Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR - Mining Industry Advisory Committee (MIAC) Research Summit Thursday, January 31 st , 2019 10:00 to 15:30 Meeting Notes Group Discussion Group Exercise Summary of Results

Transcript of Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research...

Page 1: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

ACR - Mining Industry Advisory Committee (MIAC)Research Summit

Thursday, January 31st, 2019 10:00 to 15:30

Meeting NotesGroup Discussion

Group Exercise Summary of Results

Page 2: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

ACR - MIAC RESEARCH SUMMITJANUARY 31ST, 2019 (OVER 40 FIRMS AND 77 ATTENDEES)

What Did We Talk About?Ø Mining Research Focal Points: Objectives, Members, Funding, Current focus areas, Future

• Canadian Oil Sands Innovation Alliance (COSIA) Matt McCulloch COSIA Director Innovation & GHG • Canada Mining Innovation Council (CMIC) Carl Weatherell Executive Director & CEO • Global Mining Group Heather Ednie Managing Director, GMG• University of Alberta Robert Hall Mining Engineering Professor

Ø Mining Research Road Map and Priorities- Surface Mine of the Future Mal Carroll, GM Syncrude R&DØ Innovation and Risk Gary Bunio, GM, Strategic Technology Development, Suncor

Group Discussion Exercise and Democratic Process – Gord Winkel, Chair, Industrial Professor, Engineering Safety and Risk Management Program Faculty of Engineering, University of Alberta.

Ø Participation in Technology Deployment to Set the stage for greater focused targeted collaboration in Alberta Mining.• In small Group Exercise and using the Dotmocracy Process, referenced the CMIC Surface Mining Roadmap.• Discussed focus areas on the Roadmap, and chose individual top 5 priorities. Used 5 dots and recorded the number of the priority from the

Roadmap, and placed on common CMIC roadmap.• Additional focus areas, could also be added.• Requested participants to provide name and contact information on sticky’s of interest focus areas.

OutcomesØ All participants informed on Focal Point Organization’s (CMIC, COSIA, GMG, and University of Alberta) vision and scope.Ø Topics of interest have been identified, and individual contact information provided.

Page 3: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

ACR - MIAC RESEARCH SUMMITJANUARY 31ST, 2019 (OVER 40 FIRMS AND 77 ATTENDEES)

Results of Dotmocracy and Interest Focus Areas

These results are reflective of the ACR Membership and other attendees at this Research Summit. Results may be different for a different audience.Use the Roadmap in your organizations and interactions, and feedback is always welcome to improve our Roadmap.We will continue to use this Roadmap and revise and improve as more data is collected. Summit participants will be communicated, any improvements and updates to the Roadmap.

Page 4: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

ACR - MIAC RESEARCH SUMMITJANUARY 31ST, 2019 (OVER 40 FIRMS AND 77 ATTENDEES)

Next StepsØ Facilitate connection of organizations and individuals with like interest opportunities for collaboration.Ø ACR/MIAC will monitor progress and provide support / guidance to connect with CMIC and COSIA, GMG and

University of Alberta.Ø Expectation is organizations and individuals will take the initiative to initiate collaboration, studies, projects,

workshops etc.Ø Participants to contact research focal points to be included on their mailing list for news items and activities. Ø Provide progress update on initiatives.

What: Focus where:Who:

Page 5: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

ACR - MIAC RESEARCH SUMMITJANUARY 31ST, 2019 (OVER 40 FIRMS AND 77 ATTENDEES)

Mining Research Groups Contact Information

Canada’s Oil Sands Innovation Alliance (COSIA)Email: [email protected] www.cosia.ca

Matt McCulloch P.Eng. COSIA Director Innovation & Greenhouse Gas,

Suite 1700, 520 5th Avenue SW, Calgary, AB T2P 3R7,Direct: 403.444.5271, Mobile: 403.970.4308, Fax: 403.444.5288,

Canada Mining Innovation Council (CMIC)Email: [email protected] www.cmic-ccim.org

Carl Weatherell, Executive Director & CEO,1.613.627.0771 x105 1.613.979.3142 (m)

Global Mining GroupEmail: [email protected], and [email protected] Ednie Managing Director,26 Bridge Street, Ormstown, QC, J0S 1K0,Phone: 450-829-9000 or 450-829-9111.

