Matt Crunden Training and BIM Manager Legrand Electric Limited
Global specialist
in electrical and
digital building
infrastructures
The Legrand Group… global leader in its field
COMPANY OVERVIEW
Legrand has a complete offer, tailored to the commercial, industrial and residential markets.
With a presence in more than 70 countries and a workforce of 35,000 people, Legrand made
sales of 4.5 billion euros in 2013.
INNOVATION
The driving force behind Legrand’s development. With an increasing investment in research
and development (circa 5% of sales) and more than 4,000 active patents, the Legrand Group is
focused on maintaining a high rate of new product launches that present innovative solutions
to the market.
PRODUCT RANGES
Control and monitoring of installations, cable management, power distribution, distribution of
“voice-data-image” systems … Legrand provides numerous solutions for managing lighting,
heating, energy, networks and access in buildings.
Powered by specialists
In the UK Legrand has developed a customer focused structure which harnesses the power of its market leading specialist brands to deliver innovative, integrated solutions for all phases of the construction and healthcare environment.
POWER DISTRIBUTION From transformers, through rising main busbars and distribution boards to power track, desk modules and lighting control... CABLE MANAGEMENT Legrand’s established Swifts, Salamandre and Cablofil ranges give our cable management business division a firm leadership position in the UK. WIRING DEVICES Much more than just a vast selection of switches and sockets... this business division also includes door entry systems, home systems, lighting control and consumer units. ASSISTED LIVING & HEALTHCARE A portfolio of products designed to support individuals at home or residents / patients in a managed or healthcare establishment.
Swifts
Salamandre
BIM…definition ?
BIM…definition ?
‘BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them’
Source: www.bimtaskgroup.org
Source – freedigitalphotos.net Photo by Serge Bertasius Photography
Source – freedigitalphotos.net Photo by phasinphoto
Source – freedigitalphotos.net Photo by Artur84
Source – freedigitalphotos.net Photo by David Castillo Dominici
Source – freedigitalphotos.net Photo by renjith krishnan
Source – freedigitalphotos.net Photo by njaj
Source – freedigitalphotos.net Photo by Winnond
BIM…what it is (I think !)
• BIM is a (mindset) shift in current working practices • BIM is essentially ‘value creating’ collaboration through ....the entire project lifecycle • The process of creating a computer model of a building ….project that can be used to design, analyse, build, ….manage, refurbish and even demolish that building ….including EVERYTHING in it & attributed to it
• BIM = Building Information Modelling
or better still…
• BIM = Better Information Management
BIM…what it isn’t
• BIM is a (mindset) shift in current working practices • BIM is essentially ‘value creating’ collaboration through ....the entire project lifecycle • The process of creating a computer model of a building ….project that can be used to design, analyse, build, ….manage, refurbish and even demolish that building
• BIM = Building Information Modelling
or better still
• BIM = Better Information Management
It’s not just 3D
It’s not just a new technology application
It’s not ‘next generation’,
it’s here NOW
It’s not just CAD
It’s not just..!
BIM…why ?
• Growing population • Erratic economical environment • Sustainable development
• More complex projects • Higher expectations • Adapt to digitisation
Future proofing... the FUTURE !
BIM…the UK BIM strategy
www.bimtaskgroup.org
Source - Government Construction Strategy Source - Construction 2025
European Parliament
All 28 member states now have the green light to encourage, specify or mandate similar measures (to those of the UK) for publicly-funded construction and building projects by 2016
The European Parliament voted to support a package of reforms to the EU Public Procurement rules to recommend the use of electronic tools, including BIM, on public works contracts.
The new directive can be found within the Official Journal of the Europen Union (OJEU) Volume 57, dated 28th March 2014.
Article 22 (Rules applicable to communication) section 4: For public works contracts and design contests, Member States may require the use of specific electronic tools, such as of building information electronic modelling tools or similar
Source - OJEU: Volume 57 (28th March 2014)
BIM…level 2 BIM by 2016
Minimum requirement by
2016
The market is here
We can influence
Standards
Paper based information
sharing
Mainly 2D (& 3D) computer modelling. E-
mail information sharing
Integrated, mainly 3D computer modelling.
Collaborative information sharing
Largely undefined. iBIM ???
Source – Bew & Richards
BIM…(level 2) documents
BSI B/555 (Level 2) Roadmap PAS 1192-2 capital expenditure PAS 1192-3 operation expenditure BIM Protocol as created by CIC Government Soft Landings explained BS 1192:4 Cobie Digital Plan of Works project
BIM...B/555 Roadmap
Document and describe construction design, modelling & data exchange in the past, current and future Supports the 2011 HMG BIM Strategy
Source – Bew & Richards
BIM…PAS1192-2 & 3 capex
..........& opex
Specification for information management for the capital / delivery phase of construction projects using BIM Specification for information management for the operational phase of assets using BIM
Source - bsi
BIM…BIM Protocol
A supplementary legal agreement that is incorporated into professional services appointments and construction contracts by means of a simple amendment Based on the direct contractual relationship between the employer and the supplier The primary objective is to enable the production of a BIM at defined project stages
Source – BIM Task Group
BIM…GSL
Enables a smooth transition from the design and construction phase to the operational phase of a built asset Compared with the POE (Post Occupancy Evaluation) it seeks to compare the required performance outcomes with the actual performance outcomes
Source – BIM Task Group
BIM…BS1192:4 COBie
Construction Operations Building information exchange provides a common structure for the exchange of information about new and existing facilities Includes both buildings and infrastructure
Source – BIM Task Group
BIM…BIM Digital Toolkit
Spring 2015 To complete Level 2 BIM
BIM…3D Objects
BIM…PDT’s
Category eg: Cable Ladder System or Powertrack System
Company info eg: Name, website, link to tech data
Product specification data eg: dimensional, finishes, electrical
Sustainability eg: embodied carbon, EPD’s
FM eg: maintenance schedules
BIM…not all that is seems ? Source –
BIM…not all that is seems ?
Source – AEC 2011