MEP design and collaboration
-
Upload
tero-jaervinen -
Category
Design
-
view
319 -
download
4
description
Transcript of MEP design and collaboration
MEP design
Process and flow
MEP Design, Tero Järvinen
If construction process would
be a music…
The Meaning of Collaboration
MEP Design, Tero Järvinen
Accuracity of MEP design
The neck of the guitar is about 630mm long, chords are generated when fingers have ~20mm accuracity at frets
MEP designer has to do modeling with same accuracity for havingnetworks installed in to the building according the design
MEP Design, Tero Järvinen
Guidelines and Requirements
You have to know, how to play guitar – there are many different guidelines
With different guidelines, you play different music
MEP Design, Tero Järvinen
Understanding differencies within softwares
There are different guitars for different songs
With one guitar you cannot play all styles of music
MEP Design, Tero Järvinen
Combied models
In the Band, you need more than guitar
Rock -music cannot be played without other instruments
MEP Design, Tero Järvinen
Collaboration
There has to be musicians playing different instruments
MEP Design, Tero Järvinen
Contracts for enabling the collaboration Sometimes musicians gather together and found a band.
It’s essential to have a song list for being sure all are playing same song
MEP Design, Tero Järvinen
Project leadWith experience you can say that singers charisma and attitude has to be correct
MEP Design, Tero Järvinen
BIM to SiteBand need concerts for progression
MEP Design, Tero Järvinen
The Role of General Contractor is SignificantRoaders are essential – without a good stagemanager you cannot have
timetables, audio or lighting etc. working
Roaders are making enviroment for the clients
MEP Design, Tero Järvinen
Bim to Facility ManagementFor continuous success, band should do albums between ~1-2 years.
The format of recordings varies from c-tape to blue-ray
MEP Design, Tero Järvinen
The End UserWithin a journey, you need to remember why music is done
It’s for getting new enjoyments and feelings.The end user should be happy about results
MEP Design, Tero Järvinen
MEP Design, Tero Järvinen
Contract
Philosophy Process
AllianceIPD
BIMLeanConstruction
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Cornerstones for BIM process
MEP Design, Tero Järvinen
Origin: DPR Construction inc.
Meilahden potilastorni, 1.kerros
MEP Design, Tero Järvinen
Thanks, questions?