MCAP POD RENOVATION - LEVEL 01...mcap pod renovation - level 01 existing photos of mcap pod - level...

3
CONNECTION TO NEW BUILDING DAYROOM SALLY CORRIDOR SHWR VET EXAM TLT BD 1 BD 2 BD 3 BD 4 BD 5 BD 7 BD 8 BD 9 BD 10 BD 11 BD 6 CALM RM KIT TV DAYROOM GENERAL: - NEW PAINT, FLOORING, FABRIC- WRAPPED ACOUSTICAL CEILING PANELS - SHOWER AREA BECOMES OFFICE / ASSESSMENT / MEETING ROOM - ISOLATION ROOM BECOMES TWO SINGLE- STALL SHOWER ROOMS - NEW LOCKABLE KITCHENETTE (MICROWAVE, FRIDGE, SINK) DAYROOM: - EXPANDED DAYROOM (WINDOWS TO COURTYARD MAINTAINED) - WRITEABLE WALL SURFACES FOR YOUTH BEDROOMS: - NEW MATTRESSES FOR BEDS - NEW OR REFINISHED DOORS, ACOUSTICAL CEILING MATERIAL LIST OF MCAP RENOVATIONS: GARDEN OTDR REC EQUIP BASKETBALL COURT 64' X 36' SHWR OFFICE CAP PROJECT NO: 180802 | 11/28/18 SRCCCY CONCEPTS Scale: 0' 15' 30' 45' 7.5' 1" = 30'-0" 1 MCAP POD RENOVATION - LEVEL 01 EXISTING PHOTOS OF MCAP POD - LEVEL 01

Transcript of MCAP POD RENOVATION - LEVEL 01...mcap pod renovation - level 01 existing photos of mcap pod - level...

  • CONNECTION TO NEW BUILDING

    DAYR

    OOM

    SALLY

    CORRIDOR

    SHWR

    VET EXAM

    TLT

    BD 1BD 2BD 3BD 4BD 5BD

    7BD

    8BD

    9BD

    10BD

    11

    BD 6

    CALM RM

    KIT

    TV

    DAYR

    OOM

    GENERAL:- NEW PAINT, FLOORING, FABRIC- WRAPPED ACOUSTICAL CEILING PANELS

    - SHOWER AREA BECOMES OFFICE / ASSESSMENT / MEETING ROOM

    - ISOLATION ROOM BECOMES TWO SINGLE-STALL SHOWER ROOMS

    - NEW LOCKABLE KITCHENETTE (MICROWAVE, FRIDGE, SINK)

    DAYROOM:- EXPANDED DAYROOM(WINDOWS TO COURTYARD MAINTAINED)

    - WRITEABLE WALL SURFACES FOR YOUTH

    BEDROOMS:- NEW MATTRESSES FOR BEDS

    - NEW OR REFINISHED DOORS, ACOUSTICAL CEILING MATERIAL

    LIST OF MCAP RENOVATIONS:

    GARDEN

    OTDR REC EQUIP

    BASKETBALL COURT64' X 36'

    SHWR

    OFFICE

    CAP PROJECT NO: 180802 | 11/28/18SRCCCY CONCEPTS

    Scale:

    0' 15' 30' 45'7.5'

    1" = 30'-0"1MCAP POD RENOVATION - LEVEL 01

    EXISTING PHOTOS OF MCAP POD - LEVEL 01

    corey.lapworthText BoxAppendix H

  • SALLY

    TLT

    BD 2BD 3BD 4BD 5BD 6BD

    7BD

    8BD

    9BD

    10BD

    11

    DAYR

    OOM

    CALM RM

    KIT

    TV

    DAYR

    OOM RENOVATED OUTDOOR

    RECREATION SPACE BELOW

    BD 1

    GENERAL:- NEW PAINT, FLOORING, FABRIC- WRAPPED ACOUSTICAL CEILING PANELS

    - SHOWER AREA BECOMES OFFICE / ASSESSMENT / MEETING ROOM

    - ISOLATION ROOM BECOMES TWO SINGLE-STALL SHOWER ROOMS

    - NEW LOCKABLE KITCHENETTE (MICROWAVE, FRIDGE, SINK)

    DAYROOM:- EXPANDED DAYROOM(WINDOWS TO COURTYARD MAINTAINED)

    - WRITEABLE WALL SURFACES FOR YOUTH

    BEDROOMS:- NEW MATTRESSES FOR BEDS

    - NEW OR REFINISHED DOORS, ACOUSTICAL CEILING MATERIAL

    LIST OF MCAP RENOVATIONS:

    SHWRSHWR

    OFFICE

    CAP PROJECT NO: 180802 | 11/28/18SRCCCY CONCEPTS

    Scale:

    0' 15' 30' 45'7.5'

    1" = 30'-0"1MCAP POD RENOVATION - LEVEL 02

    EXISTING PHOTOS OF MCAP POD - LEVEL 02

    corey.lapworthText BoxAppendix H

  • SEE OTHER DRAWINGS FOR

    RENOVATED MCAP HOUSING POD

    RENOVATED OUTDOOR RECREATION SPACE

    BELOW

    CORRIDOR

    CORR

    IDOR

    SALLY

    CLASSROOM750 SF

    STOR

    CLASSROOM1120 SF

    ROOM DIVIDER

    - NEW POWER & LIGHTS FOR CLASSROOMS

    - EXTEND FIRE SPRINKLER SYSTEM TO CLASSROOMS FROM EXISTING BUILDING

    - NEW HVAC SYSTEM (SEPARATE FROM THE EXISTING BUILDING)

    - NEW AUDIO VISUAL SYSTEMS FOR CLASSROOMS (TO MATCH SRCCCY)

    LIST OF FEATURES FOR CLASSROOM ADDITION:(2500 SF BUILDING ADDITION)

    CAP PROJECT NO: 180802 | 11/28/18SRCCCY CONCEPTS

    Scale:

    0' 15' 30' 45'7.5'

    1" = 30'-0"1ADDITIONAL CLASSROOMS IF SRCCCY NOT AT VEL PHILIPS

    corey.lapworthText BoxAppendix H

    SheetsFP9 - MCAP POD RENOVATION - LEVEL 01FP10 - MCAP POD RENOVATION - LEVEL 02

    Additional Classrooms - revised 2.pdfSheetsFP12 - ADDITIONAL CLASSROOMS