Meet The Team

Uday Durg, PE

Program Executive for Lower Manhattan Projects, MTACC

Hsin Wu, PE

Program Manager 

Bharat Kothari, PE

Program Manager 

Naresh Patel, PE

Construction Manager

Judy Duffy

Assistant Director, Government and Community Relations, MTA

Contact Number: 646‐252‐2652

Page 3: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Since We Last Saw You…

All contracts are now in construction and fully funded

Transit Center foundation –Completed August 16th 2010

Work progressing rapidly on A/C Mezzanine

Corbin Building restoration underway

Broadway sidewalk work ongoing 

Transit Center foundation in July 2010

Page 4: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

All Contracts Underway

Page 5: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Transit Center Foundation – Completed August 16th, 2010

Contract completed on time and within budget

Included underpinning of historic Corbin Building

Allows for restoration of the building for future use by the public

Will allow for a more accessible transfer between the A/C and 4/5 Stations

Page 6: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 03/2009

FSTC 05/2009

FSTC 07/2009

Page 7: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 09/18/2009

FSTC 09/25/2009

FSTC 10/06/2009

Page 8: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 10/28/2009

FSTC 11/16/2009

FSTC 12/11/2009

Page 9: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 01/19/2010

FSTC 03/01/2010

Page 10: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 04/02/2010

FSTC 05/03/2010

Page 11: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 06/04/2010

FSTC 06/25/2010

Page 12: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

FSTC 07/14/2010

FSTC 08/03/2010

Page 13: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

A/C Mezzanine Rehabilitation 

New Structural Framing

New Steel Columns

Page 14: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

A/C Mezzanine Rehabilitation 

Elevator Pit Work

Page 15: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

New Dey Street Entrance at Broadway

Erection of Dey Street Entrance Steel

Page 16: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Historic Corbin Building Restoration

Façade Demolition and Utility Work

Page 17: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Street and Sidewalk Work

Sidewalk work on west side of Broadway ongoing and scheduled to be completed early 2011

Work to put in new elevator at 129 Fulton and new entrance at 150 William to begin this quarter

135 William Street work                                         ongoing and new entrance                                        and elevator scheduled to                                       open late spring 2011

Page 18: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Broadway between Dey and Cortlandt StreetsCurrent to October 14, 2010

13’-0”

8’-0”

11’-0”11 ’-0”

11 ’-0”

LANE

LANE

12 ’-0”15 ’-6”

LANE

LANE

12 ’- 0”15 ’-6”

LANE

TAPEREDBARRIER

ARROW BOARD

2’-0”JERSEY

BARRIER (TYP)

CO

RT

LA

ND

T ST

RE

ET

DE

Y ST

RE

ET

Work HoursWork Hours7:00 AM 7:00 AM –– 12:00 AM12:00 AM

3’ CONCRETE BARRIERS TOPPED WITH 5’ HIGH MESH FENCE TO ALLOW SIGHT LINES TO BUSINESSES ALONG BROADWAY

Notes:WDF to work two shifts per day to complete work.Work on-going – work areas to shift as required.

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

RAMP

WORK BY OTHERS

BROADWAY

LANE

11 ’-0”

11’-0”

AT LEAST 8’ OF PEDESTRIAN WALKWAY

PLYWOOD & MESH FENCE

60’ CLEARANCE FROM SOUTH CURB OF DEY STREET

11

WOODEN BARRIERS

Page 19: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Broadway between Fulton and Dey Streets – Phase 1September 20 – October 14, 2010

CORTLANDT ST.

JOHN ST.

MAIDEN LANE

DEY ST.

FULTON ST.

MAINTAIN TWO (2) 11’WIDE TRAVEL LANES AT ALL TIMES

PEDESTRIAN WALKWAY

CONTRACTOR MAY ONLY WORK ONE SIDE OF DEY STREET AT A TIME

DEY STREET HEAD HOUSE

Note: Since both roads (Fulton Street and Broadway) cannot be closed at the same time, the work will be done in phases. Details of proposed MPT to be developed by Contractor .

CORBIN BLDG.

