 Million. GFA 41,000m2. 33 level PCA
“Grade A” office tower in Brisbane. 4.5 Star NABERS
& 5 Star Green Star Design and As Built certification.
My role was Project Architect and Façade Designer. My
role changed to an advisory role directing the managing
architect during Construction Phase and my focus was
Facade and Lobby design. Client Charter Hall. Builder
Watpac
Sky Vue, Sydney.2005–2009 — Construction CompleteProject Cost $60 Million. 12 level A grade office tower
with internal glazed atrium and heritage façade on George
Street. GFA 18,000m2. My role was Project Architect
and I worked through the detail design of facades, internal
atrium, glass lift enclosures and shop fronts. I provided
Defects Inspections and reports in 2009. Client Kordella.
Builder Grocon
11© 2018 archib
Promotion — Associate Director 2005, Crone
Promotion — Associate 2002, Crone
Michael Banak CV
World Square Retail, Sydney.2002-2004 — Construction CompleteProject Cost $90 Million. 14 level podium building. My role
was Project Architect/ Designer. I managed the design
and documentation of the facades to the podium areas
from concept stage through to construction. I managed
the design and documentation of the Interior Design
elements for review by Multiplex Developments (MPXD).
My roles included coordination of consultants, builders,
sub-contractors and presentations to the client. Cient
MPXD. Builder MPXC
Mixed-Use Development, Cremorne. 2001 — Schematic DesignProject Cost $10 million. 6 level mixed–use development.
The development comprised of 30 apartments, medical
centre, restaurant/café and retail shops located in a
prominent location on Military Road Cremorne. I worked
on the project for 12 months through a number of design
changes including a re-design after the client purchased
the adjacent site. My role was Project Architect and
Designer under the guidance of the project director. Client
Giselle and Andrew Kaunitz
Ernst & Young Centre, Sydney CBD. 2001-2004 — Construction CompleteProject Cost including retail $270 million. 32 level A
grade office tower. GFA 135,000m2. 4.5 Star NABERS
rating. My role was Project Architect/ Designer of the
facades for the tower and podium. The role included work
on the change of use design competition for the tower
from residential to commercial. I was responsible for the
coordination and production of trade tender packages
for Multiplex Constructions (MPXC) under a Design
Construction Contract. Client Multiplex Developments.
Builder Multiplex Constructions
12© 2018 archib
Michael Banak CV
Opryland Hotel and Convention Centre USA 1999 — Construction CompleteProject Cost US$90 million approx. I worked for Group
GSA from Hnedak Bobo Group offices in Memphis
Tennessee for 9 months. My roles included design,
documentation, services coordination and coordination
of documentation between the offices. I also assisted
Hnedak Bobo Group design team in the detailing of the
Convention Centre and Hotel façade systems. Client
Gaylord Entertainment
Telstra Office Tower & Retail 1996-1999 — Construction CompleteProject cost $170 million. 30 level office tower. My roles
included design and documentation of the facades for the
tower and podium areas. I worked from concept design
through to construction documentation. My primary focus
was the design and documentation of the Sydney Arcade
retail street connecting the Pitt Street Mall with King
Street. Builder Grocon.
Aurora Place & 155 Macquarie Street 1999-2000 — Construction CompleteProject cost $200 and $70 million respectively.
Group GSA were commissioned to document both the
residential and office towers designed by Renzo Piano
Building Workshop (RPBW). My role was to manage the
Design Development documentation for the penthouse
apartments located on roof levels 16 to 18. I worked with
RPBW Sydney and Genoa offices reviewing façade details
and junctions between the exterior façade (RPBW) and
the interior design (Group GSA). I produced detail design
sketches and construction documentation for review by
both Bovis Lend Lease and Mirvac. The apartments sold
for $6.8 and $7.4 million each. Client Bovis Lend Lease.
Builder Bovis Lend Lease.