Mechanical Comments

1
AGNOil HEEDED I NTER.OFFICE MEMORAN DUM To From Project Engineering Dept. r^rt"'vtd Y'^ 'ttr -u'r'l"/ Architectural Department Washington Place Block 58 Commercial Center Date : 4September2012 Ref. No.: IOM-PLN-ARCH-12-039 Subject: MechanicalGomments \Mth reference to our checking based on the mechanical proof print, we hereby made comments on the follottring: (See also the attached comments on proof print) Hope to be noted on these changes and corrections, thank you. Prepared by; Noted by: Arch. Paoe # Comments M{1 1. We trave submitted our criteria and plans that we have air duc{s (for heat exhaust), as shown on the plans, and the dimensions are 0.45m x 0.90m. There is also a detailed drawing of the said air ducl sleeves, pages M-7 & M-9 of the plans we have submitted. a. Question: ls the size we gave for ihe air duct chase/sleeve enough for each store at alfresco area to exhaust heat? b. Provide standard detail of air ducl for heat exhaust, section and isometric. Please reflect the details of our air-duct sleever/chase drawings we have submitted. Regarding Mechanical General Notes #8b., we don't have floor mounled ACCU, we only have wall mounted ACCU and we have submitted our detail drawings for this. Kindly refer it on pages M-5, M- 6, M-8, & A-94 of the plans we have submitted before. Please follow the drawing details to prevent leak. Regarding Mechanical General Notes #14, omit this section since there is no elevator for this projec{. Comment on drawing 2lC-M01, please refer to the mechanical plan drawing inputs we have submitted on Daoes M-5 (3/M-5). M-6 (2/M-6), l/.7 (2lM'7\, & M-9 (4/M-9), 2. 3. 4. 5. M-02 Regarding riser iocations through roof deck, please refer to the mechanical drawing inputs we have submitted on pages M-1 (Ground Floor), and M-5 (Second Floor). The small circles represent ths sleeves. Do nol use allotted air duct chase/sleeve which is for heat exhaust. 1_ M{3 Riser sleeves from ground floor, please refer to the mechanical drawing inputs we have submitted on pages M-1 (Ground Floor) and M-5 (Second Floor). The small circles represent the sleeves. Do not use the air duct chase/sleeve as sleeves for refrigerant risers. Use the baseolan we oave on M-5 (1/M-5) Buildins 1 Second Floor Plan. 1. 2. 3. M-04 @sthroughroofdeck,pleaserefertothemechanicaldrawinginputswehave submitted on pages M-2 (Ground Floor), and M-6 (Second Floor). The small circles represent the sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust. 1. M{5 r,pleaserefertothemechanicaldrararinginputswehavesubmittedon pages M-2 (Ground Floor) and M-6 (Second Floor). The small circles represent the sleeves. 2. Do not use the air duct chase/sleeve as sleeves for refrigerant rises. 3. Use the baseplan we gave on M-6 (1/M'6) Building 2 Second Floor Plan M{6 1 @1hroughroofdeck,pleaserefertothemechanicaldrawinginputswehave submitted on pages M-3 (Ground Floor), and M-7 (Second Floor). The small circles represent the sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust. M{7 REei steeves from ground floor, please refer to the mechanical drawing inputs we have submitted on pages M-3 (Ground Floor) and M-7 (Second Floor). The small circles represent the sleeves. Do not use the air duct chase/sleeve as sleeves for refrigerant risers. Use the baseolan we qave on M-7 (1/M-5) Building 3 Second Floor Plan" 1. 2. 3. M{t8 @roofdeck,pleaserefertothemechanicaldrawinginputswehave submitted on pages M-4 (Ground Floor), and M-8 (Second Floor). The small circles represent the sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust. 1. M-09 aserefertothemechanicaldrawinginputswehavesubmittedon pages M-4 (Ground Floor) and M-8 (Second Floor). The small circles represent the sleeves. Do not use the air duct chase/sleeve as sleeves for refrigerant risers. Use the baseplan we gave on M-8 (1/M-8) Building 5 Second Floor Plan 1. 2. 3.

