1 Maynard Jackson High School Weekly Photo Report This Week’s Activities May 6 – May 10 Site Wall C complete Stair 2 pan slabs pouring complete South elevation brick complete Built up roofing at pop up structure complete South courtyard curtainwall glazing complete Core drilling for underground feeds to new riser room complete Main gym demolition currently underway Main gym shoring currently being erected and roof soil being removed Curb and gutter and parking lot grading currently underway at North parking lot Roofing at mezzanine, high roof and pop up roof ongoing Preparation for painting existing structure ongoing Preparation for glazing at North courtyard curtainwall ongoing Flashing and backfilling at green roof parapet ongoing Horizontal WSHP installation ongoing Main level inwall electrical roughin ongoing Saw cutting for new electrical feeds ongoing Drywall hang and finish on Upper Level ongoing MEP wall inspections on Main Level underway Date: May 10, 2013 Client: Atlanta Public Schools Project Name: Maynard Jackson High School Renovation Project #: #12-034 Prepared By: Logan Crutchfield Distribution: Steven Brown Josh Flannigan Matt Loveless Carrie Campbell Meghan Frydrych Bobby Mote Natalia Cardelino Jimmy Haralson Jeff Schafer Barbara Crum Alvah Hardy Brint Smith Logan Crutchfield Bill Hill Jere Smith Rebecca Dean John Hutton Barry Spurlock Jamie Dye Lin Kelley Brian Thomas Comments: May 6th to May 10th, 2013 Photo Report

Transcript of Maynard Jackson High School - Atlanta Public · PDF fileMaynard Jackson High School ......

Page 1: Maynard Jackson High School - Atlanta Public  · PDF fileMaynard Jackson High School ... Natalia Cardelino Jimmy Haralson Jeff Schafer ... • Continue roofing at mezzanine,

� 1 �

Maynard Jackson High School Weekly Photo Report

This Week’s Activities

May 6 – May 10

• Site Wall C complete

• Stair 2 pan slabs pouring complete

• South elevation brick complete

• Built up roofing at pop up structure complete

• South courtyard curtainwall glazing complete

• Core drilling for underground feeds to new riser room complete

• Main gym demolition currently underway

• Main gym shoring currently being erected and roof soil being removed

• Curb and gutter and parking lot grading currently underway at North parking lot

• Roofing at mezzanine, high roof and pop up roof ongoing

• Preparation for painting existing structure ongoing

• Preparation for glazing at North courtyard curtainwall ongoing

• Flashing and backfilling at green roof parapet ongoing

• Horizontal WSHP installation ongoing

• Main level in�wall electrical rough�in ongoing

• Saw cutting for new electrical feeds ongoing

• Drywall hang and finish on Upper Level ongoing

• MEP wall inspections on Main Level underway

Date: May 10, 2013

Client: Atlanta Public Schools

Project Name: Maynard Jackson High School Renovation

Project #: #12-034

Prepared By: Logan Crutchfield

Distribution: Steven Brown Josh Flannigan Matt Loveless

Carrie Campbell Meghan Frydrych Bobby Mote

Natalia Cardelino Jimmy Haralson Jeff Schafer

Barbara Crum Alvah Hardy Brint Smith

Logan Crutchfield Bill Hill Jere Smith

Rebecca Dean John Hutton Barry Spurlock

Jamie Dye Lin Kelley Brian Thomas

Comments: May 6th to May 10th, 2013 Photo Report

Page 2: Maynard Jackson High School - Atlanta Public  · PDF fileMaynard Jackson High School ... Natalia Cardelino Jimmy Haralson Jeff Schafer ... • Continue roofing at mezzanine,

� 2 �

Maynard Jackson High School Weekly Photo Report

Tower 2 Steel Erection East Elevation

South Expansion South Courtyard Glazing

Page 3: Maynard Jackson High School - Atlanta Public  · PDF fileMaynard Jackson High School ... Natalia Cardelino Jimmy Haralson Jeff Schafer ... • Continue roofing at mezzanine,

� 3 �

Maynard Jackson High School Weekly Photo Report

Site Wall C North Parking Lot Curb and Gutter

Stair 2 Gym Exterior Wall Demolition

Page 4: Maynard Jackson High School - Atlanta Public  · PDF fileMaynard Jackson High School ... Natalia Cardelino Jimmy Haralson Jeff Schafer ... • Continue roofing at mezzanine,

� 4 �

Maynard Jackson High School Weekly Photo Report

Gym Shoring Cooling Tower

North Courtyard Glazing Corridor Adjacent to Cafeteria

Page 5: Maynard Jackson High School - Atlanta Public  · PDF fileMaynard Jackson High School ... Natalia Cardelino Jimmy Haralson Jeff Schafer ... • Continue roofing at mezzanine,

� 5 �

Maynard Jackson High School Weekly Photo Report

Next Week’s Activities

May 6 – May 10

• Stair 2 blocking to begin

• Stair 6 brick work to begin

• Glazing at North courtyard to begin

• Continue main gym demolition

• Continue shoring erection and roof soil removal

• Continue roofing at mezzanine, high roof and pop up roof

• Continue existing structure paint preparation

• Tower 2 Steel to be completed

• Waterproofing of the 3 remaining V�Notch infills to be completed

• Field measuring for Tower 2 curtainwall to be completed

• Elastomeric coating on West Mezzanine CMU to be completed

• Waterproofing and Backfilling of retaining wall C to be completed