University of AlbertaRobert Hall Mining Engineering Professor,Email: [email protected]/civil-environmental-engineering/undergraduate-studies/mining-and-petroleum-engineeringPhone: 780-886-6105

Page 6: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining RoadmapReduce core

sampling requirements

Adopt coil drill techniques

Improve real time data analyses

Improve blast hole analyses

Integrate ore sensing at the face

Implement multi-disciplinary analyses

Develop AI based ore models

Integrate all ore body data into one common spatial

database & planning pltfrm

Integrate common database of all resources

and capabilities

Integrate operational planning and scheduling with financial

systems to model system value

Explore continuous cutting machines for bulk mining

Develop high intensity blasting techniques for fragmentation control

Engineer ore sorting at the face and along the mining process to eliminate waste

Pre-concentration of ore inside the pit

Dedicated ore streams to selective processing to

reduce/eliminate blending

Decouple truck and shovel interface with loading buffer (surge loader)

Electric, modular truck/truck train (trolley assist/Battery hybrid)

Remote operation integrated with

autonomous hauling

Explore application of alternative technologies

(Rail-veyor/RopeCon, other)

Multi-modal system to optimize the flexibility and cost advantage

of different technologies

Develop modular equipment that can be containerized for easy

transport and on-site assembly

Use hybrid air vehicles to transport equipment

modules to remote sites

Avoid building road/rail infrastructure to remote

sites where viable

Decouple equipment life from life of the ore body.

Relocate equipment

Establish digital twins of all equipment as well as full

mine and operations

Improve predictive analytics of equipment and mining

process performance

Fully digitalized operations with integrated

performance feedback loop

Link intelligent work place to integrated planning, scheduling

and dynamic simulation

Remote centers to operate remote equipment

Full autonomous parts of the operations

Automate the integration and management of renewable

energy integration

Electrification of all mining processes

Digitally intelligent grid to enable full load control and orchestration at mine level

Maximum penetration of renewable energy

Use cheap renewable energy to clean and recycle

water

Zero emissions fully electrified mining operation

Use Block-chain (BC) to track ore mined throughout

the value chain

Reward employees and partners with instant

payments

Track warranties on parts with BC individually

Sell metals and minerals directly to end customer with BC (Track, recycle and resell)

Fully transparent mining –operations, supply chain and

all external stakeholders

Introduce advanced purification and recycling technology to

reduce/eliminate tailing

Implement digital water monitoring and automated

management

Establish Block-chain logging of water quality

Extract valuable minerals from waste streams

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment & Management

Stochastic dynamic model of mining process based on plan

and schedule

Mine smaller, richer ore bodies with small footprint

Integrate wearables to create the performance

augmented worker

Automate back-office processes

Zero water environmental impact mining

1 2 3 4 5

11

6 7

8 9 10

12 13 14 15 16

17 18 19 20 21

22 23 24 25 26

27 28 29 30

31 32 33 34 35

36 37 38 39 40

41 42 43 44 45

46 47 48 49 50

Page 7: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

Reduce core sampling

requirements

Adopt coil drill techniques

Improve real time data analyses

Improve blast hole analyses

Integrate ore sensing at the face

Implement multi-disciplinary analyses

Develop AI based ore models

Integrate all ore body data into one common spatial

database & planning pltfrm

Integrate common database of all resources

and capabilities

Integrate operational planning and scheduling with financial

systems to model system value

Explore continuous cutting machines for bulk mining

Develop high intensity blasting techniques for fragmentation control

Engineer ore sorting at the face and along the mining process to eliminate waste

Pre-concentration of ore inside the pit

Dedicated ore streams to selective processing to

reduce/eliminate blending

Decouple truck and shovel interface with loading buffer (surge loader)

Electric, modular truck/truck train (trolley assist/Battery hybrid)

Remote operation integrated with

autonomous hauling

Explore application of alternative technologies

(Rail-veyor/RopeCon, other)

Multi-modal system to optimize the flexibility and cost advantage

of different technologies

Develop modular equipment that can be containerized for easy

transport and on-site assembly

Use hybrid air vehicles to transport equipment

modules to remote sites

Avoid building road/rail infrastructure to remote

sites where viable

Decouple equipment life from life of the ore body.

