Memorial Day Traffic Hourly Tables
-
Upload
rachel-sadon -
Category
Documents
-
view
8 -
download
0
description
Transcript of Memorial Day Traffic Hourly Tables
Memorial Day Traffic Impacts in
the Washington Region
Historical Traffic Conditions on
Seven Major "Getaway" Routes
May 2016
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
SOUTHBOUND
DC to Fredericksburg47 miles (general purpose)
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1 1 1.42 1.24 0.98 0.99 1.01 1.44 1.01 1.14 1 1 1.05 1.45 1.72
1 AM 1 1.02 1.27 1.11 0.99 1 1.03 1.21 1 1.08 0.99 1.01 0.98 1.48 1.95
2 AM 1 1.02 1.13 1 1 0.99 1.02 1.03 0.99 1.01 0.99 1 0.98 1.04 1.91
3 AM 0.99 1.03 1 1.01 0.96 0.98 1.02 1 0.97 1 1 1 0.98 0.97 1.81
4 AM 0.99 1.01 1 0.98 0.97 0.99 1.01 1.01 1 0.99 0.98 0.99 0.98 0.97 1.9
5 AM 0.97 0.99 0.98 0.99 0.96 0.98 1 0.98 0.98 1.01 0.98 0.98 0.99 0.96 1.18
6 AM 0.97 0.97 0.98 0.97 0.95 0.98 0.97 0.98 0.96 0.96 0.97 0.98 0.98 0.96 1.06
7 AM 1 1 0.99 0.99 1.01 0.97 0.99 0.98 0.99 2.19 1 1.01 1 1 1.06
8 AM 0.99 0.99 1.03 1.02 0.98 0.98 1 1.04 1.08 2.01 1.01 1.02 1.04 1.17 1.06
9 AM 0.98 1 1.07 1.13 0.97 0.98 1.02 1.17 1.23 1.32 1.1 1.09 1.27 1.59 1.1
10 AM 0.97 1.02 1.12 1.21 1.1 1.07 1.03 1.35 1.45 1.09 1.25 1.42 1.69 1.9 1.35
11 AM 1.01 1.26 1.24 1.33 1.36 1.1 1.12 1.51 1.97 1.16 1.56 1.5 1.83 1.71 1.62
12 PM 0.97 1.4 1.32 1.44 1.13 1.1 1.1 1.78 2.25 1.42 1.66 1.75 1.98 1.97 2.03
1 PM 0.98 1.51 1.28 1.22 1.02 1.05 1.05 1.8 2.31 1.53 2.01 2.21 2.34 1.95 2.22
2 PM 0.99 1.83 1.15 1.07 1.1 1.13 1.13 1.67 3.19 1.81 2.36 2.46 2.41 1.93 2.37
3 PM 1.45 1.96 1.35 1.46 1.49 1.65 1.64 2.24 3.59 2.06 3.04 2.47 2.7 2.15 2.23
4 PM 2.13 2.56 1.82 2.15 1.67 2.25 2.6 2.97 3.89 2.22 2.6 2.24 2.5 2.33 2.06
5 PM 2.41 2.86 1.95 2.51 1.82 2.34 3.02 3.5 4.93 2.29 1.81 1.88 2.08 1.77 1.81
6 PM 1.53 1.94 1.32 1.97 1.51 1.59 2.48 2.87 4.96 1.84 1.38 1.27 1.86 1.36 1.41
7 PM 1.07 1.21 0.97 1.17 1.14 1.11 1.72 2.67 2.74 1.39 1.41 1.01 1.17 1.14 1.16
8 PM 1 1.05 0.99 1 1 1.01 2.12 1.71 1.96 1.03 1.12 0.99 1.73 0.99 1.02
9 PM 0.99 1.01 1.01 1.04 0.99 1 1.49 1.37 1.8 0.97 1.06 0.99 1.49 1.02 0.99
10 PM 0.99 1 1.04 1.11 0.98 1 1.03 1.08 1.37 0.99 1 0.99 1.06 1.01 1
11 PM 0.99 0.98 1.1 1.1 0.99 0.98 1.01 1.05 1.36 1.33 0.97 1 0.99 0.98 0.98
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
