Measure Q.pdf

18
Tuesday, April 21, 2015 at 8:52:02 AM Pacific Daylight Time Page 1 of 17 Subject: RE: CASTELAR EEC MEASURE Q BOND SURVEY Date: Friday, February 27, 2015 at 4:53:01 PM Pacific Standard Time From: Elbeleidy, Raouf To: Oregel, Ana, Picinic, MaNhew CC: Tagawa, Dean, Nathan Berlin Priority: High And thank you Nathan. RAOUF ELBELEIDY SENIOR FACILITIES PROJECT MANAGER EARLY CHILDHOOD EDUCATION 333 S. BEAUDRY BLVD 11 TH FLOOR (213)2410157 From: Oregel, Ana Sent: Friday, February 27, 2015 4:26 PM To: Elbeleidy, Raouf; Picinic, MaNhew Cc: Tagawa, Dean; Nathan Berlin Subject: Re: CASTELAR EEC MEASURE Q BOND SURVEY Importance: High Hello All, Since there are no words to describe our gra]tude, I decided to send you pictures of all the HAPPY faces at Castelar… including my happy face :). You are all amazing, thank you for what you do!! Ana

Transcript of Measure Q.pdf

Page 1: Measure Q.pdf

Tuesday,  April  21,  2015  at  8:52:02  AM  Pacific  Daylight  Time

Page  1  of  17

Subject: RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEYDate: Friday,  February  27,  2015  at  4:53:01  PM  Pacific  Standard  Time

From: Elbeleidy,  RaoufTo: Oregel,  Ana,  Picinic,  MaNhewCC: Tagawa,  Dean,  Nathan  Berlin

Priority: High

And  thank  you  Nathan.  RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From:  Oregel,  Ana  Sent:  Friday,  February  27,  2015  4:26  PMTo:  Elbeleidy,  Raouf;  Picinic,  MaNhewCc:  Tagawa,  Dean;  Nathan  BerlinSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEYImportance:  High  Hello  All,    Since  there  are  no  words  to  describe  our  gra]tude,  I  decided  to  send  you  pictures  of  all  the  HAPPY  faces  at  Castelar…including  my  happy  face  :).  You  are  all  amazing,  thank  you  for  what  you  do!!  Ana        

                         

Page 2: Measure Q.pdf

Page  2  of  17

                         

Page 3: Measure Q.pdf

Page  3  of  17

 

                                 

Page 4: Measure Q.pdf

Page  4  of  17

   

                   

Page 5: Measure Q.pdf

Page  5  of  17

   

From:  <Elbeleidy>,  Raouf  <[email protected]>Date:  Wednesday,  February  11,  2015  at  4:49  PMTo:  "Picinic,  MaNhew"  <[email protected]>,  Ana  Oregel  <[email protected]>Cc:  "Tagawa,  Dean"  <[email protected]>,  Nathan  Berlin  <[email protected]>Subject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

Thanks  MaNhew.  This  is  very  exci]ng  news.  Thanks  again  for  all  your  help.  RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From:  Picinic,  MaNhew  Sent:  Wednesday,  February  11,  2015  3:25  PMTo:  Oregel,  Ana;  Elbeleidy,  RaoufCc:  Tagawa,  Dean;  Nathan  BerlinSubject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY    Ana,

Page 6: Measure Q.pdf

Page  6  of  17

The  playground  apparatus  was  delivered  at  our  site,  last  week.I’m  sekng  up  the  contractor  and  will  probably  start  installa]on  on  2/23/15.We  will  need  to  have  a  job  start  mee]ng  next  week  prior  to  installa]on  of  Playground  equipment.What  date  and  ]me  are  you  available?  Also,  we  need  to  have  a  job  start  mee]ng  for  GraNs  EEC  –  Shade  Structure  Project.We  may  be  able  to  start  wi]n  two  weeks.What  date  and  ]me  can  we  meet  at  GraNs  EEC?Take  care,MaNhew  From:  Oregel,  Ana  Sent:  Wednesday,  February  11,  2015  1:31  PMTo:  Elbeleidy,  Raouf;  Picinic,  MaNhewCc:  Tagawa,  DeanSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEYImportance:  High  Hi  MaNhew,    Hope  this  email  finds  you  well.    Do  you  have  a  date  for  the  delivery  of  the  apparatus?    Best,    Ana        

