MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o...

13
MICE CM January 2009 Jean-Sébastien Graulich Slide 1 Detector DAQ Issues Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End Electronics o Schedule Milestones o Summary Jean-Sebastien Graulich, Geneva

Transcript of MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o...

Page 1: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 1

Detector DAQ IssuesDetector DAQ Issues

o Achievements Since CM23

o Detector DAQ

o Trigger

o Online Software

o Front End Electronics

o Schedule Milestones

o Summary

Jean-Sebastien Graulich, Geneva

Page 2: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Achievements since Achievements since CM22CM22

TOF1 included in the DAQ and in the triggerTOF1 included in the DAQ and in the trigger New flashADC (500MHz) installed for CKOVNew flashADC (500MHz) installed for CKOV Computer Clock synchronization fixedComputer Clock synchronization fixed

Not 100% satisfactory: PCs are synchronized to each other but not to the outside world (firewall issue)

Slow progress in including the target DAQ and Slow progress in including the target DAQ and CAM into the online Data StreamCAM into the online Data Stream

Progress has been slower than foreseenProgress has been slower than foreseen

MICE CM January 2009 Jean-Sébastien Graulich Slide 2

Page 3: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Detector DAQ IssuesDetector DAQ Issues

Known issuesKnown issues Limit on the number of particle events

From DAQ itselfs ( about 200 Particles/Spill )Was expected

Technical solutions exist From Online Monitoring ( about 40 Particles per Spill )

Not expected

Need more investigations

Event reconstruction Occasional and marginal mismatch between the number

of particle triggers in different VME boards Recently, dramatic mismatch between the number of

particle triggers in the two crates for some runs

-> Serious Event building problem !

Need more investigations

Interface with EPICS becomes a top priorityInterface with EPICS becomes a top priority

MICE CM January 2009 Jean-Sébastien Graulich Slide 3

Page 4: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Detector DAQ IssuesDetector DAQ Issues

Feed back from userFeed back from user Need better handling of DAQ crashes Need loud, emphatic, and unambiguous

indicators that data are or are not being recorded.

MICE CM January 2009 Jean-Sébastien Graulich Slide 4

Page 5: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 5

Target DAQ issuesTarget DAQ issues

Progress slowed down Progress slowed down Need consistent integration with the stand alone target

DAQWe want a common software basis for file read/write operations

Target DAQ under deep revisionTarget DAQ under deep revision

Page 6: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Trigger IssuesTrigger Issues

MICE CM January 2009 Jean-Sébastien Graulich Slide 6

TOF0 and TOF1 trigger implementedTOF0 and TOF1 trigger implemented Particle Trigger selection by hardwareParticle Trigger selection by hardware

There is a plan to implement software selectionNot a priority for the moment

Particle Trigger pre-scaling Particle Trigger pre-scaling Needed because of limitation on the DAQ input

rate Need hardware intervention

Not fully satisfactory -> Need investigation

Need decision on the future of GVA1Need decision on the future of GVA1 Should it stay or should it go ? GVA2 and GVA3 are gone already

Page 7: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Burst Gate Burst Gate CorrelationCorrelation

MICE CM January 2009 Jean-Sébastien Graulich Slide 7

GVA1 hit

Burst Gate made narrow

No progress achieved since CM22No progress achieved since CM22

Page 8: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

Online SoftwareOnline Software

Unpacking library needs upgradeUnpacking library needs upgrade New fADC (V1731) for CKOV New version to be distributed next week

Interface with G4MICEInterface with G4MICE First task is to reproduce online histograms (David Adey) See Software session for more details

Know issuesKnow issues Online monitoring GUI tends to get stalled at the end of a

run Online monitoring histograms are not labeled according

to detector names That is a feature!

Need better Online plots for fADC Current plots found not efficient in detecting broken

channels Not straight forward task (fluctuating baseline)

MICE CM January 2009 Jean-Sébastien Graulich Slide 8

Page 9: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 9

Front End ElectronicsFront End Electronics

CKOVCKOV New 500 MHz fADC has been installed Performance has to be evaluated and compared to the previous scheme There is no more TDC data for CKOV

TOFTOF TOF TDCs are not properly synchronized. Internal clock has to be

distributed.

