May 22, 2019
![Page 2: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/2.jpg)
We are focused on Improving Owner Experience
Increasing Property Value
Reducing Operational Costsand Improving Revenue
![Page 3: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/3.jpg)
Introduction
• The building is 44 years old• Time and the Elements have
taken their toll• Under funded Reserve Account• We experienced back to back
Hurricanes; the worse in over 100 years
![Page 4: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/4.jpg)
Hurricane María
![Page 5: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/5.jpg)
Hurricane María
![Page 6: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/6.jpg)
Hurricane María
![Page 7: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/7.jpg)
Insurance Projects to Complete
• Common Area HVAC• Roof Ventilation and Membrane• Parking Structure• Hallways and Landings• Exterior Structure & Painting• Employee Facilities• Men’s Changing Rooms• Telephone System Switchboard
and Units
![Page 8: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/8.jpg)
• Installed over 95 state-of-the-art HD cameras throughout the building. 10-year warranty on equipment.
• Added Command Center allows eyes all over the Building secure entry for employees and vendors.
• There are issues/concerns like the Front Gate and, access points, parking garage and “blind zones”. This is an area of focus for management
• New Security Check Point• When Jade opens, they will contribute to the road
use and help pay for security. This will be discussed in detail later.
Challenges - SecuritySecurity is important to us,What are you doing to improve it?
Command Center
![Page 9: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/9.jpg)
Challenges - Insurance
• Insurance Company has not paid out enough to repair the damage including full owners
• Insurance Company is not acting in good faith• We are pursuing the best path for better
payout• Time is limited by statue of limitations, must
act quickly• Law firm engaged and carrier advised council
vote required prior to dispersing final funds
I have submitted my claim and it has not been resolved, Why?
![Page 10: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/10.jpg)
Insurance Timeline
Sept. 2017Hurricane Hits
Sept. 2019Statue of
Limitation
March2019
March2018
Sept.2018
Working Claim with Insurance Company
Submitted Claim on October 11, 2017 – Extended Claim to $9.8m on Nov. 14th, 2017Interim payment of $4.8m on December 21, 2017
June2018
Dec2018
Dec.2017
June2019
Final Claim – Submitted (Feb. 28th, 2019)Based on an assessment of the claim made
by a third party adjuster, and the legal analysis made a law firm, we expect to
receive under the supplemental claim that we filed with the insurance company
approximately $13.5M.
Claim
The Claim Submitted was within 30 days of the storm with no power and limited communication. Received interim payment within 60 days of storm. Once we started work, we found significantly more damage to the building and infrastructure and filled a supplemental claim. Ourinsurer dragged their feet, and with the statue of limitation fast approaching, we had to engage law firm to file suit.
![Page 11: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/11.jpg)
$ 4,745,823.54Keith St. Clair
$ 1,576,786.47Assessment
$ 4,800,000.00Insurance
$ 11,122,610.01TOTAL
CAPEXThis slide represents the amount of funds that have been injected in to the building since Keith St. Clair assumed management . The $4.7m is from Keith St. Clair, ESJ Inc and affiliates at no cost to the membership. The Assessment of $1.5m represents what has been received from the Timeshare assessment billings. The Insurance amount represents the first payment from the Insurance Company for the initial claim.
![Page 12: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/12.jpg)
Funds ReceivedINSURANCE FUNDS USES TO DATE
• Roof • Windows• Pool • Building exterior • Walkways • Generators and parts • Elevator Mechanical • Fuel• Landings • Food during storms• Hallways • Transportation• Roof (remediate) • Engineer Roof• Engineer Building • Lanais rooms & hallways• Engineer • Lanais roof
![Page 13: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/13.jpg)
Assessment Update
Total Project $5,000,000ESJ, Inc. $2,000,000Owners Collected $1,576,786Owners Un-collected -$1,423,214Curent Bad Debt -$1,423,214
TIMESHARE ASSESSMENT SOURCES
Total Project $5,000,000FF&E $2,000,000Floors 17-11 $1,576,786Floors 11-1* $1,423,214*Represents bad debt
TIMESHARE ASSESSMENT USES
Original project was $5m, $3m to the members and $2m to the INC. The INC. Has funded their $2m with furniture, fixtures and electronics which are currently stored in Isla Verde. The $3m billed to the members, there is currently an amount of $1.4m that is uncollected. Construction has stopped on the lower floors until this amount is collected from the delinquent members or we receive the supplemental insurance proceeds.