2
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
WESTBOUND
DC to Haymarket (US-15)35 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1.03 1.03 1.13 1.02 1.04 1.01 1.01 1.07 1.01 1.02 1.01 1.03 1.05 1.11 1
1 AM 1.03 1.04 1.13 0.99 1.02 1 1.01 1.06 1.03 1.05 1.02 1.08 1.09 1.07 1.01
2 AM 1.01 1.05 1.08 1.01 1.02 1 1.02 1.06 1.02 1.04 1.01 1.06 1.07 1.08 1.02
3 AM 1.01 1.04 1.07 1.01 1.02 1.01 1.02 1.05 1.01 1.02 1.01 1.03 1.05 1.04 1
4 AM 1 1.01 1.06 1 1 0.98 1.01 1.05 0.99 1.01 1 1.01 1.04 1.05 0.99
5 AM 0.99 1 1.02 0.98 0.96 0.99 0.99 0.98 0.98 0.98 0.99 1 0.98 0.99 0.96
6 AM 1.09 0.98 0.98 0.98 0.95 0.97 0.98 0.97 0.96 0.95 0.96 0.98 0.98 0.98 0.95
7 AM 1.03 1.09 1.1 1.1 1.14 0.99 1.07 1.03 1.07 1.09 0.99 1.01 1.01 1.03 0.99
8 AM 1.09 1.28 1.32 1.31 1.33 1.39 1.23 1.24 1.23 1.33 1.01 1.01 1.1 1.01 1.02
9 AM 1.01 1.11 1.09 1.07 1.16 1.25 1.08 1.08 1.03 1.16 1.37 1.03 1.03 1 0.98
10 AM 1.07 0.99 1 1.01 1.31 1.6 1.01 0.99 1 1.06 1.16 1.06 1 0.99 0.98
11 AM 1.31 0.99 0.99 1.08 1.17 1.01 1 0.99 0.99 1.07 1.19 1.01 1 1.03 1.07
12 PM 1.43 1.01 1 0.99 1.32 1.14 1 0.99 1.06 1.22 1.27 1.19 1.2 1.27 1.27
1 PM 1.69 1.01 1.01 1.11 1.31 1.33 1.02 1.04 1.2 1.37 1.7 1.44 1.65 1.68 1.57
2 PM 1.51 1.06 1.67 1.23 1.21 1.42 1.09 1.17 1.27 1.44 1.68 1.91 1.93 1.8 1.53
3 PM 1.67 1.46 1.6 1.48 1.46 1.35 1.34 1.51 1.63 1.66 1.77 2.09 2.08 2.08 1.85
4 PM 1.72 1.5 1.83 1.59 1.59 1.46 1.42 2.21 1.88 1.87 1.6 1.69 1.76 1.83 1.68
5 PM 1.71 1.73 2.12 1.63 1.53 1.62 1.59 2.2 2.12 1.54 1.14 1.33 1.32 1.43 1.36
6 PM 1.62 1.69 2.12 1.51 1.22 1.46 1.34 2.05 1.68 1.28 0.99 1.03 1.02 1.12 1.06
7 PM 1.39 1.59 1.74 1.28 1.12 1.18 1.41 1.44 1.33 1.12 1.02 1.07 1.01 1.02 0.98
8 PM 1.03 1.14 1.02 1.06 1.02 1.02 1.17 1.02 1.12 1.03 1.04 1.02 1.02 1.02 1
9 PM 1.14 1.05 1.07 1.2 1.01 1.02 1.05 1.01 1.01 1 1 1.02 1 1.02 1.01
10 PM 1.05 1.05 1.21 1.3 1.18 1.03 1.28 1.11 1.18 0.99 1 1.01 1.04 1.04 1.01
11 PM 1.01 1.01 1.1 1.06 1.13 1.06 1.04 1.06 1.09 1 1.01 1.01 1.03 1.02 0.99
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
3
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
WESTBOUND
I-66 to Leesburg (US-15)28 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1.01 1.01 0.99 1.01 1.07 1 1.01 0.99 0.98 1.06 1.01 1.01 1.01 0.98 1.01
1 AM 1.01 1 1.01 1 1.05 1.01 1 1 0.98 1.04 1.01 1.02 1 0.98 1.02