TRANSIT CENTER BUILDING

MPT REQUIREMENTS TO BE ADJUSTED TO MAINTAIN PEDESTRIAN AND TRAFFIC FLOW AS REQUIRED

Work HoursWork Hours7:00 AM 7:00 AM –– 12:00 AM12:00 AM

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

WORK BY OTHERS

CONTRACTOR TO KEEP HALF OF SIDEWALK OPEN FOR PEDESTRIAN TRAFFIC AT ALL TIMES

PLYWOOD & MESH FENCE 12

Page 20: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Fulton Street between Broadway and Nassau Street

Nas

sau

St.

To Broadway

.

Phase Activities: 1. Install sewer along south curbline of Fulton Street by 4B Contractor expected in

2011 or in 2012 (not shown).

2. After completion of work, replace roadway, sidewalk and curb in 2012 or later according to standard NYCT roadway new 3” thick asphaltic concrete wearing course. Concrete base to match existing thickness.

RESTORE DISTURBED PAVEMENT TO MATCH EXISTING CONDITIONS

8’ PEDESTRIAN WALKWAY

11’ TRAVEL LANE CONCRETE BARRIER

TIMBER BARRIER

TRANSIT CENTER

BUILDING

EXISTING MPT 4A

144 FULTON STREET

FULTON STREET6’ PEDESTRIAN WALKWAY

25’

Work HoursWork Hours7:00 AM 7:00 AM –– 10:00 PM10:00 PM

ACCESS GATEMOVEABLE BARRIEREXIT GATE

10’

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

ACCESS HOLE

WORK BY OTHERS

PLYWOOD & MESH FENCE 13

Page 21: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Pending Agreement with 129 Fulton Street

FULTON STREET

11’ TRAVEL LANE

129 FULTON STREET

PEDESTRIAN WALKWAY

SUBWAY STAIR ENTRANCE

NA

SSA

U S

TR

EE

T

8’PEDESTRIAN WALKWAY

127 FULTON STREET

CURBLINE

Work HoursWork Hours7:00 AM 7:00 AM –– 10:00 PM10:00 PM

DU

TC

H S

TR

EE

T

8’

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

WORK BY OTHERS

Notes:

1. Asbestos removal at 129 Fulton Street completed.

2. Coordination with the owner of 129 Fulton Street to relocate the building utilities required prior to Skanska’s start.

3. Elevator installation to take one year.

4. Crossroads project façade work at 127 Fulton Street to take four months from start date.

5. After installation of elevator, restore roadway, sidewalk and curb. MPT to be adjusted as required in 2012.

PLYWOOD BARRICADE BY OTHERS – SCHEDULE UNKNOWN

CROSSROADS PROJECT –EXPECTED TO USE / MAINTAIN SCAFFOLD

PLYWOOD & MESH FENCE

SKANSKA TO INSTALL ELEVATOR AT 129 FULTON STREET – WORK EXPECTED TO LAST ONE YEAR

125 FULTON STREET

125 FULTON STREET VAULT WORK TO BE COMPLETED

14

Page 22: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Intersection of Fulton and William Streets

WIL

LIA

M S

TR

EE

T

135 WILLIAM STREET

NEW ASPHALT STREET CURRENTLY CONTROLLED BY OTHERS. MPT PLANS TO BE FINALIZED IN 2012.

6’ PEDESTRIAN WALKWAY

DECKING

Phase Activities:

1. Decking along sidewalk of William completed.

2. Current work being coordinated with DDC (Trocom) work at Fulton/William Intersection

3. Installation of new roof structure connection into 135 William Street started March 2010 and will continue through 2012.

4. Restore roadway, sidewalk and curb in 2012. MPT to be adjusted as required’

Note: DOT approved MPT shown in red. Remaining MPT pending approval.

