7/31/2019 Mehra Metal Component Pvt
1/24
Project on quality of
Automobile product
Submitted by:Rahul10/ME077
-
7/31/2019 Mehra Metal Component Pvt
2/24
PREFACE
With immense sincerity and pleasure I have completed my trainingin a well-developed plant with latest technology at Thomson press.The purpose of training is that it helps one to get the requiredknowledge of manpower ,actual work requirement, industrial andhuman relationships. The experience at the industry dealing withsupervisors and actual work environment gave me some practicalknowledge with respect to what we have studied theoretically fromthe curriculum books.This six weeks training gave me some knowledge of the thingsstated above . I will utilize the same to the best of my efforts.
RAHUL
B.S.Anangpuria institute of technology
-
7/31/2019 Mehra Metal Component Pvt
3/24
ACKNOWLEDGEMNT
In the modern scenario of technical advancement, more importance
is given to the practical knowledge of a particular student. Hence
for this reason workshops and training sessions are being provided,
to make students technically sound. After my fourth semester I
HAVE undergone in plant training from THOMSON PRESS,
Faridabad.
I AM EXTREMELY grateful to (H R Department)
for their expert guidance and valuable support during my training
period.
Rahul
B.S.Anangpuria institute of technology
-
7/31/2019 Mehra Metal Component Pvt
4/24
MANAGEMENT
AND
ORGANISATION
Mehra Metal's board of directors is comprised of managing director ,executive director ,chief financial officer and chief operatingofficer. Each member is a highly regarded individual with broad anddeep business experience and with significant and relevantmanagement experience.
The Mehra Metal's principles and processes, which include internalannual reviews of board practices, the board selection process andthe company's Code of ethics, have been in place for many years.
The company is fortunate have an experienced leadership team torecruit, mentor and guide our global and diverse workforce. Thesemen and women conduct Thomson press global business in keepingwith our company's vision, values and standards of behavior.Members of the organisation
Mr. Gulshan Mehra., Managing Director
Nashin Ahmad, Quality Head
Gopal singh, Asstt. Quality Head
Chander Sekhar, Sr. Engineer
-
7/31/2019 Mehra Metal Component Pvt
5/24
About Company
FormationMMCPL was established in jan. 1983 by Mr. GulshanMehra. Mr. Mehra had a Strong working experience ofmore than 40 years in the field of tools, dies and precisionsheet metal component manufacturing.We were lucky to have M/S. Kelvinator India ltd. Faridabadas first customer .In 1986, we made our entry into automobile componentmanufacturing sector with M/S. Denso India ltd.Since then the company has grown multifold by continuallyimproving and upgrading technology to meet National /International standards and now working with Indianmajor auto gaints.
Quality Policy
TO MANUFACTURE & SUPPLY
SHEET METAL COMPONENTS & ASSEMBLIES TO THE
ENTIRE SATISFACTION OF OUR CUSTOMERS
THROUGH CONTINUAL QUALITY IMPROVEMENT &
COMMITED TEAM WORK.
-
7/31/2019 Mehra Metal Component Pvt
6/24
PRODUCTS
-
7/31/2019 Mehra Metal Component Pvt
7/24
Draw Components
1 viper bracket
Quality
1.dimension problem are checked by
2.plating thickness checked by micro tester
use
it is use for clean the glass of automobiles
-
7/31/2019 Mehra Metal Component Pvt
8/24
Robotic Welded Parts
Robotic welded parts
1. robotic welding are used to assemble
the base and bracket
2. assembling the flexible part
Defect
1. blow hole , pin hole , porosity .welding
short operation missing , dimension
problem and visual defect.
-
7/31/2019 Mehra Metal Component Pvt
9/24
Fuel Tank Cap Outer
fuel tank cap outer
Use
1. Used in motor bikes to cover the fuel
tank.
Quality
1. In the quality we checked visual
defect and dent free.
-
7/31/2019 Mehra Metal Component Pvt
10/24
Moving Contacts
Moving contact
1 on /off button of automobiles by a key.
Quality
1. in the quality we check crack, damage ,
dimension are ok or not .
-
7/31/2019 Mehra Metal Component Pvt
11/24
Commercial Door Lock
Commercial door lock
1. it is the interior lock of the door.
Defects
1. Dimension problem.
2. Cracks.
3. Visual defects.
4. Dent.
-
7/31/2019 Mehra Metal Component Pvt
12/24
Lamination
1 it works for stator to start the
automobiles.
Defects
1. Dimension problem.
2. Cracks.
3. Visual defects.
4. Dent.
-
7/31/2019 Mehra Metal Component Pvt
13/24
Alternator Rectifier Plates
Alternator rectifying plate
Plates for electronic works in automobiles.
Defects
1. Dimension problem.
2. Cracks.
3. Visual defects.
4. Dent.
-
7/31/2019 Mehra Metal Component Pvt
14/24
Terminals
Terminals
Wire holding and providing the current for electronic part.
Defects
1. Dimension problem.
2. Cracks.
3. Visual defects.
-
7/31/2019 Mehra Metal Component Pvt
15/24
Alternator Fans
Alternator fans
1 it is used for remove the heat of engine
to cool it
-
7/31/2019 Mehra Metal Component Pvt
16/24
Roof Lamp Terminals
Roof and lamp terminals
1 it is used for internal light and lamp
and provide the earth for electricity.
-
7/31/2019 Mehra Metal Component Pvt
17/24
-
7/31/2019 Mehra Metal Component Pvt
18/24
ProductionPress Shop
Press Shop includes Power/Pneumatic/Hydraulic/High Speed Stamping Presses in
the range of 10T to 250T.
Pneumatic machine
1 Pneumatic machine are used for
stamping the coils.
2 Introducing the lamination of coils is
called stamping.
-
7/31/2019 Mehra Metal Component Pvt
19/24
Assembly Line
Assembly Line for Stampings
Assembling line
1. After lamination riveting is done by
hydraulic machine for maintain the
flatness and eliminating the gap.
-
7/31/2019 Mehra Metal Component Pvt
20/24
Robotic Welding Machine
Robo welding Area
Robo Machine
Robotic Welding Machine1. Robotic welding machine
consist the welding fixture andassemble the welded parts.
-
7/31/2019 Mehra Metal Component Pvt
21/24
Tool Room Wire cut
Tool root wire cut
1 It is the machine in which material is cut
by wire
2 It is used to make the tool.
-
7/31/2019 Mehra Metal Component Pvt
22/24
Quality Control Inspection Gauge
Quality control inspection gauge
1 To check the quality of product we use the
instrument
plug gauge ,ring gauge ,dial gauge
Plug gauge
It is used for measuring the innerdia
Ring gauge
It s used for measure the outer die
Dial indicator
It is used for checked the flatness.
-
7/31/2019 Mehra Metal Component Pvt
23/24
Quality Control Equipments
CMM Projector
Quality control equipment
CMM
(IT is co-ordinate measuring machines)=its
work on factor like x,y,z used for all direction
list count =1microne
Projector
See the large image of the product when
placed on it and remove the error
-
7/31/2019 Mehra Metal Component Pvt
24/24