From:  <Elbeleidy>,  Raouf  <[email protected]>Date:  Wednesday,  February  4,  2015  at  4:08  PMTo:  Ana  Oregel  <[email protected]>,  "Picinic,  MaNhew"  <[email protected]>Cc:  "Tagawa,  Dean"  <[email protected]>Subject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

Great  news.  Thanks  MaNhew.  I  can’t  wait  to  see  the  new  apparatus!  RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From:  Oregel,  Ana  Sent:  Tuesday,  February  03,  2015  2:50  PMTo:  Picinic,  MaNhew;  Elbeleidy,  RaoufSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  GREAT  NEWS!!!  And  Yes  lets  begin!!!  :)  thank  you  so  much!    I  will  contact  the  elementary  principal  and  will  get  back  to  you  on  that,  although  I  don’t  think  it  will  be  aproblem.

Page 7: Measure Q.pdf

Page  7  of  17

 Best  Regards,    Ana    

From:  <Picinic>,  MaNhew  <[email protected]>Date:  Tuesday,  February  3,  2015  at  2:02  PMTo:  Ana  Oregel  <[email protected]>,  "Elbeleidy,  Raouf"  <[email protected]>Subject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

Ana,The  playground  equipment  for  Castelar  EEC  came  in.If  I  can  get  the  contractor  to  start  within  the  next  two  weeks  is  that  OK  with  you.Take  care,MaNhew  From:  Oregel,  Ana  Sent:  Thursday,  January  08,  2015  4:17  PMTo:  Picinic,  MaNhew;  Elbeleidy,  RaoufSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  Awesome!  Looking  forward  to  it  :)    Thank  you!!  Ana  

From:  <Picinic>,  MaNhew  <[email protected]>Date:  Thursday,  January  8,  2015  at  4:16  PMTo:  Ana  Oregel  <[email protected]>,  "Elbeleidy,  Raouf"  <[email protected]>Subject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

OK,I  should  be  gekng  a  proposal  next  week,  and  a  ]cket  for  funding  the  following  week.Hopefully  this  gets  funded  sooner  than  the  previous  project.Take  care,MaNhew  From:  Oregel,  Ana  Sent:  Thursday,  January  08,  2015  4:11  PMTo:  Elbeleidy,  Raouf;  Picinic,  MaNhewSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEYImportance:  High  Agreed,  lets  proceed  with  rubber  makng.  Thank  you,  Ana  

Page 8: Measure Q.pdf

Page  8  of  17

From:  <Elbeleidy>,  Raouf  <[email protected]>Date:  Thursday,  January  8,  2015  at  4:08  PMTo:  "Picinic,  MaNhew"  <[email protected]>,  Ana  Oregel  <[email protected]>Subject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

I  believe  Ms.  Oregel  wanted  rubber  makng  so  that  is  what  we  should  proceed  with  unless  shehas  changed  her  mind.  Thanks.  RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From:  Picinic,  MaNhew  Sent:  Thursday,  January  08,  2015  4:05  PMTo:  Elbeleidy,  Raouf;  Oregel,  AnaSubject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  Raouf/Ana,Installing  synthe]c  turf  will  take  allot  longer  because  we  don’t  have  a  task  order  contractor  forsynthe]c  turf;  however  we  already  have  a  task  order  contractor  for  the  rubber  makng.Take  care,Mathew  From:  Elbeleidy,  Raouf  Sent:  Thursday,  January  08,  2015  2:11  PMTo:  Oregel,  Ana;  Picinic,  MaNhewCc:  Rubin,  Alan;  Obeso,  SandraSubject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEYImportance:  High  Hi  Ana:  Yes  we  should  be  able  to  also  fund  removal  of  the  exis]ng  (strange  apparatus)  and  installingnew  rubber  makng  or  synthe]c  turf  or  half  and  half  depending  on  your  preference.  Thanks.  RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From:  Oregel,  Ana  Sent:  Thursday,  January  08,  2015  11:07  AMTo:  Picinic,  MaNhewCc:  Elbeleidy,  RaoufSubject:  Re:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  Hello,  