Relocate equipment

Establish digital twins of all equipment as well as full

mine and operations

Improve predictive analytics of equipment and mining

process performance

Fully digitalized operations with integrated

performance feedback loop

Link intelligent work place to integrated planning, scheduling

and dynamic simulation

Remote centers to operate remote equipment

Full autonomous parts of the operations

Automate the integration and management of renewable

energy integration

Electrification of all mining processes

Digitally intelligent grid to enable full load control and orchestration at mine level

Maximum penetration of renewable energy

Use cheap renewable energy to clean and recycle

water

Zero emissions fully electrified mining operation

Use Block-chain (BC) to track ore mined throughout

the value chain

Reward employees and partners with instant

payments

Track warranties on parts with BC individually

Sell metals and minerals directly to end customer with BC (Track, recycle and resell)

Fully transparent mining –operations, supply chain and

all external stakeholders

Introduce advanced purification and recycling technology to

reduce/eliminate tailing

Implement digital water monitoring and automated

management

Establish Block-chain logging of water quality

Extract valuable minerals from waste streams

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment / Management

Stochastic dynamic model of mining process based on plan

and schedule

Mine smaller, richer ore bodies with small footprint

Integrate wearables to create the performance

augmented worker

Automate back-office processes

Zero water environmental impact mining

1 2 3 4 5

11

6 7

8 9 10

12 13 14 15 16

17 18 19 20 21

22 23 24 25 26

27 28 29 30

31 32 33 34 35

36 37 38 39 40

41 42 43 44 45

46 47 48 49 50

25 31 112 53

1

1

1

1

1

1

1

1

1

2

2

3

2

2

3

3

3

3

43

2

3

5

5

5

6

7

7 7

7

77 8

9 99

11

12

13

0

0

00

13

22

24

22

33

37

16

11

3

Permitting, Regulatory Database in GIS, transparency

of submitted information

11a3

Reclamation, Handle it once approach, integrate planning/operations for tailings and reclamation placement

Total Sum of

dots

CMIC Surface Mining RoadmapRed Number is sum of dots placed on each area.

Page 8: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment / Management

25

13

22

24

22

33

37

16

11

3

Road Map sorted highest to lowest of number of

dots placed.

Total Sum of

dots

Page 9: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

Reduce core sampling

requirements

Adopt coil drill techniques

Improve real time data analyses

Improve blast hole analyses

Integrate ore sensing at the face

Implement multi-disciplinary analyses

Develop AI based ore models

Integrate all ore body data into one common spatial

database & planning pltfrm

Integrate common database of all resources

and capabilities

Integrate operational planning and scheduling with financial

systems to model system value

Explore continuous cutting machines for bulk mining

Develop high intensity blasting techniques for fragmentation control

Engineer ore sorting at the face and along the mining process to eliminate waste

Pre-concentration of ore inside the pit

Dedicated ore streams to selective processing to

reduce/eliminate blending

Decouple truck and shovel interface with loading buffer (surge loader)

Electric, modular truck/truck train (trolley assist/Battery hybrid)

Remote operation integrated with

autonomous hauling

Explore application of alternative technologies

(Rail-veyor/RopeCon, other)

Multi-modal system to optimize the flexibility and cost advantage

of different technologies

Develop modular equipment that can be containerized for easy

transport and on-site assembly

Use hybrid air vehicles to transport equipment

modules to remote sites

Avoid building road/rail infrastructure to remote

sites where viable

Decouple equipment life from life of the ore body.