2 AM 1.01 1.01 1.01 0.99 1.05 1.01 1.01 1 0.97 1.08 1.01 1.01 0.99 1.01 1.03
3 AM 1 1.03 1.01 0.98 1.06 1.01 1.01 1.01 0.99 1.07 1 1.02 1 0.98 1.02
4 AM 0.99 1.01 1.01 0.97 1.04 0.99 1 1 0.96 1.04 0.99 1 1.01 0.96 1.03
5 AM 1.01 1.02 1.01 0.94 1 1 1.01 1 0.97 1 1.02 1 1.01 0.93 0.98
6 AM 1 1.02 0.98 0.92 0.99 1 1.02 0.97 0.93 0.97 1 0.99 0.99 0.94 0.98
7 AM 1 1.02 0.98 0.94 1 1.01 1.01 0.98 0.92 1 1 1.01 1 0.95 1
8 AM 1.01 1.01 0.99 0.96 1 1.03 1.01 1 0.96 1.02 1.02 1.01 1.01 0.95 0.98
9 AM 1.01 1.08 0.99 0.94 1.01 1.07 1.1 0.98 0.94 1.04 1 0.98 0.99 0.95 0.99
10 AM 0.99 1.31 1 0.94 1.01 1.03 1.32 0.98 0.95 1.03 1.02 0.98 1 0.98 0.99
11 AM 1.01 1.03 0.99 0.93 1.02 1.01 1.08 0.98 0.94 1.03 0.99 0.99 0.98 0.95 0.98
12 PM 1 1 0.98 0.94 1.01 0.99 1.18 0.99 0.96 1.01 0.99 1 0.98 0.93 1.01
1 PM 1.01 1.08 0.96 0.92 1.01 0.98 1.35 0.98 0.93 1 0.98 0.98 0.98 0.94 1.06
2 PM 0.98 1.33 0.97 0.91 0.99 0.97 1.31 0.96 0.92 0.99 1 0.98 0.97 0.95 1.02
3 PM 0.98 1.11 0.96 0.93 0.99 0.98 1.07 0.96 0.92 0.98 0.99 1 0.98 0.95 1.01
4 PM 1.01 1.16 1 0.97 1.06 1 1 1.03 0.99 0.99 0.98 0.99 0.98 1 1.08
5 PM 1.07 1.58 1.1 1.09 1.21 1.04 1.1 1.75 1.29 1.17 1.02 0.99 0.97 0.95 1.03
6 PM 1.1 1.39 1.2 1.04 1.27 1.01 1.06 1.26 1.02 1.01 0.98 1.03 0.96 0.96 0.98
7 PM 0.98 1.06 0.97 0.94 1.14 1.01 0.99 1.15 0.95 0.95 1.01 1.01 1.04 0.97 0.97
8 PM 1 1.02 0.98 0.95 1 0.99 1.02 1.03 0.94 0.99 1.06 1.01 1.02 1.05 1.01
9 PM 1.01 1.02 1.02 0.98 1.02 1.02 1.03 1.03 1 1 1.02 1.03 1.02 1.02 1
10 PM 0.99 1.01 1.01 0.98 1 0.99 1.01 1.06 0.97 1.03 1.01 1.01 1.01 1 1.02
11 PM 1 1.01 1 0.99 1.03 0.99 1.01 1.02 0.96 1.02 1.01 1.01 1.01 1.02 1.01
WEDNESDAY BEFORE THURSDAY BEFORE
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
FRIDAY BEFORE
4
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
NORTHBOUND
Capital Beltway to Frederick (I-70)33 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1.02 1.02 0.99 0.97 0.99 1.02 1.05 1 0.98 1.01 1.05 1.02 1 0.99 1
1 AM 1.02 1.02 1.02 0.98 1 1.03 1.08 1.02 0.99 1 1.03 1.01 1.02 0.98 1
2 AM 1.03 1.03 1.01 1 1.01 1.03 1.08 1 0.98 1 1.07 1.03 1.02 1 1.02
3 AM 1.02 1.04 1.01 0.99 1.01 1.01 1.02 1 0.99 1 1.08 1.01 1 0.99 1.01
4 AM 1.04 1.03 0.98 0.99 0.99 1.03 1.02 0.99 0.97 0.98 1.03 1.01 1.02 0.97 0.99