Page 9: Measure Q.pdf

Page  9  of  17

 I  want  to  make  sure    we  are  all  on  the  same  page  regarding  the  outdoor  playground  at  Castelar.      In  regards  to  the  picture  below,  we  agreed  that  the  play  structure  was  going  to  be  removed  and  newmakng  was  going  to  be  placed.      

 The  picture  below  shows  where  the  NEW  apparatus  will  be  placed,  along  with  new  makng.      It  will  beplaced  underneath  the  shade  structure.  

Page 10: Measure Q.pdf

Page  10  of  17

 Also,  I  am  not  sure  how  things  work,  but  I  am  assuming  that  before  the  apparatus  gets  installed  thebins  that  are  currently  in  place  will  need  to  be  moved,  correct?    Per  our  conversa]ons  we  are  replacing6  pink  bins  with  new  ones.  

Page 11: Measure Q.pdf

Page  11  of  17

 Thank  you,    Ana  

From:  <Picinic>,  MaNhew  <[email protected]>Date:  Thursday,  January  8,  2015  at  6:54  AMTo:  Ana  Oregel  <[email protected]>Cc:  "Elbeleidy,  Raouf"  <[email protected]>Subject:  FW:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

Ana,I  will  be  ordering  the  Playground  Equipment,  see  aNachment.Are  these  the  colors  that  you  chose.Take  care,MaNhew  From:  Frank  Catapano  [mailto:[email protected]]  

Page 12: Measure Q.pdf

Page  12  of  17

From:  Frank  Catapano  [mailto:[email protected]]  Sent:  Thursday,  May  29,  2014  5:04  PMTo:  Picinic,  MaNhewSubject:  RE:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  MaNhew:Please  see  aNached.  The  structure  we  designed  was  to  go  under  theShade  Structure.We  will  need  to  measure  for  a  different  area.I’m  out  of  town  next  week  un]l  Friday.  Thank  you,  

         FRANK  CATAPANO            Senior  Sales  Consultant

                                     31316  Via  Colinas  #118        Westlake  Village,  CA  91362Ph.  (818)  735-­‐3838  Fax.  (818)  735-­‐9612Cell:  (310)  701-­‐7151  Email:  [email protected]

 From: Picinic, Matthew [mailto:[email protected]] Sent: Thursday, May 29, 2014 3:52 PMTo: Frank CatapanoSubject: FW: CASTELAR EEC MEASURE Q BOND SURVEYImportance: High  Frank,Remember  Castelar  EEC.Can  we  install  a  new  apparatus?MaNhew  From: Elbeleidy, Raouf Sent: Thursday, May 29, 2014 2:14 PMTo: Picinic, MatthewCc: Mortel, Margarita; Jackson, Joseph; Oregel, Ana; Tagawa, Dean; Servin, ManuelSubject: RE: CASTELAR EEC MEASURE Q BOND SURVEY

Page 13: Measure Q.pdf

Page  13  of  17

Importance: High  Hi  MaNhew:  In  addi]on  to  replacing  the  rubber  makng  they  need  a  new  small  apparatus.  The  only  placeto  put  it  is  exactly  where  the  exis]ng  apparatus  is  now  shown  in  the  photo  below  andaNached.If  we  can  find  a  new  small  apparatus  that  can  fit  in  that  same  area  we  should  go  ahead  andselect  one  with  the  principal’s  input  and  get  an  es]mate  for  new  apparatus  and  makng.  If  the  area  is  too  small  for  a  new  (small)  apparatus  then  we  can  just  replace  the  rubbermakng.  Please  let  me  know  what  you  think.  Thanks.  