Relocate equipment

Establish digital twins of all equipment as well as full

mine and operations

Improve predictive analytics of equipment and mining

process performance

Fully digitalized operations with integrated

performance feedback loop

Link intelligent work place to integrated planning, scheduling

and dynamic simulation

Remote centers to operate remote equipment

Full autonomous parts of the operations

Automate the integration and management of renewable

energy integration

Electrification of all mining processes

Digitally intelligent grid to enable full load control and orchestration at mine level

Maximum penetration of renewable energy

Use cheap renewable energy to clean and recycle

water

Zero emissions fully electrified mining operation

Use Block-chain (BC) to track ore mined throughout

the value chain

Reward employees and partners with instant

payments

Track warranties on parts with BC individually

Sell metals and minerals directly to end customer with BC (Track, recycle and resell)

Fully transparent mining –operations, supply chain and

all external stakeholders

Introduce advanced purification and recycling technology to

reduce/eliminate tailing

Implement digital water monitoring and automated

management

Establish Block-chain logging of water quality

Extract valuable minerals from waste streams

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment / Management

Stochastic dynamic model of mining process based on plan

and schedule

Mine smaller, richer ore bodies with small footprint

Integrate wearables to create the performance

augmented worker

Automate back-office processes

Zero water environmental impact mining

1 2 3 4 5

11

6 7

8 9 10

12 13 14 15 16

17 18 19 20 21

22 23 24 25 26

27 28 29 30

31 32 33 34 35

36 37 38 39 40

41 42 43 44 45

46 47 48 49 50

3 2 2

3

4

3

4

2 1

2

71

6 3

3

5

6

Permitting, Regulatory Database in GIS, transparency

of submitted information

11a

Reclamation, Handle it once approach, integrate planning/operations for tailings and reclamation placement

CMIC Surface Mining Roadmap7

Total Sum of sticky’s

3

211

3

1

3

3

7

9

4

16

7

1

0

17

Red Number is sum of sticky notes with contact name placed on each area.

Additional Focus Area added.

Additional Focus Area added.

Page 10: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment / Management 17

16

7

9

7

7

3

4

1

0

Road Map sorted highest to lowest, of number of areas of interest placed

(sticky notes with names).

Total Sum of sticky’s

Page 11: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap

1. Improve ore body knowledge

2. Integrated mine design, planning and

scheduling

3. Selective mining

4. Alternative hauling technologies

5. Modular mining

6. Integrated operations with intelligent work

environment

7. Automation

8. Electrification & renewable resources

9. Transact more efficiently

10. Improve Water Treatment / Management17

16

7

9

7

7

3

4

1

0

Introduce advanced purification and recycling technology to

reduce/eliminate tailing

Implement digital water monitoring and automated

management

Extract valuable minerals from waste streams

Zero water environmental impact mining

4648 49507 16 3

Establish digital twins of all equipment as well as full

mine and operations

Improve predictive analytics of equipment and mining

process performance

Fully digitalized operations with integrated

performance feedback loop

Integrate wearables to create the performance

augmented worker

2728 293046 33

Reduce core sampling

requirements

Integrate ore sensing at the face

Develop AI based ore models

4 5 73 2 2

Explore continuous cutting machines for bulk mining

Engineer ore sorting at the face and along the mining process to eliminate waste

12 144 3

Multi-modal system to optimize the flexibility and cost advantage

of different technologies

213

Electric, modular truck/truck train (trolley assist/Battery hybrid)

Remote operation integrated with

autonomous hauling

Explore application of alternative technologies

(Rail-veyor/RopeCon, other)

18 19 203 2 1

Remote centers to operate remote equipment

Full autonomous parts of the operations

33 3425

Use cheap renewable energy to clean and recycle

water

391

Develop modular equipment that can be containerized for easy

transport and on-site assembly

Use hybrid air vehicles to transport equipment

modules to remote sites

Decouple equipment life from life of the ore body.

Relocate equipment

22 23252 11

Stochastic dynamic model of mining process based on plan

and schedule

113

Total Sum of sticky’s

Red Number is sum of sticky notes placed on each area.

Items with no sticky notes not included.

Page 12: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap10. Improve Water

Treatment / Management17Introduce advanced purification

and recycling technology to reduce/eliminate tailing

Implement digital water monitoring and automated

management

Extract valuable minerals from waste streams

Zero water environmental impact mining

4648 49507 16 3

48

50

49

46

First Name Last Name Email Job Title CompanyKim Kasperski [email protected] Director Natural Resources CanadaFernanda Motta [email protected] Research Scientist CanmetENERGYMichael Tate [email protected] Marketing & Technical Manager Graymont Inc.Paul Cavanagh [email protected] Sr Technical Advisor ImperialTara Wang [email protected] Senior Tailings Engineer Alberta Energy RegulatorJean-Francois Bouffard [email protected] Director of Business Development NAIT Centre for Oil Sands SustainabilityAndrea Sedgwick [email protected] Ledcor Applied Research Chair NAIT