5 AM 1.03 1.02 0.98 0.96 0.97 1.01 1.02 0.99 1.02 0.99 1.01 1.01 0.99 0.95 0.97
6 AM 0.99 1.01 0.97 0.95 0.96 1 1.02 0.98 0.96 0.97 1.01 1 0.98 0.96 0.95
7 AM 1.03 1.02 0.98 0.96 0.97 1.02 1.02 1 0.95 0.98 1.02 1.01 1.05 0.96 0.96
8 AM 1.04 1.02 1 0.96 0.97 1.03 1.02 0.99 0.97 0.96 1.02 1.01 1.03 0.96 0.98
9 AM 1.03 1.03 1.01 0.96 0.99 1.03 1.02 1.02 0.97 0.99 1.02 1.02 1.02 0.97 0.96
10 AM 1.03 1.03 1.01 0.95 0.98 1.02 1.02 0.99 0.97 1.01 1.02 1 1.02 0.98 0.97
11 AM 1.02 1.01 0.99 0.94 1 1.02 1.02 1 0.96 1.02 1.03 1.01 1.02 0.96 1.02
12 PM 1.02 1.03 0.99 0.95 0.99 1.02 1.01 0.97 0.96 1 1.05 1.08 1.01 1.02 1.28
1 PM 1.02 1 0.98 0.94 0.98 1.01 0.99 0.98 0.95 1.01 1.35 1.3 1.17 1.21 1.39
2 PM 1.02 1.08 1.01 0.96 1 1.05 1.05 1.04 0.98 1.03 1.58 1.61 1.56 1.51 1.56
3 PM 1.17 1.53 1.22 1.1 1.27 1.36 1.34 1.55 1.51 1.14 1.84 1.99 2.17 1.67 1.89
4 PM 1.38 1.83 1.42 1.34 1.55 1.6 1.5 1.68 1.91 1.19 1.74 2.1 2.32 1.69 1.82
5 PM 1.69 2.29 1.39 1.77 2.05 1.87 1.67 2.31 2.08 1.43 1.79 1.78 1.82 1.57 1.66
6 PM 1.33 1.82 1.55 2.35 1.66 1.61 1.43 2.22 1.68 1.12 1.35 1.42 1.46 1.38 1.54
7 PM 1.03 1.1 1.07 1.78 1.06 1.29 1.17 1.72 1.03 0.97 1.03 1.04 1.09 1.1 1.06
8 PM 1.02 1.03 1.03 0.98 0.96 1.05 1.08 1.16 0.97 0.97 1.06 1.07 1.01 1 0.97
9 PM 1.03 1.05 1.04 0.99 0.98 1.05 1.07 1.04 0.97 0.98 1.05 1.03 1.01 1 0.98
10 PM 1.03 1.01 1.04 1 0.99 1.01 1.01 1.01 1.09 0.99 1.02 1.01 1 0.99 0.99
11 PM 1.03 1.02 1.01 0.98 0.98 1.14 1.01 1.01 1.04 0.98 1.01 1.01 1 0.97 0.98
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
5
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
NORTHBOUND
Capital Beltway to MD-10033 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1.01 1 0.96 1.01 1.01 0.97 0.98 1.01 0.98 0.98 1 0.97 0.99
1 AM 0.98 1 0.98 0.99 1 0.98 0.98 0.99 1 0.98 0.97 0.97 0.95
2 AM 1 0.99 1.01 0.99 1.01 0.98 0.98 1 1 0.99 0.97 0.97 0.98
3 AM 0.99 0.97 0.96 0.98 1.01 0.98 0.97 1.01 1.01 0.98 0.97 0.96 0.99
4 AM 0.98 0.99 0.98 0.97 0.98 0.97 0.96 0.99 0.99 0.96 0.97 0.94 0.95
5 AM 0.96 0.95 0.96 0.96 0.98 0.95 0.96 0.97 0.97 0.95 0.95 0.95 0.94
6 AM 0.97 0.94 0.94 0.95 0.95 0.99 0.95 0.95 1.01 0.94 0.97 0.95 0.95 0.98 0.95
7 AM 0.99 0.95 1.15 1.02 1.51 1 0.98 0.96 1.04 0.96 0.98 0.97 1.05 1.12 0.96
8 AM 1 0.96 1.37 1.13 1.82 1.01 0.97 0.96 1.06 1.06 0.97 0.96 1.27 1.08 0.96