MEASURE Y(Phase II) 6

REPLACE DETERIORATEDRUBBER MATTING ATPLAYGROUNDAPPARATUS

CASTELAR EEC Y-II NO

 RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  From: Picinic, Matthew Sent: Thursday, May 29, 2014 10:54 AMTo: Elbeleidy, RaoufCc: Mortel, MargaritaSubject: FW: CASTELAR EEC MEASURE Q BOND SURVEYImportance: High  Raouf,Were  we  going  to  do  this  makng  at  Castelar  EEC  at  a  later  date?  

Page 14: Measure Q.pdf

Page  14  of  17

 Take  care,MaNhew                From: Oregel, Ana Sent: Tuesday, December 10, 2013 3:16 PMTo: Elbeleidy, RaoufCc: Servin, Manuel; Jackson, Joseph; Tagawa, Dean; Diekmann, Maureen; Picinic, MatthewSubject: Re: CASTELAR EEC MEASURE Q BOND SURVEYImportance: High  Mr.  Raouf,    Thank  you  for  your  ]me,  I  truly  appreciate  your  visit  and  ideas  on  how  to  improve  our  school.    Thereare  a  few  items  on  the  list  that  need  to  be  corrected  and/or  addressed:  

1.   Adult  Restroom:  on  your  notes,  you  indicated    "Convert one small restroom w only atoilet into a full toilet w/ sink”, However, wediscussed opening the space adjacent to anadult restroom by removing two small walls, this will provide a larger staff lounge. We do notneed to convert any of the restrooms.

2.   Wireless Technology: On your notes, you indicate “Already in Place,” However, we do NOThave any wireless technology in place.

3.   Restroom: Provide low partitions between toilets in children's restrooms. On this item, thereare also some restrooms that need to be replaced for child-sized toilets and some sinks thatalso need to be replaced.

4.   Interior paint: I  no]ced  that  you crossed out this item, however, we are stillin desperate need of a paint job. Since this item is funded through measure Y, who can  Icontact  to  expedite  this  item?  

Thank you,  Ana  OregelPrincipal  Castelar  Early  Educa]on  Center840  Yale  St.  Los  Angeles  CA  90012Phone:  (213)  624-­‐6740Fax:  (213)  617-­‐1439  GraNs  Early  Educa]on  Center1414  5th  St.  Los  Angeles  CA  90017Phone:  (213)  481-­‐3230Fax:  (213)  481-­‐3239  

Page 15: Measure Q.pdf

Page  15  of  17

From:  <Elbeleidy>,  Raouf  <[email protected]>Date:  Tuesday,  December  10,  2013  at  2:24  PMTo:  Ana  Oregel  <[email protected]>Cc:  "Servin,  Manuel"  <[email protected]>,  "Jackson,  Joseph"<[email protected]>,  "Tagawa,  Dean"  <[email protected]>,  "Diekmann,Maureen"  <[email protected]>,  "Picinic,  MaNhew"<[email protected]>Subject:  CASTELAR  EEC  MEASURE  Q  BOND  SURVEY  

Dear  Ms.  Oregel:  Thank  you  for  mee]ng  with  the  ECED  Facili]es  Team  on  December  6,  2013  to  discuss  thefuture  Measure  Q  projects  at  your  center.Below  is  a  list  of  all  the  items  we  discussed.  Where  indicated  on  the  list  please  place  atrouble  call  followed  up  by  a  call  to  your  CPM.  For  projects  listed  as  A  and  I,  please  ask  your  CPM  to  send  me  an  es]mate  for  the  cost  ofthe  required  work  and  ECED  will  fund  it.  The  remainder  of  the  new  projects  will  be  sent  to  the  Board  of  Educa]on  for  approvalsome]me  in  March  2014.  If  anything  we  discussed  during  our  mee]ng  was  inadvertently  lev  off  the  list  or  if  youremembered  something  important  that  we  did  not  discuss,please  do  not  hesitate  to  let  me  know.    Thank  you  again  for  taking  the  ]me  to  meet  with  your  Facili]es  Team.    

