Mec, veracruz 2013

48
PROJECTS MADE IN MARINE ENGINEER CORP, BRANCH VERACRUZ YEAR 2013 GENERAL AND PROJECT MANAGER: NELSON AGUIRRE B. MR AGUIRRE IS A CHILEAN NAVAL ELECTRICAL ENGINEER (RETIRED OFFICER OF CHILEAN NAVY), PLANNER AND LEADER OF WORKING TEAM, WITH 25 YEARS WORKING IN THE CHILEAN NAVY. EXPERIENCE IN PLANNING, COORDINATION, SUPERVISION AND CONTROL OF WORKS, WORKING IN THE DIRECTION AND PLANNING OF LOGISTIC PROCESSES AND MANAGEMENT.

description

 

Transcript of Mec, veracruz 2013

Page 1: Mec, veracruz 2013

PROJECTS MADE IN MARINE ENGINEER CORP, BRANCH VERACRUZ

YEAR 2013GENERAL AND PROJECT MANAGER: NELSON AGUIRRE B.

MR AGUIRRE IS A CHILEAN NAVAL ELECTRICAL ENGINEER (RETIRED OFFICER OF CHILEAN NAVY), PLANNER AND LEADER OF WORKING TEAM, WITH 25 YEARS WORKING IN THE CHILEAN NAVY. EXPERIENCE IN PLANNING, COORDINATION, SUPERVISION AND CONTROL OF WORKS, WORKING IN THE DIRECTION AND PLANNING OF LOGISTIC PROCESSES AND MANAGEMENT.

Page 2: Mec, veracruz 2013

PATROL VESSEL “TABOGA”LOA : 31.2 MTSBEAM: 7.31 MTSDWT : 167 TONS

Page 3: Mec, veracruz 2013

PATROL VESSEL “TABOGA” AFTER ARRIVE TO SHIPYARD

Page 4: Mec, veracruz 2013

STARTING THE SANDBLASTING

SANDBLASTING COMPLETE(WITH NEW PILOT HOUSE)

Page 5: Mec, veracruz 2013

DISMANTLING THE OLD PILOT HOUSE

Page 6: Mec, veracruz 2013

OLD PILOT HOUSE

MAKING THE NEW PILOT HOUSE

Page 7: Mec, veracruz 2013

REPLACING PART OF THE SHELL PLATE

Page 8: Mec, veracruz 2013

VERIFYING DEFLECTION OF THE TAIL SHAFT

REPLACING BOTH PROPELLERS FOR NEW ONES, ACCORDING WAS DESIGNED

Page 9: Mec, veracruz 2013

PAINTING THE WHOLE VESSEL

Page 10: Mec, veracruz 2013

UNDOCKING MANEUVERING

PATROL VESSEL “TABOGA” READY TO SAIL

Page 11: Mec, veracruz 2013

PASSENGER VESSEL “PACIFIC QUEEN”LOA : 36.84 MTSBEAM: 7.74 MTS

Page 12: Mec, veracruz 2013

PACIFIC QUEEN, ARRIVING TO SHIPYARD

CONDITION OF THE HULL AT THE ARRIVING

Page 13: Mec, veracruz 2013

RENWING PART OF THE SHELL PLATE

Page 14: Mec, veracruz 2013

REPAIRING VALVES

REPAIRING THE LINE SHAFT

Page 15: Mec, veracruz 2013

REPAIRING AND POLISHING PROPELLERS

Page 16: Mec, veracruz 2013

UNDOCKING MANEUVERING OF PACIFIC QUEEN

Page 17: Mec, veracruz 2013

LANDING CRAFT “GENERAL ESTEBAN HUERTAS”LOA : 38 MTSBEAM: 11 MTSDWT : 313 TONS

Page 18: Mec, veracruz 2013

GENERAL DEL “ESTEBAN HUERTAS” ARRIVING TO SHIPYARD

Page 19: Mec, veracruz 2013

CONDITION OF HATCHES

DISALIGNMENT OF SHAFT LINE IN PORT AND STARBOARD SIDE.THE STRUT AND STERN TUBE, WAS MACHINED

REPLACING PIPE IN BAD CONDITION

BASES OF WINCH AND CRANE IN BAD CONDITION, WAS MADE NEW.

Page 20: Mec, veracruz 2013

REPLACING THE MAIN ENGINES AND GENERATORS

Page 21: Mec, veracruz 2013

REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK

Page 22: Mec, veracruz 2013

REPLACING MORE THAN 38 TONS OF STEEL, FROM THE HULL AND MAIN DECK

Page 23: Mec, veracruz 2013

NEW KEEL COOLERS WERE MADE

STEEL REPLACED

STEEL REPLACED

STEEL REPLACED

Page 24: Mec, veracruz 2013

DISMANTLING THE OLD STRUCTURE

Page 25: Mec, veracruz 2013

NEW STRUCTURE FINISHED

Page 26: Mec, veracruz 2013

INSIDE OF THE STRUCTURE, BEFORE TO STAR WORKING

Page 27: Mec, veracruz 2013

INSIDE AFTER TO FINISH

Page 28: Mec, veracruz 2013

UNDOCKING MANEUVERING

Page 29: Mec, veracruz 2013

BARGE INTERCOASTAL “IMI 102”LOA : 54.86 MTSBEAM: 16.4 MTSDWT : 1,063 TONS

Page 30: Mec, veracruz 2013

BARGE ARRIVING TO SHIPYARD

Page 31: Mec, veracruz 2013

CONDITION OF THE HULL BEFORE TO START WORKING

Page 32: Mec, veracruz 2013

WASHING WITH H.P WATERJET

AFTER TO WASH THE BARGE

Page 33: Mec, veracruz 2013

REPLACING STEEL PLATE

Page 34: Mec, veracruz 2013

REPLACING STEEL PLATE

Page 35: Mec, veracruz 2013

COMPLETE SANDBLASTING SA 2

PAITING THE WHOLE BARGE

Page 36: Mec, veracruz 2013

CLEANING INSIDE THE TANKS

Page 37: Mec, veracruz 2013

BARGE, PAITED AND FINISHED

Page 38: Mec, veracruz 2013

UNDOCKING MANEUVERING

Page 39: Mec, veracruz 2013

SUPPLY VESSEL “CÉBACO BAY”LOA : 29.6 MTSBEAM: 7.9 MTSDWT : 86 TONS

Page 40: Mec, veracruz 2013

ARRIVING TO SHIPYARD

Page 41: Mec, veracruz 2013

CONDITION OF THE HULL BEFORE TO START WORKING

Page 42: Mec, veracruz 2013

SCRAPPING THE HULL

Page 43: Mec, veracruz 2013

CONDITION OF THE VESSEL AFTER TO WASH WITH H.P. WATERJET

Page 44: Mec, veracruz 2013

MAKING SANDBLASTING

Page 45: Mec, veracruz 2013

PAINTING THE WHOLE VESSEL

Page 46: Mec, veracruz 2013

STEEL WORK

MAKING NEW EXPANSION TANKS FOR THE MAIN ENGINES

Page 47: Mec, veracruz 2013

FINISHING THE JOB

Page 48: Mec, veracruz 2013

UNDOCKING MANEUVERING