First Name Last Name Email Job Title CompanyKim Kasperski [email protected] Director Natural Resources Canada

First Name Last Name Email Job Title CompanyDean Robertson [email protected] Director Energy & Resources StantecGary White [email protected] Executive Director Alberta EnergyZvonko Burkus [email protected] Mine Water Policy Specialist Alberta Environment & Parks

First Name Last Name Email Job Title CompanyChelsea Fedrau [email protected] Environmental Assessment Officer Canadian Environmental Assessment AgencyAlebachew Demoz [email protected] Research Scientist NRCanHans Wolf [email protected] Specialist, Industrial, Energy & Mining Associated EngineeringKevin Turner [email protected] Manager, Process Engineering Wood Canada Ltd.Tara Wang [email protected] Senior Tailings Engineer Alberta Energy RegulatorKim Kasperski [email protected] Director Natural Resources Canada

Focus Group AreaP COSIA P CMIC P GMG P U of A

Contact Information for Areas of Interest

Total Sum of sticky’s

Page 13: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap6. Integrated operations

with intelligent work environment

16Establish digital twins of all equipment as well as full

mine and operations

Improve predictive analytics of equipment and mining

process performance

Fully digitalized operations with integrated

performance feedback loop

Integrate wearables to create the performance

augmented worker

2728 293046 33

First Name Last Name Email Job Title CompanyCorey McIvor [email protected] Senior Vice President Ledcor GroupNathan Ashcroft [email protected] StantecTravis Fischer [email protected] Implementation Engineer SMS EquipmentBrent Davis [email protected] VP Oil Sands and Mining solutions Finning CanadaBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.Jason Diniz [email protected] Manager, Mining Support SMS Equipment

28

First Name Last Name Email Job Title CompanyChelsea Fedrau [email protected] Environmental Assessment Officer Canadian Environmental Assessment AgencyJean-Francois Bouffard [email protected] Director of Business Development NAIT Centre for Oil Sands SustainabilityAndrea Sedgwick [email protected] Ledcor Applied Research Chair NAITBryce Monar [email protected] Corporate Engineering Manager Wood Canada Ltd.

27

First Name Last Name Email Job Title CompanyAli Chamanara [email protected] Lead Engineer, Mine Engineering CNRLTravis Fischer [email protected] Implementation Engineer SMS EquipmentBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.

30

29 First Name Last Name Email Job Title CompanyBryn Upham [email protected] Mining Engineering Co-op Student 3rd Year MIAC Student RepresentativeGerald Desrochers [email protected] Senior Director Western Canada CIMA Canada Inc.Brent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.

Contact Information for Areas of Interest

Total Sum of sticky’s

Focus Group AreaP COSIA P CMIC P GMG P U of A

Page 14: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap4. Alternative hauling

technologies

7. Automation

9

7

Multi-modal system to optimize the flexibility and cost advantage

of different technologies

213

Electric, modular truck/truck train (trolley assist/Battery hybrid)

Remote operation integrated with

autonomous hauling

Explore application of alternative technologies

(Rail-veyor/RopeCon, other)

18 19 203 2 1

Remote centers to operate remote equipment

Full autonomous parts of the operations

33 3425

First Name Last Name Email Job Title CompanyMike Anderson [email protected] R&D Reliability Team Leader Syncrude Canada Ltd.Greg Forgeron [email protected] HO Mining Reseach Manager ImperialClint Webster [email protected] Account Manager - Mining Alberta Brandt

21

18

First Name Last Name Email Job Title CompanyBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.Jason Diniz [email protected] Manager, Mining Support SMS Equipment

19

First Name Last Name Email Job Title CompanyAli Chamanara [email protected] Lead Engineer, Mine Engineering CNRL

20

33

34

First Name Last Name Email Job Title CompanyCalvin Batog [email protected] Chief Estimator Fort McKay Group of Companies LPRandy Gogowich [email protected] Heavy Equipment & Rentals MetalGerald Desrochers [email protected] Senior Director Western Canada CIMA Canada Inc.Bryce Monar [email protected] Corporate Engineering Manager Wood Canada Ltd.Brent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.

