Meadow Glen Middle School - Stainless & Glass Railings

1
This document contains SC Railing Company proprietary information. Disclosure is prohibited without the prior written permission of SC Railing Company. 7008 Northland Drive, Suite 150 Minneapolis, Minnesota 55428 p: 1-877-215-RAIL(7245) w: sc-railing.com Staircases called for optional side-mounted posts Top-mounted Vista railing Balconies and overlooks called for top- mounted posts Long runs of Vista railing create separation with a dramatic, yet minimal aesthetic Our Vista railing is perfect when an unobstructed view is preferred Free-standing handrails accompany the Vista railing on interior stairs Project: Meadow Glen Middle School Location: Lexington, SC Architect: Hussey, Gay, Bell, & DeYoung International GC: Adolfson & Peterson Construction Completion: December 2012 Scope: This project called for 850 linear feet of Vista stainless and glass railing and 2-line free-standing stainless handrail. Revered for its simple, yet sturdy design, our Vista railing does not incorporate a top cap, giving an air of openness, allowing the eye to see well beyond the railing. Its strength lends itself to high-traffic spaces. Project Information Public Middle School Case Study: Meadow Glen Middle School

Transcript of Meadow Glen Middle School - Stainless & Glass Railings

This document contains SC Railing Company proprietary information. Disclosure is prohibited without the prior written permission of SC Railing Company.

7008 Northland Drive, Suite 150 Minneapolis, Minnesota 55428 p: 1-877-215-RAIL(7245) w: sc-railing.com

Staircases called for optional side-mounted posts

Top-mounted Vista railing

Balconies and overlooks called for top-mounted posts

Long runs of Vista railing create separation with a dramatic, yet minimal aesthetic

Our Vista railing is perfect when an unobstructed view is preferred

Free-standing handrails accompany the Vista railing on interior stairs

Project: Meadow Glen Middle School

Location: Lexington, SC

Architect: Hussey, Gay, Bell, & DeYoung International

GC: Adolfson & Peterson Construction

Completion: December 2012

Scope: This project called for 850 linear feet of Vista stainless and glass

railing and 2-line free-standing stainless handrail. Revered for its

simple, yet sturdy design, our Vista railing does not incorporate

a top cap, giving an air of openness, allowing the eye to see well

beyond the railing. Its strength lends itself to high-traffic spaces.

Project Information

Public Middle School

Case Study: Meadow Glen Middle School