MEP BIM amount of objects in renovated hospital

6
MEP BIM Number of objects TJJ / 10.9.2013

Transcript of MEP BIM amount of objects in renovated hospital

Page 1: MEP BIM amount of objects in renovated hospital

MEP BIMNumber of objects

TJJ / 10.9.2013

Page 2: MEP BIM amount of objects in renovated hospital

Meilahti Tower Hospital, renovation, 36.000m2

Provision for Voids Heating and Cooling Water/Sewer Hospitalgas

Ventilation Structural Architectural Electrical

Fixed Hospital Equipments Vapour Sprinkler Pneumatic mail

Page 3: MEP BIM amount of objects in renovated hospital

Object count of model Architectural• 30.971

Structural• 85.120

MEP (All systems)• 469.305

Electrical• 70.394

Ventilation• 86.511

Water/Sewer• 147.148

Heating/Cooling• 74.948

Hospitalgas•32.823

Sprinkler• 41.743

Fixed Hospital Equipments• 2.071

Vapour•5.842

Pneumatic mail• 178

Provision for Voids•7.647

Page 4: MEP BIM amount of objects in renovated hospital

Number of objects in models

050000

100000150000200000250000300000350000400000450000500000

Page 5: MEP BIM amount of objects in renovated hospital

Number of objects in m2

02468

101214

Objects / m2

Page 6: MEP BIM amount of objects in renovated hospital

Meilahti Tower Hospital