9 AM 0.99 0.97 0.98 0.97 1.02 0.99 0.97 0.98 0.96 1.05 0.97 0.96 1.03 0.97 0.96
10 AM 0.96 0.96 0.97 0.97 0.98 0.98 0.96 0.97 0.97 1.01 0.98 0.95 0.99 0.97 0.98
11 AM 0.98 0.97 0.96 0.97 0.98 0.98 0.97 0.96 1.06 1.06 0.98 0.96 0.98 0.98 1.02
12 PM 0.99 0.96 0.96 0.97 1.08 1.03 0.97 0.98 0.98 1.35 0.94 0.97 0.98 0.97 1.14
1 PM 0.98 0.96 0.96 0.97 1.03 0.97 0.97 0.97 0.98 1.51 0.96 1.17 1.13 1.21 1.44
2 PM 0.97 0.97 0.98 0.96 1.19 1.04 1.1 0.98 1.51 1.82 1.22 1.75 1.6 1.56 1.96
3 PM 0.99 1.16 1.43 1.43 1.88 1.32 2.14 1.5 3.82 2.23 1.53 2.54 2.11 2.1 2.15
4 PM 1.41 1.5 1.95 2.23 2.27 2.46 1.87 2.04 3.29 2.29 1.45 2.73 2.2 2.19 2.02
5 PM 1.76 1.62 2.32 2.33 2.21 2.34 2.01 2.52 3.01 2.2 1.23 2.02 1.93 1.89 1.66
6 PM 1.25 1.15 1.92 1.78 1.9 1.94 1.72 2.22 2.22 1.55 0.97 1.35 1.17 1.18 1.15
7 PM 0.96 0.96 1.1 0.98 1.13 1.14 1.07 1.23 1.25 1 0.95 0.97 0.95 0.97 0.98
8 PM 0.98 0.96 0.96 0.95 0.95 1.03 0.95 1.11 0.98 0.98 0.99 0.94 0.95 0.98 0.97
9 PM 1.17 0.97 0.99 1 1.08 0.99 1.06 0.97 0.98 1 0.97 0.97 1 0.97
10 PM 1 0.99 0.97 0.97 1.01 0.97 1.02 0.94 0.97 0.98 0.95 0.99 0.98
11 PM 0.98 0.98 0.97 0.97 1 0.99 1.03 0.96 0.99 0.99 0.96 0.98 0.96
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
6
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
NORTHBOUND
Capital Beltway to MD-10015 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 0.99 1.01 1.02 1.01 1.04 1.01 0.99 1.01 1.02 0.97 1.03 1 1.04 0.98 1
1 AM 1.01 0.98 1.03 1.03 0.98 1 1.01 1.01 1.02 1.01 1 1.01 1 1.01 1.01
2 AM 0.98 1.01 1 0.96 1 1 1.03 1.01 0.99 1.04 1.02 1.02 0.99 1 1.01
3 AM 0.98 1.02 1.01 1 0.98 1.04 1.01 1.02 1 1.04 1.03 1.02 1.01 1.01 1.01
4 AM 1.01 0.99 0.97 1.03 0.96 0.99 1.01 1 1 0.96 1 1.03 0.99 1.01 0.97
5 AM 1 0.97 0.98 0.97 0.96 1.01 0.99 0.99 1.1 0.96 1.01 1 0.98 0.96 0.96
6 AM 0.99 1.01 1.01 1.08 1 1.05 1.09 1.01 1.45 1.01 1 1.05 1.01 1.04 0.99
7 AM 1.08 1.09 1.06 1.25 1.32 1.16 1.32 1.06 1.45 1.2 1.02 1.06 1.14 1.02 1.17
8 AM 1.24 1.03 1.15 1.15 1.7 1.46 1.18 1.09 1.25 1.46 1.04 1.12 1.13 1.02 1.2
9 AM 1.06 1.02 0.99 1.02 1.08 1.18 1 1.01 1.01 1.17 1.04 1.03 1.04 1.01 0.99
10 AM 1.01 0.99 1.01 1 1 1.02 1.03 1 1.03 1.07 1.02 1.02 1.04 1.02 1.09
11 AM 1.04 1.01 1.01 1.01 1.02 1.04 1.02 1.01 1 1.39 1.06 1.03 1.17 1.09 1.19
12 PM 1.02 1.02 0.99 1.02 1.11 1.03 1.01 1.03 1.02 1.44 1.05 1.32 1.72 1.31 1.3
