MEP design and collaboration

16
MEP design Process and flow MEP Design, Tero Järvinen

description

Yet another presentation

Transcript of MEP design and collaboration

Page 1: MEP design and collaboration

MEP design

Process and flow

MEP Design, Tero Järvinen

Page 2: MEP design and collaboration

If construction process would

be a music…

The Meaning of Collaboration

MEP Design, Tero Järvinen

Page 3: MEP design and collaboration

Accuracity of MEP design

The neck of the guitar is about 630mm long, chords are generated when fingers have ~20mm accuracity at frets

MEP designer has to do modeling with same accuracity for havingnetworks installed in to the building according the design

MEP Design, Tero Järvinen

Page 4: MEP design and collaboration

Guidelines and Requirements

You have to know, how to play guitar – there are many different guidelines

With different guidelines, you play different music

MEP Design, Tero Järvinen

Page 5: MEP design and collaboration

Understanding differencies within softwares

There are different guitars for different songs

With one guitar you cannot play all styles of music

MEP Design, Tero Järvinen

Page 6: MEP design and collaboration

Combied models

In the Band, you need more than guitar

Rock -music cannot be played without other instruments

MEP Design, Tero Järvinen

Page 7: MEP design and collaboration

Collaboration

There has to be musicians playing different instruments

MEP Design, Tero Järvinen

Page 8: MEP design and collaboration

Contracts for enabling the collaboration Sometimes musicians gather together and found a band.

It’s essential to have a song list for being sure all are playing same song

MEP Design, Tero Järvinen

Page 9: MEP design and collaboration

Project leadWith experience you can say that singers charisma and attitude has to be correct

MEP Design, Tero Järvinen

Page 10: MEP design and collaboration

BIM to SiteBand need concerts for progression

MEP Design, Tero Järvinen

Page 11: MEP design and collaboration

The Role of General Contractor is SignificantRoaders are essential – without a good stagemanager you cannot have

timetables, audio or lighting etc. working

Roaders are making enviroment for the clients

MEP Design, Tero Järvinen

Page 12: MEP design and collaboration

Bim to Facility ManagementFor continuous success, band should do albums between ~1-2 years.

The format of recordings varies from c-tape to blue-ray

MEP Design, Tero Järvinen

Page 13: MEP design and collaboration

The End UserWithin a journey, you need to remember why music is done

It’s for getting new enjoyments and feelings.The end user should be happy about results

MEP Design, Tero Järvinen

Page 14: MEP design and collaboration

MEP Design, Tero Järvinen

Contract

Philosophy Process

AllianceIPD

BIMLeanConstruction

Requirements

Concept

Detail

Construction

Commissioning

Maintenance

Cornerstones for BIM process

Page 15: MEP design and collaboration

MEP Design, Tero Järvinen

Origin: DPR Construction inc.

Page 16: MEP design and collaboration

Meilahden potilastorni, 1.kerros

MEP Design, Tero Järvinen

Thanks, questions?