Metrics to improve software process
Juha Tarvainen
![Page 2: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/2.jpg)
Contents
Preface, background, idea
Ways to improve process
Introduction to some of the metrics for process improvement
A glimpse on the analyzing tools
Improving the process
Conclusions, references 0
0,5
1
1,5
2
2,5
3
3,5
4
![Page 3: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/3.jpg)
Common problems in software processes Cost overruns Schedule delays Low productivity rate Poor quality - in software, maintenance or
fixes
![Page 4: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/4.jpg)
Total Quality Management (1985)
Process: ”The objective is to reduce process variations and to achieve continous process improvement. This element includes both the business process and the product development process. Through process improvement, product quality will be enhanced”.
![Page 5: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/5.jpg)
The usage of
Models: The waterfall development model, The prototyping approach, The spiral model, The iterative process model..
Process Maturity framework: The SEI Capability Maturity Model (CMM, CMMI), The SPR Assesment...
Quality standards: ISO 9000 Measurements and analysis ->Leads to need of metrics
![Page 6: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/6.jpg)
Metrics
Metrics are measurements, collections of data about project activities, resources and deliverables. Metrics can be used to help estimate projects, measure project progress and performance, and quantify product attributes.
Software metrics can be classified into three categories: Product metrics (size, complexity, performance) Process metrics (used to improve development and
maintenance) Project metrics (cost, schedule, productivity)
![Page 7: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/7.jpg)
Metrics for software process
Some of the software metrics Productivity & efficiency metrics Management support metrics Size metrics (also used to create other
metrics):Lines of code (LOC)Function points (FP)
![Page 8: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/8.jpg)
Lines of code
Not as simple metric as it may sound Is used in many metrics, for example in defect rate:
defects per KLOC (=thousand lines of code) or LOC inspected
Many problems The ambiguity of the counting – meaning is not the same with
Assembler or high-level languages What to count? Blank lines, comments, data definitions, only
executable lines..? Problematic for productivity studies: the amount of LOC is
negatively correlated with design efficiency
![Page 9: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/9.jpg)
Function points
Function Points measure software size by quantifying the functionality provided to the user based solely on logical design and functional specifications
Has gained acceptance in terms of productivity (for example FP/year) and quality (defects/FP)
The IFPUG counting practices committee ( http://www.ifpug.org ) is the de facto standard for counting methods
![Page 10: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/10.jpg)
Function points
A weighted total of five major components that form an application: Number of external inputs (e.g. transaction types)x4 Number of external outputs (e.g. report types)x5 Number of logical internal files (from the users’ point
of view as the may be conceived, not physical files)x10
Number of external interface files (files accessed by the application but not maintained by it)x7
Number of external inquiries (types of online inquiries supported)x4
![Page 11: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/11.jpg)
Function points
Can be calculated with low or high weighting factors depending the complexity assesment of the application
Many metrics can be based on function point calculations
Although FP is usually more realistic metric than LOC... Calculating FP’s needs training Sometimes LOC is a metric fair enough
![Page 12: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/12.jpg)
Software metrics for process purposes
The effectiveness of defect removal in-process
The pattern of testing defect arrival The response time of fix process Also in-process quality metrics improve both
the product and the process: Defect density during machine testing Phase-based defect removal pattern
![Page 13: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/13.jpg)
Defect density during machine testing A simple metric: defects/KLOC or defects/FP Defect rate during formal machine testing is usually
connected with the defect rate in the field Higher defect rates found during testing indicate that the
software has experienced high error injection – unless some new testing approach is used or some extra testing is used for some reason
Indicates the quality of the product when the software is still tested – many defects in testing mean that there’s too much error input in process
Can be used in other metrics
![Page 14: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/14.jpg)
Phase-based defect removal pattern An extension of the defect density metric Requires the tracking of defects at all phases of
the development cycle, including design, code inspections, formal verifications before testing and such
Idea: large percentage of programming defects is related to design problems – using error tracking and removal in early stage reduces error injection and improves process in the end
![Page 15: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/15.jpg)
Defect Removal Effectiveness (DRE)
DRE=
A simple metric:
Defects removed during a development phase
Defects still hidden in the productx100%
Of course the number of latent defects in the product at any given phase is not known, so the metric is based on approximation. Its usually estimated by:
Defects removed during the phase + defects found later
![Page 16: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/16.jpg)
Defect Removal Effectiveness
The metric can be calculated for the entire development process, for each phase or before code integration
The higher the value, the more effective the development process and fewer defects escaping to next phase or the field
For example, calculated for spesfic phases = phase effectiveness:
![Page 17: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/17.jpg)
About phase effectiveness
Phase defect removal effectiveness and related metrics are useful for quality management and planning
Measurements that indicate clearly which phase of the process needs improvement and should be focused on
Using the right tools, analyses can be done for the entire project as well as for local areas
![Page 18: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/18.jpg)
The pattern of testing defect arrival
Measuring the pattern of defect arrivals (times between failures)
Objective is to look for defect arrivals that stabilize at very low level or times between failures that are very far apart before ending the testing
Indicates how the testing is done (if the patterns still occur as high level, badly) and future reliability (long times between failures indicate qood reliability)
![Page 19: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/19.jpg)
The response time of fix process
Most organisations have established quidelines on the time limit within the fixes should be available for the reported defects
Severe problems are usually being as soon as possible, less severe has more relaxed time
The fix response time metric is usually calculated for all problems as follows:Mean time of all problems from open to closed
![Page 20: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/20.jpg)
The response time of fix process
Sometimes there are less severe problems that customers just ignore, so the problem remains open for a long time
->distortion of mean time->in these cases, medians should be used instead of
mean time values Idea: short time in fix process leads to
customer satisfaction and determines how good the process is in this field
![Page 21: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/21.jpg)
About productivity metrics..