1 PM 1.02 1.03 1.02 1.06 1.2 1.02 1.14 1.03 1.22 1.51 1.25 1.61 1.68 1.51 1.7
2 PM 1.1 1.38 1.22 1.15 1.42 1.16 1.39 1.29 1.52 2.13 1.69 1.95 2.52 1.75 2.75
3 PM 1.4 1.62 1.96 1.88 2.19 1.74 2.12 2.02 3.55 2.58 1.98 4.31 2.78 1.85 2.22
4 PM 1.76 1.96 3 2.46 3.08 2.11 3.72 2.73 3.65 2.81 1.88 3.1 2.19 1.8 1.57
5 PM 1.54 1.93 3.52 2.51 2.84 2.4 3.42 3.41 3.26 2.34 1.65 1.98 2.01 1.95 1.62
6 PM 1.61 1.32 2.7 2.16 1.95 1.85 1.97 2.82 2.5 1.75 1.39 1.2 1.38 3.9 1.74
7 PM 1.08 1.06 1.42 1.23 1.33 1.25 1.23 1.5 1.38 1.39 1.05 1.02 1.1 2.92 2.05
8 PM 1.01 1.02 1.01 1.09 1.28 1.03 1.07 1.08 1.22 1.12 1.07 1.05 1.03 1.33 1.08
9 PM 1.04 1.03 1.02 1.05 1.03 1.03 1.04 1.19 1.07 1.03 1.08 1.08 1.06 1.12 1.07
10 PM 1.03 1 1.12 1.05 1.03 1.05 1.01 1.21 1.04 1.03 1.05 1.05 1.03 1.09 1.09
11 PM 1.02 0.98 1.03 1.01 1.01 1.03 1.01 1.06 1.02 0.99 1.01 1.05 1.02 1.03 1.03
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
7
Hourly Travel Time Index (TTI) in the Days Before Memorial Day Weekend
EASTBOUND
DC Border to I-9723 miles
2011 2012 2013 2014 2015 2011 2012 2013 2014 2015 2011 2012 2013 2014 2015
12 AM 1 1.01 0.97 0.97 1.01 1 0.99 0.97 0.98 1 0.97 1 0.99 0.94 0.98
1 AM 0.99 0.99 0.99 0.98 1.01 1 0.99 1 0.99 1.01 1 1 0.99 0.97 0.99
2 AM 1.01 0.98 1.01 0.98 1.01 0.99 0.98 0.99 0.98 1.03 1.01 1.01 0.99 1 1
3 AM 1.02 1 0.99 0.98 1.02 1.01 0.99 0.98 0.98 1 1.02 0.98 0.98 0.98 0.99
4 AM 1.01 1 0.98 0.96 1.01 1.01 0.99 1.02 0.97 1.01 1.02 0.98 0.98 0.95 0.99
5 AM 0.99 0.96 0.98 0.97 1 1.01 0.99 0.97 0.98 1 1 0.97 0.98 0.95 0.96
6 AM 0.99 0.95 0.94 0.95 0.97 0.98 0.96 0.95 1 0.98 0.97 0.97 0.94 0.93 0.96
7 AM 0.99 0.96 0.96 0.96 0.95 0.96 0.96 0.96 0.97 0.97 0.98 0.95 0.97 0.94 0.95
8 AM 0.98 0.97 0.95 0.96 0.96 0.99 0.96 0.96 0.95 0.98 0.98 0.96 0.97 0.96 0.95
9 AM 1 0.98 0.96 0.94 0.98 0.99 0.96 0.97 0.96 0.99 0.98 0.96 0.98 0.95 0.96
10 AM 0.99 0.98 0.96 0.94 0.97 0.99 0.96 0.97 0.96 1.02 0.96 0.97 0.97 0.95 0.95
11 AM 0.98 0.96 0.97 0.95 0.97 0.99 0.98 0.98 0.99 1.01 0.99 0.96 0.97 0.95 0.95
12 PM 0.99 0.98 0.95 0.95 0.97 0.98 0.97 0.95 1.05 1.01 1.02 0.96 1.18 0.94 0.96
1 PM 0.98 0.96 0.95 0.95 0.96 0.98 0.97 0.97 1.1 1.02 0.96 1.1 2.26 0.94 1.14
2 PM 0.97 0.95 0.95 0.94 0.95 0.96 0.96 0.96 1.05 1.07 1.29 1.77 3.32 0.96 1.17
3 PM 1 0.97 0.99 0.95 1.01 1.02 1.03 1 0.97 1.17 1.57 1.8 3.7 1.04 1.11
