Master plan sheet 1 B-Tourist Terminal Malindi

1
GSPublisherVersion 0.0.100.100 N TOURIST TERMINAL AND INFORMATION CENTRE-MALINDI KUMARY S KIUNGA B02/36033/2013 PROJECT 5 TOURIST TERMINAL & INFORMATION CENTRE TENNIS COURT . . . . 24 x 150 = 3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 x 150 = 3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 x 150 = 3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 x 150 = 3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 x 150 = 3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 F F X X 02 01 03 04 Steps up Handrail PAVED WALKWAY TO THE WASHROOMS 900mm High handrail Exhibition concourse elevated to allow for natural take ventilation advantage of the the good views that the site offers Symbolic monument to details Steps Pergola to walkway Jetting water fountain with visual connection to the statue Island Bar to details 500mm high Retaining wall to details Swimming Changing Rooms Fire Assembly point Heliport 2000mm Wide sliding door Post box accessed from the lounge 2000mm high wall Opening with roller shutter door Door opening to the vibrant piazza High level window Ramp 1:12 RAMP 1:12 Planter to details Jetting water fountain Amphitheatre 255 pax LOUNGE BANK 1 HOTEL BOOKING Stairs TOURS OPERATIONS BOAT HIRE HELICOPTER HIRE ARCADE LINKING THE TWO COURTS FLORIST CORNER NEWS PAPER STAND FRUIT VENDOR CURIO KIOSK MALE WASHROOM CRAFT/LEATHER GOODS JEWELLERY BOUTIQUE CHEF'S OFFICE DRY STORE COLD STORE DINING SPACE KITCHEN RECEPTION LOBBY STAGE DRAIN DRAIN AMPHITHEATRE 253(PAX) PHYSICALLY CHALLENGED AMPHITHEATRE 255(PAX) scale 1:100 OPEN SPACE BENEATH THE EXIHIBITION CONCOURSE FOR MUSIC,FOOD AND ART FESTIVALS POSTA FIRE ASSEMBLY POINT BREAKOUT PIAZZA ISLAMIC GARDEN RELAXATION GARDEN AIRLINE BANK 2 FEMALE WASHROOM SNACK BAR WATER POND Water Fountain Water Fountain Water Fountain Water Fountain Water Fountain LIFT FEMALE CHANGING ROOMS MALE CHANGING ROOMS 2000 New contour Cashier Queue space Tellers Back office Steel Vault Queue space Tellers Back office Steel Vault BANK 3 Queue space Tellers Back office Steel Vault Fruit rack Airlock PWD Airlock Airlock Clnrs closet Clnrs closet CURIO 1 CURIO 2 CURIO 3 CURIO 4 CURIO 5 Kitchen staff relaxation area OUT DINING SPACE CHANGING ROOM CHANGING ROOM Pond Servery Cashier Y Y 300mm thick masonry wall plastered and painted white SWIMMING POOL F.CHANGING ROOM M.CHANGING ROOM Organizing along a linear axis that connects the existing museum to the proposed tourist terminal the connecting axis jutes into the ocean as a jetty The building is narrow in plan and oriented along the east-west axis to reduce the sun conduct surface area,this faces have minimal windows openings,the few ones are sunshaded. The building also takes advantage of the North-East Monsoon wind and the ocean Breeze through elevation of the entire scheme by 500mm and arrangement of the blocks to allow infiltration of the breeze. OBJECTIVES Demonstrate understanding of how to design environmental friendly building in warm humid climate where design development effectively takes care of thermal control and cooling effects Design of a building that truly displays the cultural art,Drama ,Music and natural endowment this building will act as a hub for tourist in malindi and the coastal region at large in addition the centre attempts to embody the aspiration and pride of the swahili people through employment of key architectural elements synonimous to the swahili people (Arches,Windows,Doors,Courtyards etc) The building employs several strategy to meet its environmental bar, 1.Orientation the east-west orientation minimize sun exposure on openings. 2. Use of thick thermal wall(300mm thick) especialy on the western facade. 3.Mashrubiyah sun shading devices on all openings. 4. deep verandah and corridors sunshading the wide display windows. 5.Use of reflective color on the exterior walls. 6.Use of local materials,Mazeras for wall cladding and as pavement blocks for circulation routes THE PROJECT CONCEPT SKETCHES MASTER PLAN SCALE 1:200 PERGOLA SCULPTURE windcatcher 01

Transcript of Master plan sheet 1 B-Tourist Terminal Malindi

Page 1: Master plan sheet 1 B-Tourist Terminal Malindi

GSPublisherVersion 0.0.100.100

N

TOURIST TERMINAL AND INFORMATION CENTRE-MALINDI KUMARY S KIUNGA B02/36033/2013

PROJECT 5 TOURIST TERMINAL & INFORMATION CENTRE

TENNIS COURT

.

