Master plan sheet 1 B-Tourist Terminal Malindi
-
Upload
aden-saitabau-kumary -
Category
Design
-
view
16 -
download
1
Transcript of Master plan sheet 1 B-Tourist Terminal Malindi
GSPublisherVersion 0.0.100.100
N
TOURIST TERMINAL AND INFORMATION CENTRE-MALINDI KUMARY S KIUNGA B02/36033/2013
PROJECT 5 TOURIST TERMINAL & INFORMATION CENTRE
TENNIS COURT
.
.
.
.
24
x 15
0 =
3,60
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
x 15
0 =
3,60
0 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24 x 150 = 3,600
1 2 3 4 5 6 7 8 9 10 11
12
1314151617181920212223
24
x 15
0 =
3,60
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
x 15
0 =
3,60
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
F
F
X X
02
01
03
04
Steps up
Handrail
PAVED WALKWAY TO THE WASHROOMS
900mmHigh handrail
Exhibition concourse elevated to allowfor natural takeventilation advantageof the the good viewsthat the site offers
Symbolicmonumentto details
Steps
Pergola towalkway
Jetting water fountainwith visual connectionto the statue
Island Bar todetails
500mm highRetaining
wall to details
SwimmingChanging
Rooms
FireAssembly
point
Heliport
2000mm Widesliding door
Post box accessedfrom the lounge
2000mmhigh wall
Opening withroller shutter door
Door opening to thevibrant piazza
High levelwindow
Ramp 1:12
RAMP 1:12
Planter todetails
Jetting water fountain
Amphitheatre255 pax
LOUNGE
BANK 1
HOTEL BOOKING
Stairs
TOURS OPERATIONS
BOAT HIRE
HELICOPTER HIRE
ARCADELINKING THE TWO COURTS
FLORIST CORNER
NEWS PAPERSTAND
FRUIT VENDOR
CURIO KIOSK
MALE WASHROOM
CRAFT/LEATHERGOODS
JEWELLERYBOUTIQUE
CHEF'S OFFICE
DRY STORECOLD STORE
DINING SPACE
KITCHEN
RECEPTIONLOBBY
STAGE
DRAIN DRAIN
AMPHITHEATRE 253(PAX)
PHYSICALLYCHALLENGED
AMPHITHEATRE 255(PAX)scale 1:100
OPEN SPACE BENEATH THEEXIHIBITION CONCOURSE FOR
MUSIC,FOOD AND ARTFESTIVALS
POSTA
FIRE ASSEMBLYPOINT
BREAKOUT PIAZZA
ISLAMIC GARDENRELAXATION GARDEN
AIRLINE
BANK 2
FEMALEWASHROOM
SNACK BAR
WATER POND
Water Fountain
Water Fountain Water Fountain
Water Fountain
Water Fountain
LIFT
FEMALE CHANGINGROOMS
MALE CHANGINGROOMS
2000
New contour
Cashier
Queue space
Tellers
Back office
SteelVault
Queue spaceTellers
Back office
SteelVault
BANK 3
Queue spaceTellers
Back office
SteelVault
Fruit rack
Airlock
PWD Airlock
Airlock
Clnrscloset
Clnrscloset
CURIO 1 CURIO 2 CURIO 3
CURIO 4CURIO 5
Kitchen staffrelaxation area
OUT DINING SPACE
CHANGING ROOMCHANGING ROOM
Pond
Serv
ery
Cashier
Y
Y
300mm thickmasonry wall
plastered andpainted white
SWIMMING POOLF.CHANGING
ROOM
M.CHANGINGROOM
Organizing along a linear axis that connects the existing museum to the proposed touristterminal the connecting axis jutes into the ocean as a jetty
The building is narrow in plan and oriented alongthe east-west axis to reduce the sun conductsurface area,this faces have minimal windowsopenings,the few ones are sunshaded.
The building also takes advantage of the North-EastMonsoon wind and the ocean Breeze throughelevation of the entire scheme by 500mm andarrangement of the blocks to allow infiltration of thebreeze.
OBJECTIVESDemonstrate understanding of how to designenvironmental friendly building in warm humid climatewhere design development effectively takes care ofthermal control and cooling effects
Design of a building that truly displays the culturalart,Drama ,Music and natural endowment this buildingwill act as a hub for tourist in malindi and the coastalregion at large in addition the centre attempts toembody the aspiration and pride of the swahili peoplethrough employment of key architectural elementssynonimous to the swahili people(Arches,Windows,Doors,Courtyards etc)
The building employs several strategy to meet itsenvironmental bar,1.Orientation the east-west orientation minimize sunexposure on openings.2. Use of thick thermal wall(300mm thick) especialy onthe western facade.3.Mashrubiyah sun shading devices on all openings.4. deep verandah and corridors sunshading the widedisplay windows.5.Use of reflective color on the exterior walls.6.Use of local materials,Mazeras for wall claddingand as pavement blocks for circulation routes
THE PROJECT
CONCEPT SKETCHES
MASTER PLANSCALE 1:200PERGOLA
SCULPTURE
windcatcher
01