Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza...
-
Upload
jean-murphy -
Category
Documents
-
view
228 -
download
0
Transcript of Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza...
![Page 1: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/1.jpg)
Metro Gold Line
Eastside Extension
![Page 2: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/2.jpg)
Eastside Extension Community
Little TokyoLittle Tokyo
Little TokyoLittle TokyoMariachi PlazaMariachi Plaza
Mariachi Plaza Kiosk Mariachi Plaza Kiosk
Mural in East LAMural in East LA
![Page 3: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/3.jpg)
Eastside LRT Constructors, Eastside LRT Constructors, J.V.:J.V.:
5050%%
1515%%
3535%%
![Page 4: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/4.jpg)
Quality Program – QA/QC
Quality Manual/Plan – site specific
Quality Procedures:• Washington Group International procedures
modified for project• Project Execution Procedures (PEPs) that have
quality output• All PEPs and the Sarbanes Oxley Act• Flow down to Subcontractors
![Page 5: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/5.jpg)
DESIGN
Design Quality Management
• DMJM+Harris/WIS JV
• Used DMJM+Harris Design Project Quality Manual – modified for this project
![Page 6: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/6.jpg)
Design QM Major Elements
• Design Task Protocols – defining design inputs
• Preparation and Review of Calculations, Drawings and Specifications
• Technical Studies and Reports
• Software Quality Assurance
![Page 7: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/7.jpg)
Design Coordination
• 19 Design Subcontractors
• 6 Design-Build Subcontractors
• 13 Third-party public authorities
• 21 Design Packages
• Over 300 specification sections
• Nearly 4000 drawingsThink how many review comments we received!
![Page 8: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/8.jpg)
CONSTRUCTION
QUALITY
![Page 9: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/9.jpg)
Organization
• Quality Manager reports to the Project Director AND Business Unit Director of Quality
• Independent field inspection staff
• On-site test lab for soils, asphalt and concrete – ASHTO & Caltrans certified
![Page 10: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/10.jpg)
Management Review
• Yearly audits by Corporate or Business Unit home office
• In-house quality surveillance program
• Monthly Quality Summary Reports
![Page 11: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/11.jpg)
Document Control
• Performed under defined processes/procedures
• Nearly all documents are scanned and available from any desktop computer – great time saver for:– Submittals– RFIs– Correspondence
![Page 12: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/12.jpg)
Procurement
• All Subcontracts receive Quality review and approval prior to RFP
• All purchase requisitions receive Quality review and approval
![Page 13: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/13.jpg)
Process Control
• Work Plans
• Readiness Review Meetings
![Page 14: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/14.jpg)
WORK PLANS
1. Description of work2. Prerequisites3. Public exposures4. Hazard analysis5. Applicable Specifications
& Drawings6. Submittals & status7. RFIs & status8. List of supervision and
subcontractors9. Schedule
10. Any special handling, shipping or storage requirements
11. Special process included (welding, NDE, coatings, etc.)
12. Acceptance criteria and tolerances for critical work elements
13. Inspections required and hold points
14. Checklists15. Protection of completed work
![Page 15: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/15.jpg)
Inspection & Testing
• Daily Reporting
• Use of Checklists
• On-site testing laboratory (allows for additional job-control testing)
• C0800 DBB vs. C0801 DB contract/designs
![Page 16: Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.](https://reader036.fdocuments.net/reader036/viewer/2022062517/56649edd5503460f94bedfe1/html5/thumbnails/16.jpg)
Training
• Jobsite orientation
• Lunch & Learn – one hour presentations at lunch time