  • GF Ground Floor ±0"

    GF Ground Floor ±0"

    02 Roof +19'-0"

    02 Roof +19'-0"

    03 Parapet +25'-0"

    03 Parapet +25'-0"

    SEGMENT 1 SEGMENT 2 SEGMENT 3

    3.5 9

    18 .75

    2.6 6

    FINISH GRADE

    03 0104 0205051904070609 02 08 0801 1714

    SCALE: HORIZONTAL DETAIL #1

    P-2 P-1 A-1A-2

    1403

    MATERIALS OVERLAY: TOTAL FACADE AREA : 1960 SF AREA OF WINDOWS AND DOORS: 652 SF TOTAL WALL AREA FOR MATERIAL CALC: 1308 SF

    REQUIRED BRICK/STONE/CAST CONC:(.75): 981 SF

    BRICK/STONE/CAST CONC USED: 1308 SF

    ARTICULATION OVERLAY: TOTAL BUILDING HEIGHT : 25.0 FT MIN. HEIGHT OF BODY(*.50): 12.0 FT

    CAP: 2.66 FT BODY: 18.75 FT BASE: 3.59 FT

    COMPOSITION OVERLAY

    COLOR OVERLAY: PRIMARY COLOR (P-1) BRICK COLOR SUNSET FLASHED PRIMARY COLOR (P-2) BRICK COLOR REDCLIFF

    ACCENT COLOR (A-1) IVORY WHITE ACCENT COLOR (A-2) BLACK

    SCALE: HORIZONTAL DETAIL #2

    GF Ground Floor ±0"

    GF Ground Floor ±0"

    02 Roof +19'-0"

    02 Roof +19'-0"

    03 Parapet +25'-0"

    03 Parapet +25'-0"

    SEGMENT 1 SEGMENT 2 SEGMENT 3

    3.5 9

    18 .75

    2.6 6

    SCALE: HORIZONTAL DETAIL #2

    SCALE: HORIZONTAL DETAIL #1

    FINISH GRADE

    P-2 P-1 A-1 A-2

    MATERIALS OVERLAY: TOTAL FACADE AREA : 1960 SF AREA OF WINDOWS AND DOORS: 306 SF TOTAL WALL AREA FOR MATERIAL CALC: 1654 SF

    REQUIRED BRICK/STONE/CAST CONC:(.75): 1089 SF

    BRICK/STONE/CAST CONC USED: 1654 SF

    ARTICULATION OVERLAY: TOTAL BUILDING HEIGHT : 25.0 FT MIN. HEIGHT OF BODY(*.50): 12.0 FT

    CAP: 2.66 FT BODY: 18.75 FT BASE: 3.59 FT

    COMPOSITION OVERLAY

    COLOR OVERLAY: PRIMARY COLOR (P-1) BRICK COLOR SUNSET FLASHED PRIMARY COLOR (P-2) BRICK COLOR REDCLIFF

    ACCENT COLOR (A-1) IVORY WHITE ACCENT COLOR (A-2) BLACK

    03 08 021305090704 110205 141603 15 04

    06 08 1905

    17 17 18 18

    N

    01

    02

    03

    04

    05

    06

    07

    08

    09

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    KEY PLAN

    PREFAB METAL CANOPY

    SOLDIER COURSE BRICK VENEER: (COLOR A)

    E.I.F.S CORNICE

    CAST-IN STONE ACCENTS

    BRICK VENEER: (COLOR B)

    CAST-IN STONE BAND

    ARRISCRAFT BRICK VENEER

    BRICK VENEER: (COLOR A)

    WINDOW WALL/STOREFRONT

    STANDING SEAM METAL CANOPY

    INSULATED SECTIONAL OVERHEAD DOOR

    OMITTED

    BRAND SIGN

    METAL COPING

    MECHANICAL GRILLE

    ROOF ACCESS LADDER

    EXTERIOR WALL PACK. SEE E2.01

    HOLLOW METAL DOOR & FRAME PAINTED TO MATCH BRICK

    RECESSED HORIZONTAL BRICK BAND

    ELEVATION NOTES

    GENERAL NOTES SOLDIER COURSE BRICK DETAIL ABOVE STOREFRONT OCCURS BEHIND STANDING SEAM METAL CANOPY

    1.

    CARPENTER HILL LANE

    SCALE: 1/4" = 1'-0" E3MATERIALS, COMPOSITION, TRANSPARENCY, ARTICULATION, AND COLOR OVERLAY - NORTH ELEVATION

    SCALE: 1/4" = 1'-0" A3MATERIALS, COMPOSITION, TRANSPARENCY, ARTICULATION, AND COLOR OVERLAY - SOUTH ELEVATION

    A3

    E3

    APPROVED by the Town of Cary Development Review Committee

    12/20/2018 By: Kevin A. Hales

    A5.04 EXTERIOR ELEVATIONS1