Medical Isotope P d ti F ilit Production Facility (MIPF) Construction Permit Application Permit Application NRC Public Meeting March 26, 2015

Transcript of Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Page 1: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Medical Isotope P d ti F ilit Production Facility (MIPF) Construction Permit ApplicationPermit Application

NRC Public MeetingMarch 26, 2015

Page 2: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Our MissionProvide a reliable supply of medical di ti d th ti

Ou ss o

diagnostic and therapeutic radioisotopes in the United States

2

Page 3: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

AgendagTopic Presenter

Introduction Carmen Bigles

Project & Site Overview Caroline Schlaseman

Design Progress Veronica Garea

Environmental Report Progress Vanessa Newton

QA and SGI Programs Caroline Schlaseman

Questions NRC Staff PublicQuestions NRC Staff, Public

Conclusion Carmen Bigles

3

Page 4: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Our TeamCoquí

U.S. company that will own and operate the MIPF

Ou ea

INVAPDesign Authority for the MIPF

Hogan LovellsNuclear regulatory and environmental attorneys

Gresham, Smith and Partners (GS&P)Consultant for siting, environmental data collection,

d i t l t (ER) tiand environmental report (ER) preparation

MPR AssociatesCoquí Owner’s Engineer and consultant

4

Page 5: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Project &Project &Site OverviewSite Overview

5

Page 6: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

MIPF DescriptionFacility includes:

Two pool-type low-enriched

esc p oo poo ype o e c ed

uranium (LEU) reactorsRadioisotope processing plant

i i iWaste conditioning plantSupport services and administrative offices

Designed and constructed by INVAP with Designed and constructed by INVAP with proven technologies tailored to Coquí’sspecific needsspecific needsLEU targets produce Mo-99 and I-131Planned Mo-99 capacity of MIPF is 7,000 Planned Mo 99 capacity of MIPF is 7,000 six-day curies per week

6

Page 7: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

MIPF Site S eNorth Central FloridaAlachua CountyyTown of AlachuaProgress Corporate ParkZoned: “Corporate Park”Available skilled work f (U i it f Fl id force (University of Florida and high tech industry area)area)Nearest population center is Gainesville, FL 10 miles SEis Gainesville, FL 10 miles SE

7

Page 8: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Attractive Site FeaturesAttractive Site FeaturesJanuary 2015 completed transaction with University of Florida Foundation for 25-acre parcel of land on which Coquí MIPF will be built

“The University of Florida Foundation is proud to beThe University of Florida Foundation is proud to be a partner in this exciting venture with Coquí RadioPharmaceuticals, a partnership that will provide opportunities for collaboration with UFprovide opportunities for collaboration with UF engineering and medical researchers, and bolster the development of high-paying jobs and infrastructure for a biotech research park in Alachua County.”

--Tom Mitchell, Vice President for Development and , pAlumni Affairs at the University of Florida

8

Page 9: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Attractive Site FeaturesAttractive Site FeaturesKnowledgeable local emergency responders due to University of Florida Training Reactor (UFTR)Existing state emergency plan due to power reactors in Florida

Coquí Siteq~25 Acres

9

Page 10: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Attractive Site FeaturesAttractive Site Features106 feet above mean sea levelTopography slightly slopedL t d i Located in Compact Region with reliable with reliable disposal of Class A, B, and C radioactive waste

10

Page 11: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Administration BuildinggArtist’s Rendering

11

Page 12: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Administration BuildinggArtist’s Rendering

12

Page 13: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Design Progressg g

13

Page 14: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

INVAP Contract SignedINVAP Contract SignedNovember 2014 signed contract with INVAP to design MIPF in Alachua FL INVAP to design MIPF in Alachua, FL

Argentine nuclear engineering firm Over 30 years of nuclear development Over 30 years of nuclear development Over 15 reactors and related facilities across the world including production across the world, including production of medical isotopes:

OPAL reactor in AustraliaETRR-2 reactor in EgyptNUR reactor in Algeria

Coquí MIPF will use technology similar to

14

Coquí MIPF will use technology similar to that employed in OPAL facility in Australia

Page 15: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

INVAP Design MilestonesINVAP Design MilestonesDetailed Division of Responsibilities (DOR) Detailed Division of Responsibilities (DOR) for Preliminary Safety Analysis Report (PSAR) sections established(PSAR) sections established

Schedule of key milestones:1. Preliminary Design Review Meeting—April 20152. Critical Design Review Meeting—August 20153 Submittal of PSAR portion of Construction Permit 3. Submittal of PSAR portion of Construction Permit

Application 4th Quarter 2015

15

Page 16: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Environmental Report pProgressg

16

Page 17: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Environmental ReportEnvironmental ReportSite environmental monitoring performed Site environmental monitoring performed throughout last year and is continuingEnvironmental Report (ER) approximately Environmental Report (ER) approximately 85% completeER submittal planned for early 4th p yQuarter 2015 (~2 months prior to PSAR)ER to be subject of next NRC public j pmeeting in May-June timeframe

17

Page 18: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

QA and SGI QProgramsg

18

Page 19: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Quality Assurance (QA)Quality Assurance (QA)Coquí Quality Assurance Program Coquí Quality Assurance Program Description (QAPD) developedMPR’s initial audit of INVAP’s QA program MPR s initial audit of INVAP s QA program complete

Program complies with ANSI/ANS 15.8 per gNUREG-1537No audit findings; two recommendations

I R 0 C í QAPD id A ilIssue Rev. 0 Coquí QAPD mid-AprilFuture audits to be conducted for procurement and construction phases

19

procurement and construction phases

Page 20: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Safeguards Information (SGI) g ( )Program

Coquí Safeguards Information (SGI) P b i d l dProgram being developed

10 CFR Part 3710 CFR Part 7310 CFR Part 73

20

Page 21: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

QuestionsQ

21

Page 22: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

Conclusion

22

Page 23: Medical Isotope P d ti F ilit Production Facility (MIPF) Construction ...

ConclusionConclusion1. Land transfer from UF Foundation completed 1. Land transfer from UF Foundation completed

January 20152. Significant progress on MIPF design since last

NRC meeting in October 2014NRC meeting in October 20143. Environmental Report (ER) development on-

going and will be topic of next NRC meeting in May-June

4. Progress on “enterprise” programs, e.g., QA and SGI on-goingSGI on going

Planning for 4th Quarter 2015 submittal of C í MIPF C t ti P it A li ti

23

Coquí MIPF Construction Permit Application