First Name Last Name Email Job Title CompanyMuneer Naseer [email protected] Director of Mines Occupational Health & Safety BranchBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.

First Name Last Name Email Job Title CompanyClint Webster [email protected] Account Manager - Mining Alberta BrandtBrent Davis [email protected] VP Oil Sands and Mining solutions Finning CanadaBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.

Contact Information for Areas of Interest

Total Sum of sticky’s Focus Group Area

P COSIA P CMIC P GMG P U of A

Focus Group AreaP COSIA P CMIC P GMG P U of A

Page 15: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap1. Improve ore body

knowledge

3. Selective mining

7

7

Reduce core sampling

requirements

Integrate ore sensing at the face

Develop AI based ore models

4 5 73 2 2

Explore continuous cutting machines for bulk mining

Engineer ore sorting at the face and along the mining process to eliminate waste

12 144 3

First Name Last Name Email Job Title CompanyDean Rokosh [email protected] Advisor, Energy and Minerals AER/AGGary Bunio [email protected] GM Strategic Technology SuncorMike Anderson [email protected] R&D Reliability Team Leader Syncrude Canada Ltd.

4

First Name Last Name Email Job Title CompanyMark Dekaban [email protected] Mining Research Lead ImperialJean-Francois Bouffard [email protected] Director of Business Development NAIT Centre for Oil Sands Sustainability

5

First Name Last Name Email Job Title CompanyAndrea Sedgwick [email protected] Ledcor Applied Research Chair NAITMark Dekaban [email protected] Mining Research Lead Imperial

7

First Name Last Name Email Job Title CompanyGreg Forgeron [email protected] HO Mining Reseach Manager ImperialTerry Condon [email protected] Business Development Argus Machine Co. Ltd.Michael Di Marco [email protected] Manager Mine Engineering Teck Resources LimitedMark Dekaban [email protected] Mining Research Lead Imperial

12

14 First Name Last Name Email Job Title CompanyMark Dekaban [email protected] Mining Research Lead ImperialAndrea Sedgwick [email protected] Ledcor Applied Research Chair NAITKeith Wilson [email protected] Stantec

Contact Information for Areas of Interest

Total Sum of sticky’s

Focus Group AreaP COSIA P CMIC P GMG P U of A

Focus Group AreaP COSIA P CMIC P GMG P U of A

Page 16: Meeting Notes Group Discussion Group Exercise …...Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019 ACR -Mining Industry Advisory Committee

Mining Industry Advisory Committee Research Summit Alberta Chamber of Resources January 31, 2019

CMIC Surface Mining Roadmap

2. Integrated mine design, planning and

scheduling

5. Modular mining

8. Electrification & renewable resources

3

4

1Use cheap renewable

energy to clean and recycle water

391

Develop modular equipment that can be containerized for easy

transport and on-site assembly

Use hybrid air vehicles to transport equipment

modules to remote sites

Decouple equipment life from life of the ore body.

Relocate equipment

22 23252 11

Stochastic dynamic model of mining process based on plan

and schedule

113

First Name Last Name Email Job Title CompanyCorey McIvor [email protected] Senior Vice President Ledcor Group

39

First Name Last Name Email Job Title CompanyClint Webster [email protected] Account Manager - Mining Alberta Brandt

22

First Name Last Name Email Job Title CompanyMichael Di Marco [email protected] Manager Mine Engineering Teck Resources Limited

23

25

First Name Last Name Email Job Title CompanyGeorge Rhodey [email protected] White [email protected] Industrial Professor Faculty of Engineering, U of AAlebachew Demoz [email protected] Research Scientist NRCan

11

First Name Last Name Email Job Title CompanyBrent Boutilier [email protected] Sr Project Manager Syncrude Canada LTD.Mike Anderson [email protected] R&D Reliability Team Leader Syncrude Canada Ltd.

Contact Information for Areas of Interest

Total Sum of sticky’s

Focus Group AreaP COSIA P CMIC P GMG P U of A

Focus Group AreaP COSIA P CMIC P GMG P U of A

Focus Group AreaP COSIA P CMIC P GMG P U of A