Software productivity is a complex subject concerning lots of factors (resources, quality, time..)
Metrics like LOC/hour, FP/person-month, hours / class and average person-days/class (in object metrics) etc.
Usually number of units of output per unit of effort Can be used to increase development by focusing on
certain not-efficient phases – usually problematic in other sense, too
![Page 22: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/22.jpg)
Tools for analyzing metrics
Metrics are no use if they are not analyzed properly For process and quality control at the project level Some are more useful than others Ishikawa’s 7 ”old” tools:
Checklist Pareto Diagram Histogram Scatter diagram Run chart Control Chart Cause-and-effect diagram
![Page 23: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/23.jpg)
Tools for analyzing metrics
Also ”new” tools: the affinity diagram, the relations diagram, the tree diagram, the matrix chart, the matrix data analysis chart, the process decision program chart and the arrow diagram
Plenty of tools, but just using them doesn’t improve anything – careful and selective usage might do so
![Page 24: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/24.jpg)
Software process improvement in general Usage of model based approach, like Capability
Maturity Model for Software (CMM) or Capability Maturity Model Integration (CMMI) for guiding and measuring process improvement effort
Goal should be improving process maturity instead of attaining CMMI level
Measures and analyzes are used when determining process’ qualities
![Page 25: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/25.jpg)
Example: Using function point metrics to measure software process improvements What kind of value results process
improvements bring? Fewer failures? Higher productivity and quality? Shorter schedules? Higher user satisfaction?
Measurement with function points First a formal process assessment and a
baseline, followed by a six-stage improvement program
![Page 26: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/26.jpg)
Using function point metrics to measure software process improvements
Software process assessment, baseline Assesment: finding all the strengths and weaknesses
associated with software Baseline: providing a quantitative basis for quality,
productivity, costs etc. -> collected with function point metrics
Stage 1: Focus on management technologies Stage 2: Focus on Software Processes and
methodologies
![Page 27: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/27.jpg)
Using function point metrics to measure software process improvements
Stage 3: Focus on new tools and approaches
Stage 4: Focus on Infrastructure and Specialization
Stage 5: Focus on Reusability Stage 6: Focus on Industry Leadership
![Page 28: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/28.jpg)
Using function point metrics to measure software process improvements
As the focus has been in all the 6 stages in improvement, data is collected and metrics are used estimating the results
Function points can measure noncoding activities such as design, documentation and management, too
![Page 29: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/29.jpg)
Using function point metrics to measure software process improvements Imaginary values are used to demonstrate how values improve
when improving the process from CMM 1 to CMM 3
![Page 30: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/30.jpg)
Using function point metrics to measure software process improvements
![Page 31: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/31.jpg)
For noticing..
Almost everything can be measured, but for what purpose?
Planned metrics vs. actual metrics (for example error estimation)
Evaluation – designed and careful, objectivity needed
Software process is a complicated matter with lots of elements like creativity and mental activity. Using statistic metrics and tools doesn’t absolutely make it better, but the right usage (Goal/Question/Metric) can help to improve the process.
Improving software process is a long way depending on various factors and should be done with a model
![Page 32: Metrics to improve software process Juha Tarvainen.](https://reader035.fdocuments.net/reader035/viewer/2022062216/56649c795503460f9492e43e/html5/thumbnails/32.jpg)
References
Stephen H. Kan, “Metrics and Models in Software Quality Engineering”, Pearson Education Limited 2003, Boston, United States
International Function Point Users Group, http://www.ifpug.org
SPC metrics resources, http://www.spc.ca/resources/metrics/index.htm
R.S. Pressman & Associates, Inc., Software Engineering Resources, http://www.rspa.com/spi/