![Page 14: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/14.jpg)
Future Insurance Uses
PROJECTED INSURANCE CLAIM $13,500,000 $13,500,000
Priority of Distribution
New Deductible $1,200,000 $12,300,000
Full Owners Provision $600,000 $11,700,000
Roof $1,200,000 $10,500,000
Corridors $500,000 $10,000,000
Building Exterior $4,900,000 $5,100,000- Balconies, Paint, Concrete-rebar,
Windows, AC’s, Sealant, common areas
Fund Reserves (Deductible + ½ Ins.) $2,000,000 $3,100,000
Legal Reimburse $1,200,000 $1,900,000
Parking Garage $400,000 $1,400,000
INC and VO's $1,400,000 $0
RemainingBalance
*
![Page 15: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/15.jpg)
Future Goals - Admin
• Better maintained facilities• Fair maintenance fees• Transparency with BOD
• Semi-Annual Meetings to over performance and approve management of ESJ
• Clarity on Rules and Regulations
![Page 16: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/16.jpg)
• Beach Level Restaurant & Bar• Beach Level Restrooms• Beach Level Pool• In exchange for use of the land, the INC.
will pay the HOA increased rent.
REVENUE OPPORTUNITY #1:BEACH LEVEL RESTAURANT & BAR A Successful Business benefits all of us. For example: We are lacking F&B facilities to serve the Beach Front. The INC., if agreed by the council members, would invest over $1m in a new Beach Bar Restaurant located at the North side of the building. Currently there is rubble on that area that will be used for flooring if approved.
New Projects Increased Revenue to Members
![Page 17: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/17.jpg)
New Projects Increased Revenue to Members
• Through the energy savings that this will provide the increased insurance premium could be offset within 4 years.
• We will be off-grid with full power. No Hurricane impact and significant increase in property value.
REVENUE OPPORTUNITY #2:ENERGY CO-GENERATION FOR ESJ,How to Fix our $560,000 problem?
The INC. is willing to invest $6.4m to provide full off-grid power to ESJ. The INC and KSC are prepared to pay that and provide the energy at a discount to our members.
The only increase members have seen in 4 years is the $560,000 increase in Insurance. It is our goal to eliminate this increase in 4 years by providing an energy solution that saves us that or more.
![Page 18: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/18.jpg)
New Projects
• With the extra spots we will free spaces in the ESJ Tower for the benefit of Owners and Visitors.
• ESJ HOA will contract with Jade for a use fee for the road. Than revenue will be used to offset HOA costs at ESJ.
REVENUE OPPORTUNITY #3:JADE AND THE ACCESS ROADWhen Jade opens, their on-site parking will be more than is needed, since there are no residents and only hotel and timeshare guests.
![Page 19: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/19.jpg)
Budget 2020
![Page 20: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/20.jpg)
Comparative Budget by Year
• No increases in the past 5 years• Our strategy is to manage the budget with no increases and possible
decreases for the next 4 years through the revenue opportunities discussed in this presentation.
![Page 21: May 22, 2019esjcondo.com/wp-content/uploads/2019/06/ESJ-Towers... · Insurance Timeline Sept. 2017 Hurricane Hits Sept. 2019 Statue of Limitation March 2019 March 2018 Sept. 2018](https://reader036.fdocuments.net/reader036/viewer/2022071006/5fc3dc93933e2445880c971a/html5/thumbnails/21.jpg)
Thank You!