For the moment, we use the common Part. Trigger signal in ch0 of each TDC

TOF2: We miss some electronics Shapers/Splitters: In production TDC: One board missing FADC: 3 boards missing

SW (aka Electron Muon Ranger)SW (aka Electron Muon Ranger) A technical proposal has been submitted to the Technical board

Page 10: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 10

FEE IssuesFEE Issues

Cross Talk IssueCross Talk Issue Not yet clearly understood New design is under study

FADC firmware upgradeFADC firmware upgrade Needed to allow significant reduction of data volume

Less samples per Particle event (currently 512 whereas only 60 are necessary Zero suppression (to be tested)

Delicate operation

Splitter/Shaper ProductionSplitter/Shaper Production Board production is finished in Sofia Discrete components are in hand in Geneva Mounting will start in February

Missing TDC/fADCMissing TDC/fADC Shouldbe ordered by Ludovico/Maurizio (funding issues)

Page 11: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 11

Schedule MilestonesSchedule Milestones

From CM22From CM22 DAQ reviewDAQ review December December

20092009 Upgrade of fADC firmwareUpgrade of fADC firmware November 4November 4 CAM data in Online Data StreamCAM data in Online Data Stream PostponedPostponed DAQ migration to the DAQ/Control networkDAQ migration to the DAQ/Control network October 30October 30 Target DAQ included in Detector DAQTarget DAQ included in Detector DAQ November 4November 4 Tracker integrated in DAQTracker integrated in DAQ ?? Tracker integrated in Online MonitoringTracker integrated in Online Monitoring ?? TOF2 Shaper ProductionTOF2 Shaper Production Started – Started – Dec Dec

1515 TOF TDC Clock SynchronizationTOF TDC Clock Synchronization December 10December 10 TOF1 in trigger systemTOF1 in trigger system December 10December 10 Burst Gate Signal in the Trigger SystemBurst Gate Signal in the Trigger System December 13December 13 Approval of SW/EMR Front End ElectronicsApproval of SW/EMR Front End Electronics Early Early

NovemberNovember Production of SW/EMR Front End ElectronicsProduction of SW/EMR Front End Electronics ? June 2009 ? ? June 2009 ? Installation of the Online Reconstruction FarmInstallation of the Online Reconstruction Farm November-November-

DecemberDecember

Page 12: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 12

Schedule MilestonesSchedule Milestones

New MilestonesNew Milestones Target DAQ included in Detector DAQTarget DAQ included in Detector DAQ mid Februarymid February DAQ migration to the DAQ/Control networkDAQ migration to the DAQ/Control network March 06March 06 Installation of the Online Reconstruction FarmInstallation of the Online Reconstruction Farm March 06March 06 Upgrade of fADC firmwareUpgrade of fADC firmware March 06March 06 TOF2 Shaper/Splitter ProductionTOF2 Shaper/Splitter Production Started – Started – mid mid

MarchMarch CAM data in Online Data StreamCAM data in Online Data Stream end of end of AprilApril Tracker integrated in DAQ and OLMTracker integrated in DAQ and OLM end of Aprilend of April TOF TDC Clock SynchronizationTOF TDC Clock Synchronization end of Aprilend of April DAQ reviewDAQ review May 2009May 2009 Burst Gate Signal in the Trigger SystemBurst Gate Signal in the Trigger System need beamneed beam

Approval of SW/EMR Front End ElectronicsApproval of SW/EMR Front End Electronics depends on depends on INFNINFN

Production of SW/EMR Front End ElectronicsProduction of SW/EMR Front End Electronics September September 20092009

Page 13: MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.

MICE CM January 2009 Jean-Sébastien Graulich Slide 13

SummarySummary

TOF1 has been integrated into DAQ, Trigger and TOF1 has been integrated into DAQ, Trigger and OLMOLM

CKOV readout has been upgradedCKOV readout has been upgraded Many recent milestones have been missedMany recent milestones have been missed

No real show stopper All key issues can be solved before serious things start in May 2009

Serious problem with event building discoveredSerious problem with event building discovered Deserve serious attention First step is to get online diagnostic

Target DAQ will be integrated to Detector DAQTarget DAQ will be integrated to Detector DAQ Work still in progress

FEE for SW/EMR and TOF2 are priority tasksFEE for SW/EMR and TOF2 are priority tasks

Current DAQ issues can still be solved before Step 2Current DAQ issues can still be solved before Step 2