4 PM 1.13 1.07 1.45 1.03 1.26 1.31 1.25 1.15 1.25 1.31 1.15 1.67 3.13 1.04 1.06
5 PM 1.35 1.19 1.47 1.08 1.39 1.46 1.57 1.32 1.9 1.3 0.99 1.09 1.81 1.01 1.04
6 PM 1.15 1 1.11 1.08 1.75 1.24 1.27 1.06 1.56 1.07 0.99 0.98 0.97 0.94 0.95
7 PM 0.99 0.97 1.1 0.99 1.63 0.98 1.06 0.95 1.01 0.96 0.97 0.96 0.94 0.94 0.94
8 PM 0.99 0.99 1.19 0.96 0.96 0.99 0.99 0.97 0.94 0.96 1.02 0.97 0.98 0.95 0.98
9 PM 1.01 1.01 0.99 1.01 1 1.01 1 0.98 0.96 0.99 1.01 0.98 0.98 1 0.99
10 PM 1 0.99 0.98 0.99 0.99 0.99 0.99 0.97 0.97 0.98 1.02 0.97 0.99 0.98 0.99
11 PM 1.01 1 0.99 0.98 1 0.99 0.99 1.01 0.96 0.98 1 0.99 0.98 0.97 0.98
Travel Time Index (TTI) is the ratio of actual travel speed
to expected travel speed in free-flow conditions.
Data Source: I-95 Corridor Coalition Vehicle Probe Project
WEDNESDAY BEFORE THURSDAY BEFORE FRIDAY BEFORE
8
Contributors
Technical Notes
Data Source
For more details about the TPB's analysis of Memorial Day traffic impacts, click here.
Memorial Day Traffic Impacts in the Washington Region
Historical Traffic Conditions on Seven Major "Getaway" Routes
May 2016
About the TPB
The National Capital Region Transportation Planning Board (TPB) is the metropolitan planning
organization (MPO) for the Washington region. The TPB is responsible for directing the continuing
transportation planning process carried out cooperatively by the states and the local communities in the
region. The TPB is staffed by the Department of Transportation Planning of the Metropolitan Washington
Council of Governments.
Metropolitan Washington Council of Governments
777 North Capitol Street NE, Suite 300
Washington DC 20002
www.mwcog.org/tpb
Traffic data provided by Inrix, Inc., thorugh the I-95 Corridor Coalition Vehicle Probe Project (VPP).
Animated maps were generated by the Trend Map tool of the VPP Suite developed by the Center for
Advanced Transportation Technology Laboratory (CATT Lab) at the University of Maryland. Tables of
hourly traffic conditions were based on the Performance Charts tool of the VPP Suite.
Wenjing Pu
Andrew Meese
Benjamin Hampton
Abigail Zenner
Hourly average Travel Time Index (TTI) on area freeways was the arithmetic mean of the TTI of all freeway
segments in all directions in the TPB planning area, weighted by segment length.
9