TIMBER BARRIER

15

150 WILLIAM STREET

FULTON STREET

WIL

LIA

M S

TR

EE

T

11’ TRAVEL LANE

Work HoursWork Hours7:00 AM 7:00 AM –– 10:00 PM10:00 PM

CROSSWALKS SERVICED BY EXISTING TRAFFIC SIGNAL

CROSSWALKS

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

WORK BY OTHERS

PLYWOOD & MESH FENCE

AREA EXTENDED FOR CON ED & ECS UTILITY RELOCATION WORK ON-GOING

CONCRETE BARRIER

SIDEWALK WORK EXPECTED TO START NOVEMBER 26, 2010 THROUGH MAY 2011

125’±

6 FT. GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF STREET- TBD.

Page 23: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

John Street between Broadway and Nassau St. – June 2010 Through Nov. 2012

Trailer and Loading Area

ACCESS GATEMOVEABLE BARRIER

WorkWork HoursHours7:00 AM 7:00 AM –– 5:00 PM5:00 PM

Open SidewalkOpen SidewalkFall 2010Fall 2010

PEDESTRIANWALKWAY

HYDRANT

ACCESS GATEMOVEABLE BARRIER

BR

OA

DW

AY

NA

SS

AU

ST

RE

ET

JOHN STREET

SIDEWALK CLOSEDSIDEWALK

CLOSED

EGRESSMOVEABLE BARRIER

CHAIN LINK AND MESH FENCE

11’ TRAVEL LANE

161’-11

17’-6

CHAIN LINK AND MESH FENCE

Schedule: 34 Months Schedule: 34 Months 2/2010 2/2010 –– 11/201211/2012

Note: To be coordinated with work to be performed at 24 John Street

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

WORK BY OTHERS

PLYWOOD & MESH FENCE

8FT. HIGH PLYWOOD BRRIERR

PROPERTY LINE BOX TO BE COMPLETED WHEN SKANSKA FINISHES THE ROOF STRUCTURE

16

Page 24: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Broadway between Vesey and Fulton Streets – Phase 2

CORTLANDT ST.

JOHN ST.

MAIDEN LANE

DEY ST.

FULTON ST.

MAINTAIN TWO (2) 11’WIDE TRAVEL LANES

PEDESTRIAN WALKWAY

CONTRACTOR MAY ONLY WORK ONE SIDE OF FULTON STREET AT A TIME

DEY STREET HEAD HOUSE

17

CORBIN BLDG.

TRANSIT CENTER BUILDING

MPT REQUIREMENTS TO BE ADJUSTED TO MAINTAIN PEDESTRIAN AND TRAFFIC FLOW AS REQUIRED Work HoursWork Hours

7:00 AM 7:00 AM –– 10:00 PM10:00 PM

Note: Since both roads (Fulton Street and Broadway) cannot be closed at the same time, the work will be done in phases. Details of proposed MPT to be developed by Contractor .

LEGENDLEGEND

PEDESTRIAN WALKWAY

PROPOSED MPT WORK ZONE

CONCRETE BARRIERSTIMBER BARRIERS

DOT APPROVED MPT AREA

FSTC WORK SITE

CONSTRUCTION BARRICADES4’ HIGH FENCE

CROSSWALKS

WORK BY OTHERS

PLYWOOD & MESH FENCE

Page 25: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Community Outreach

Local business banners up on Fulton, John and William Streets

Large Broadway banner featuring project renderings

New Downtown Alliance wayfindingbanner up at corner of Dey and Broadway

Be on the lookout for new signage around the holidays!

Page 26: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Community Outreach

Post local business information on MTA’s website and local organizations’websites similar to 2nd Ave Subway’s “Shop 2AVE” program

Page 27: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Community Outreach

Regular meetings with the Downtown Alliance, Community Board 1 and NYC Department of Transportation 

Daily site walkthroughs with checklist

Page 28: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Coming in 2011…New Dey Street Entrance and Retail

Page 29: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Coming in 2011…Rehabilitated Cortlandt Street Station! 

Page 30: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Coming in 2011…New Dey Street Concourse & 4/5 Connection

Page 31: Meet - Home | MTAweb.mta.info/capital/fc_docs/09 30 2010 Fulton...Bharat Kothari, PE ... GAS MAIN CONNECTING TO 135 WILLIAM ST. WILL TAKE 2 WEEKENDS AND FULL CLOSURE OF ... New Fulton

Coming in 2011…2012…2013…2014

Customer Benefit 2009 2011 2012 2013 2014

Cortlandt Street R Station NB Platform (COMPLETED) Nov

Mar

New 135 William Street Entrance May

New Fulton St A/C to 4/5 Connection  Aug

Cortlandt Street R Station SB Platform  Sept

4/5 Fulton Street Station Rehab July

New Dey Street Entrance July

Opening of Dey Street Concourse Nov

New Escalator to John Street Nov

Corbin Building Restoration & First Fl Retail Dec

Opening of A/C Mezzanine

Opening of Transit Center Building June