Transcript of Measurement 4 Presentation (QS)
project forDouble Storey Terrace House
Copyright © Oompa Loompa SDN.BHD. All rights reserved.
DarrenWilson
EnochHasif
Cromwell
Pui SunChloe
PROPOSED PROJECTThe Construction and Completion of a single unit Double Storey Terrace House A (Corner Lot) On Lot 509 (KOT 9541), Block 5, Sentah Segu Land District at 17th Mile of Kuching - Serian Road, Kuching, Sarawak
Architect :Design Network ArchitectsNo. 58, Iris Garden Square, Jalan Tong Wei Tah, 93200 Kuching Sarawak.Tel : 082-255082 Fax : 082-255081E-mail : [email protected]
Civil & Structural Engineer :ESWEL ENGINEERS SDN BHD2nd Floor, Lot 10148, Section 64, KTLD, Jalan Kwong Lee Bank, Pending, 93450 Kuching, SarawakTel : 082-342608 Fax : 082-334875E-mail : [email protected]
Quantity Surveyor :Oompa Loompa SDN BHDJalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor, MalaysiaTel : 03-56295000E-mail : [email protected]
Scope of workSCOPE OF WORKS
Serian Road, Kuching, Sarawak
LOCATION OF SITE
PLANS AND ELEVATIONS
DOUBLE STOREY TERRACE HOUSE
TENDER DOCUMENTATION
TENDER FORM
PAM FORM-Form of agreement and condition, PAM Contract 2006
Formally known as the PAM Contracts 2006
Contains clauses and conditions that both the client and contractors must abide to.
TENDER FORM
For this project, all clauses are used but we suggest that Clauses that involve the client are to be nullified.
Clauses deemed to be nullified shall suggestively be Clauses:
-Clause 20.B and Clause 20.C
TENDER FORM
TENDERING METHOD
SELECTIVE-A pre-selected list of tenderers are prepared.
RM 5,000.00-Shall become payable by contractor immediately on receipt of notice in writing given to contractor by the client or its authorized representative
-The bank guarantee is effective from the date of submission of tender document by the tenderer and is to remain in force until a notice in writing to discontinue the same is given by the client or its authorized representative or until the tenderer is notified writing that his tender is unsuccessful.
EARNEST MONEY
PERFORMANCE BOND
5% of contract sum-If the Contractor shall in any respect fail to execute the contract or commit any breach of its obligations thereunder then the guarantor shall indemnify and pay the to the client.
-The bank guarantee shall be irrevocable and shall remain in force until the date of Certificate of Making Good Defects plus 3 months and 14 days in the said contract or any authorized extension, and in the case of the contract being determined, one year after the date of the determination claims, if any, must be received by the guarantor within the period of guarantee.
COMMENCEMENT DATE
4th of JULY 2016
COMPLETION DATE
30th of JUNE 2017
PRIME COST SUM
Electrical InstallationRM 20,000.00
Cold Water and Sanitary PlumbingRM 8,500.00
PROVISIONAL SUM
Builder's work in connection w/ M&E servicesRM 400.00
ContingenciesRM 10,000.00
Liquidated and Ascertained Damages
0.0181% per Day
damages whose amount the parties designate during the formation of a contract for the injured party to collect as compensation upon a specific breach
Liquidated and Ascertained Damages
Liquidated damages is set at 0.0181To ensure that contractors do not strictly delay the construction period.The percentile is set per day.
Liquidated and Ascertained Damages
Contractors are to get a Registered Surveyor to scout out discrepancies in the site.
Within the three weeks of handing the site over, Contractors are to inform Architects in charge to solve those discrepancies if found on site.
SITE SURVEY
Analysis of a proposed project to determine if it is profitable.
Summary of how profitable this project will be, we have taken two weeks into a feasibility study session.
FEASIBILITY STUDY
Located at the 17th Mile of Kuching.
Location is where commercial activities are carried out, which are shopping centers and what not.
FEASIBILITY STUDY
FINISHES
External Wall Cement Plaster with ICI Weathershield Paint
WALL FINISHES
Internal wall Cement Plaster with 'ICI' Weathershield paint (
all rooms)
WALL FINISHES
Internal wall (cont’d) 105mm x 105mm x 7mm 'Guocera' glazed
ceramic tiles (bathrooms)
WALL FINISHES
External floor Homogenous non-slip tiles
FLOOR FINISHES
Internal floor 50mm x 300mm x 10mm thick Kempas
hardwood parquet flooring (entry, living & dining, study room, store, staircase)
300mm x 600mm thick 'Kimgres' homogenous non-slip floor tiles (dry & wet kitchen, bathrooms)
FLOOR FINISHES
External ceiling Skim Coating, Cement Plaster with 'ICI'
emulsion paint (balcony) 9mm thick sloping moisture resistance fibrous
gypsum plaster ceiling
CEILING FINISHES
Internal ceiling 9mm thick fibrous gypsum plaster ceiling 9mm thick moisture resistance fibrous gypsum
plaster ceiling (bathrooms)
CEILING FINISHES
50mm x 300mm x 10mm thick Kempas hardwood parquet flooring
38mm x 50mm hardwood timber (handrailing)
STAIRCASE FINISHES
Washdown water closet Wall hang basin Single bow kitchen bow Bib tap
SANITARY FITTINGS
Brass head shower Toilet paper holder Floor trap
SANITARY FITTINGS
EXTERNAL WORKS
1200mm WidePL - 10.00IL - 9.60IL - 9.25IL - 9.27
600mm WidePL - 10.00IL - 9.27IL - 9.37
300mm WideBPL - 10.30IL - 9.68IL - 9.90
SURFACE WATER DRAINAGE
SEWER DRAINAGE
M.H 1 IL - 9.70
M.H 2 IL - 9.60
M.H 3 IL - 9.44
M.H 4 IL - 9.39
GL - 10.00
ROAD AND PAVEMENT
WATER RETICULATION
THANK YOU