.

.

.

24

x 15

0 =

3,60

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

x 15

0 =

3,60

0 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24 x 150 = 3,600

1 2 3 4 5 6 7 8 9 10 11

12

1314151617181920212223

24

x 15

0 =

3,60

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

x 15

0 =

3,60

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

F

F

X X

02

01

03

04

Steps up

Handrail

PAVED WALKWAY TO THE WASHROOMS

900mmHigh handrail

Exhibition concourse elevated to allowfor natural takeventilation advantageof the the good viewsthat the site offers

Symbolicmonumentto details

Steps

Pergola towalkway

Jetting water fountainwith visual connectionto the statue

Island Bar todetails

500mm highRetaining

wall to details

SwimmingChanging

Rooms

FireAssembly

point

Heliport

2000mm Widesliding door

Post box accessedfrom the lounge

2000mmhigh wall

Opening withroller shutter door

Door opening to thevibrant piazza

High levelwindow

Ramp 1:12

RAMP 1:12

Planter todetails

Jetting water fountain

Amphitheatre255 pax

LOUNGE

BANK 1

HOTEL BOOKING

Stairs

TOURS OPERATIONS

BOAT HIRE

HELICOPTER HIRE

ARCADELINKING THE TWO COURTS

FLORIST CORNER

NEWS PAPERSTAND

FRUIT VENDOR

CURIO KIOSK

MALE WASHROOM

CRAFT/LEATHERGOODS

JEWELLERYBOUTIQUE

CHEF'S OFFICE

DRY STORECOLD STORE

DINING SPACE

KITCHEN

RECEPTIONLOBBY

STAGE

DRAIN DRAIN

AMPHITHEATRE 253(PAX)

PHYSICALLYCHALLENGED

AMPHITHEATRE 255(PAX)scale 1:100

OPEN SPACE BENEATH THEEXIHIBITION CONCOURSE FOR

MUSIC,FOOD AND ARTFESTIVALS

POSTA

FIRE ASSEMBLYPOINT

BREAKOUT PIAZZA

ISLAMIC GARDENRELAXATION GARDEN

AIRLINE

BANK 2

FEMALEWASHROOM

SNACK BAR

WATER POND

Water Fountain

Water Fountain Water Fountain

Water Fountain

Water Fountain

LIFT

FEMALE CHANGINGROOMS

MALE CHANGINGROOMS

2000

New contour

Cashier

Queue space

Tellers

Back office

SteelVault

Queue spaceTellers

Back office

SteelVault

BANK 3

Queue spaceTellers

Back office

SteelVault

Fruit rack

Airlock

PWD Airlock

Airlock

Clnrscloset

Clnrscloset

CURIO 1 CURIO 2 CURIO 3

CURIO 4CURIO 5

Kitchen staffrelaxation area

OUT DINING SPACE

CHANGING ROOMCHANGING ROOM

Pond

Serv

ery

Cashier

Y

Y

300mm thickmasonry wall

plastered andpainted white

SWIMMING POOLF.CHANGING

ROOM

M.CHANGINGROOM

Organizing along a linear axis that connects the existing museum to the proposed touristterminal the connecting axis jutes into the ocean as a jetty

The building is narrow in plan and oriented alongthe east-west axis to reduce the sun conductsurface area,this faces have minimal windowsopenings,the few ones are sunshaded.

The building also takes advantage of the North-EastMonsoon wind and the ocean Breeze throughelevation of the entire scheme by 500mm andarrangement of the blocks to allow infiltration of thebreeze.

OBJECTIVESDemonstrate understanding of how to designenvironmental friendly building in warm humid climatewhere design development effectively takes care ofthermal control and cooling effects

Design of a building that truly displays the culturalart,Drama ,Music and natural endowment this buildingwill act as a hub for tourist in malindi and the coastalregion at large in addition the centre attempts toembody the aspiration and pride of the swahili peoplethrough employment of key architectural elementssynonimous to the swahili people(Arches,Windows,Doors,Courtyards etc)

The building employs several strategy to meet itsenvironmental bar,1.Orientation the east-west orientation minimize sunexposure on openings.2. Use of thick thermal wall(300mm thick) especialy onthe western facade.3.Mashrubiyah sun shading devices on all openings.4. deep verandah and corridors sunshading the widedisplay windows.5.Use of reflective color on the exterior walls.6.Use of local materials,Mazeras for wall claddingand as pavement blocks for circulation routes

THE PROJECT

CONCEPT SKETCHES

MASTER PLANSCALE 1:200PERGOLA

SCULPTURE

windcatcher

01