description

mechanical comments

Transcript of Mechanical Comments

Page 1: Mechanical Comments

AGNOil HEEDED

I NTER.OFFICE MEMORAN DUM

ToFromProject

Engineering Dept. r^rt"'vtd Y'^ 'ttr -u'r'l"/

Architectural DepartmentWashington Place Block 58 Commercial Center

Date : 4September2012Ref. No.: IOM-PLN-ARCH-12-039Subject: MechanicalGomments

\Mth reference to our checking based on the mechanical proof print, we hereby made comments on the follottring:(See also the attached comments on proof print)

Hope to be noted on these changes and corrections, thank you.

Prepared by;

Noted by:

Arch.

Paoe # CommentsM{1 1. We trave submitted our criteria and plans that we have air duc{s (for heat exhaust), as shown on the

plans, and the dimensions are 0.45m x 0.90m. There is also a detailed drawing of the said air duclsleeves, pages M-7 & M-9 of the plans we have submitted.

a. Question: ls the size we gave for ihe air duct chase/sleeve enough for each store at alfresco areato exhaust heat?

b. Provide standard detail of air ducl for heat exhaust, section and isometric.

Please reflect the details of our air-duct sleever/chase drawings we have submitted.Regarding Mechanical General Notes #8b., we don't have floor mounled ACCU, we only have wallmounted ACCU and we have submitted our detail drawings for this. Kindly refer it on pages M-5, M-

6, M-8, & A-94 of the plans we have submitted before. Please follow the drawing details to prevent

leak.Regarding Mechanical General Notes #14, omit this section since there is no elevator for this projec{.

Comment on drawing 2lC-M01, please refer to the mechanical plan drawing inputs we havesubmitted on Daoes M-5 (3/M-5). M-6 (2/M-6), l/.7 (2lM'7\, & M-9 (4/M-9),

2.3.

4.5.

M-02 Regarding riser iocations through roof deck, please refer to the mechanical drawing inputs we have

submitted on pages M-1 (Ground Floor), and M-5 (Second Floor). The small circles represent thssleeves. Do nol use allotted air duct chase/sleeve which is for heat exhaust.

1_

M{3 Riser sleeves from ground floor, please refer to the mechanical drawing inputs we have submitted onpages M-1 (Ground Floor) and M-5 (Second Floor). The small circles represent the sleeves.Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseolan we oave on M-5 (1/M-5) Buildins 1 Second Floor Plan.

1.

2.3.

M-04 @sthroughroofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-2 (Ground Floor), and M-6 (Second Floor). The small circles represent the

sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.

1.

M{5 r,pleaserefertothemechanicaldrararinginputswehavesubmittedonpages M-2 (Ground Floor) and M-6 (Second Floor). The small circles represent the sleeves.

2. Do not use the air duct chase/sleeve as sleeves for refrigerant rises.3. Use the baseplan we gave on M-6 (1/M'6) Building 2 Second Floor Plan

M{6 1 @1hroughroofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-3 (Ground Floor), and M-7 (Second Floor). The small circles represent the

sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.M{7 REei steeves from ground floor, please refer to the mechanical drawing inputs we have submitted on

pages M-3 (Ground Floor) and M-7 (Second Floor). The small circles represent the sleeves.Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseolan we qave on M-7 (1/M-5) Building 3 Second Floor Plan"

1.

2.3.

M{t8 @roofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-4 (Ground Floor), and M-8 (Second Floor). The small circles represent the

sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.

1.

M-09 aserefertothemechanicaldrawinginputswehavesubmittedonpages M-4 (Ground Floor) and M-8 (Second Floor). The small circles represent the sleeves.

Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseplan we gave on M-8 (1/M-8) Building 5 Second Floor Plan

1.

2.3.