The set up

100/120 100/120

Page 6: Melcar drilling ppt

The Air Hammer

Page 7: Melcar drilling ppt
Page 8: Melcar drilling ppt
Page 9: Melcar drilling ppt

Drill path Set up

Page 10: Melcar drilling ppt
Page 11: Melcar drilling ppt
Page 12: Melcar drilling ppt

Auger bore cutting head

Page 13: Melcar drilling ppt

Hole opener

Page 14: Melcar drilling ppt

Rt 100 bore

Page 15: Melcar drilling ppt

PREPARING SITE FOR AUGER BORE

Page 16: Melcar drilling ppt

24/B AUGER BORING RIG

Page 17: Melcar drilling ppt

36/600 AMERICAN AUGER

Page 18: Melcar drilling ppt

SWIVEL

PULL HEAD

8’’ hdpe

Page 19: Melcar drilling ppt
Page 20: Melcar drilling ppt
Page 21: Melcar drilling ppt
Page 22: Melcar drilling ppt
Page 23: Melcar drilling ppt
Page 24: Melcar drilling ppt

Click icon to add picture

Page 25: Melcar drilling ppt

CHRIS ON THE 100/120

Page 26: Melcar drilling ppt

GRANITE BORE NC

Page 27: Melcar drilling ppt
Page 28: Melcar drilling ppt

HOLE OPENER IN ACTION

Page 29: Melcar drilling ppt

4’’ thru rock air hammer

Page 30: Melcar drilling ppt

Pull back pipe is for drainage

Page 31: Melcar drilling ppt

Rock wall 007

Page 32: Melcar drilling ppt

013

Page 33: Melcar drilling ppt

Steering around cul de sac 4’’ gas

Start drill

End bore

Page 34: Melcar drilling ppt

Installing 12’’ water valve

Page 35: Melcar drilling ppt

Short bore 12’’ hdpe

Page 36: Melcar drilling ppt

Good mud flow

Page 37: Melcar drilling ppt

New auger rig

Page 38: Melcar drilling ppt

ANOTHER AUGER BORE COMPLETE

Page 39: Melcar drilling ppt

12’’ casing under 2 rail tracks

Page 40: Melcar drilling ppt

AUGER BORE 140TF EXITS ON TARGET

Page 41: Melcar drilling ppt

ELECTRO FUSE IN PROCESS [$418 FITTING 12’’

Wall stop and mechanical

joint Transition to ductile iron

melcar
Page 42: Melcar drilling ppt

Ready to change head

Page 43: Melcar drilling ppt

Exit pit and lead in trench

Page 44: Melcar drilling ppt

Work 2009 018

Page 45: Melcar drilling ppt

Rock bore

Page 46: Melcar drilling ppt

Sand stone rock reaming

Page 47: Melcar drilling ppt

12’’ hdpe ready to pull in

Page 48: Melcar drilling ppt

Rock head exits

AIR HAMMER

Page 49: Melcar drilling ppt

Dover air force base

Page 50: Melcar drilling ppt

Img_20110618_065840

Page 51: Melcar drilling ppt

16’’ hdpe in the design stage deemed unboreable , we

have submitted a proposal

Page 52: Melcar drilling ppt

Reamed rock

Page 53: Melcar drilling ppt

24/ 40 the work horse

Page 54: Melcar drilling ppt

Water and bentonite mixing truck

Page 55: Melcar drilling ppt

TOM DRILLING

Page 56: Melcar drilling ppt

TYPICAL FUSING SETUP