A

Principal: Ana Oregel Director: DeanTagawa CPM: Manuel Servin

CASTELAR EEC

FE246Q315A Playground Equipment- Remove /Replace CASTELAR EEC

FE295Q415A Self-Closers @ Gates CASTELAR EEC

Page 16: Measure Q.pdf

Page  16  of  17

ECRA25315A Astroturf- Replace Astroturf Play Area CASTELAR EEC

ECRA25515A Drinking Fountain- Replace Ext. CASTELAR EEC

ECRA25415A Electrical Outlets- Add Exterior CASTELAR EEC

ECRA25715A Flooring- Replace All Carpeting CASTELAR EEC2

ECRA25615A Roofing- Re-Roof Lunch Shelter CASTELAR EEC1

ECRA25215A Shade - New Shade Shelter CASTELAR EEC

2

MEASURE Y

MODERNIZATION: 3 Reseal & RestripePlayground; 6 Sandbox W/Cover; 4Countertops; 2 Interior Paint; 1 NewCarpet/Flooring; 5 Electrical Outlets; 7New Kitchen Flooring

CASTELAR EEC

MEASURE Y(Phase II)

REPLACE DETERIORATED RUBBERMATTING AT PLAYGROUNDAPPARATUS

CASTELAR EEC

MEASURE Y(Phase II)

REPLACE OBSOLETE ENTRYCONTROL SYSTEM AND PROVIDE 3HANDSETS CONTROLS

CASTELAR EEC

A and I

Storage Bins; Remove 6 old storage binsand replace with 2 small new ones CASTELAR EEC

New 12/6/13

Access: center needs ADA access foremergency responders CASTELAR EEC

New 12/6/13 Adult restrooms: Provide at least oneadditional adult restroom

CASTELAR EEC

New 12/6/13 Banners- Provide school name bannersCASTELAR EEC

Page 17: Measure Q.pdf

Page  17  of  17

New 12/6/13

Cabinets- Replace all base cabinets,sinks and associated upper cabinets inclassrooms

CASTELAR EEC

New 12/6/13 Cabinets- Replace all built in children's'cubbies.

CASTELAR EEC New 12/6/13 Electrical hand dryers CASTELAR EEC

New 12/6/13 Fencing: Provide tarp

CASTELAR EEC

New 12/6/13 Fire Alarm Upgrade CASTELAR EEC

New 12/6/13 Front Office Remodel CASTELAR EEC

New 12/6/13 HVAC: Verify unit (s) age and replace ifrequired.

CASTELAR EEC

New 12/6/13 Lighting (Security) : Provide additionaloutdoor lighting

CASTELAR EEC

New 12/6/13 Lighting: Replace all obsolete lighting inHallways, Kitchen, and restrooms

CASTELAR EEC

New 12/6/13 Marker boards and tack boards: add inclassrooms

CASTELAR EEC

New 12/6/13 Nature Explore Classroom

CASTELAR EEC

New 12/6/13 Paving: Patch / seal, stripe asphalt paving

CASTELAR EEC

New 12/6/13

Playground apparatus: Replace existingapparatus and matting with new CASTELAR EEC

New 12/6/13 Restrooms: Provide low partitionsbetween toilets in children's restrooms

CASTELAR EEC

New 12/6/13 Signs: Letter signage CASTELAR EEC

New 12/6/13 Wireless technology CASTELAR EEC

Trouble call

Telephones: Telephones do not roll overfrom front office to opening/closingclassroom

CASTELAR EEC

 RAOUF  ELBELEIDYSENIOR  FACILITIES  PROJECT  MANAGEREARLY  CHILDHOOD  EDUCATION333  S.  BEAUDRY  BLVD-­‐  11  TH  FLOOR(213)241-­‐0157  

Page 18: Measure Q.pdf

Page  18  of  17