Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014

Transcript of Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley...

Page 1: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Master Plan Report

Waverley Christian College

Narre Warren South Campus

Issue DRAFT

Feb 2014

Page 2: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Suite 1, 70 Kerr Street, Fitzroy, Victoria 3065

Tel (03) 9416 3044, Fax (03) 9416 3232 [email protected] www.williamsross.com.au

Directors Virginia Ross, Christopher Hose, Gray Barton

Bill K Williams Pty Ltd ACN 005 624 868

Contents

1 Executive Summary ___________________________________ 3

2 Introduction ________________________________________ 5

3 Master Plan ________________________________________ 11

4 Cost Estimate ______________________________________ 20

5 Town Planning ______________________________________ 21

A NWS Facilities Master Plan Brief ______ Error! Bookmark not defined.

B Master Plan Area Schedule __________ Error! Bookmark not defined.

C Master Plan Drawings _____________ Error! Bookmark not defined.

D Feature and Level Survey ___________ Error! Bookmark not defined.

E Cost Plan ______________________ Error! Bookmark not defined.

F Copy of Title ____________________ Error! Bookmark not defined.

G Existing Planning Permit ____________ Error! Bookmark not defined.

H Town Planning Advice ______________ Error! Bookmark not defined.

Document ID: 1330_Master Plan Report.docx

Project No: 1330

Issue No: ISSUE DRAFT

Date: Feb 2014

Page 3: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Waverley Christian College, Narre Warren South Campus ISSUE DRAFT

Master Plan Report Page 3 / 22

1 Executive Summary

1.1 Introduction

Waverley Christian College (WCC) was established in 1978, moving to the

Wantirna South campus in 1989. The Wantirna South campus has an enrolment

of over 1200 students from Kindergarten to Year 12.

The College commenced operations from a second campus in Narre Warren

South in 2012 offering Prep to Year 9 in 2014 with an enrolment of about 400

students. Classes up to Year 12 are expected to be offered by 2017. The campus

has a student cap of 1350, and the College aims to grow to a 4-stream school of

1300 students.

An existing childcare service remains in operation on the site until the end of

2014. After this date childcare and kindergarten will no longer be offered from

the Narre Warren South site.

The Narre Warren South campus was established by another College as an

education facility in 2006-07. An existing Development Plan (master plan) was

endorsed in 2006 by Casey City Council based on this previous College’s vision.

The existing buildings on site were constructed between 2006 and 2009.

Waverley Christian College purchased the site in 2011and have recognised the

need to review the current Development Plan against the College’s vision for the

campus.

1.2 Master Plan Scope

WCC appointed Williams Ross Architects to undertake the College master plan

for the Narre Warren South campus to reflect the new vision for the campus.

The master plan was to encompass:

Development of a facility area analysis and brief based on the

College’s vision and identified facility needs, refer the appendix for

the ‘NWS Facilities Master Plan’ document prepared by the College

Review of existing facilities, site uses and faculty distribution

Compilation of existing conditions floor plans

Identification of priority projects and building opportunities for the

College for short and long term planning

Review of existing Town Planning Permits and strategy for future

amendment to the Development Plan for the site

The College master plan was undertaken alongside a feasibility report for the new

Gym / Auditorium building. The new Gym / Auditorium building has been

identified as a priority project in the master plan.

The work undertaken by the consultant team on the Gym / Auditorium Feasibility

Report has informed the master plan itself.

Please also refer to the Gym / Auditorium Feasibility Report, dated January 2014.

1.3 Previous Studies and Documentation

The master plan review is based on the following documents:

Page 4: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Waverley Christian College, Narre Warren South Campus ISSUE DRAFT

Master Plan Report Page 4 / 22

NWS Facilities Master Plan, prepared by the College

Hard copy plans of existing buildings obtained from the College

Previous site master plan prepared for the previous School

Endorsed Town Planning Development Plan drawings

Feature and Level Survey completed by Millar Merrigan in February

2014

1.4 Terms of Reference

This report was prepared for the use of Waverley Christian College by Williams

Ross Architects. No one other than Waverley Christian College may rely on it and

Williams Ross Architects does not accept responsibility to any other user.

Findings and analysis are based on drawings and photos of the site. A visual site

inspection was conducted only. Detail site measure and inspections were not

conducted.

Subject to these limitations Williams Ross Architects confirms that to the best of

its knowledge the content and drawings provided in this report are a fair and

reasonable description of proposed facility requirements and a potential

development approach at the time of writing.

Page 5: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Waverley Christian College, Narre Warren South Campus ISSUE DRAFT

Master Plan Report Page 5 / 22

2 Introduction

2.1 Existing Site Description

Waverley Christian College Narre Warren South Campus is located at 20 College

Drive, Narre Warren South. The College site is bounded by Cranbourne-Narre

Warren Road, Pound Road and College Drive.

College Administration and main pedestrian entry faces College Drive. The main

vehicular entry to the College is via two separate car park entries off College

Drive.

The site has a slight fall down to the Pound Road, Cranbourne-Narre Warren Road

corner. The College Drive and Pound Road corner of the site has been built up

above street level with site fill during previous construction works creating a

grassed batter up from the street.

Source: Nearmap

Page 6: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Waverley Christian College, Narre Warren South Campus ISSUE DRAFT

Master Plan Report Page 6 / 22

2.2 Investigations and Reports

Members of the consultant team have made various site inspections and

investigations, and the following supporting information has been obtained:

Williams Ross Architects: Various site inspections to understand

existing facilities

BRT Consultants: Advice on site services based on BRT’s

work on the Gym / Auditorium building

Millar Merrigan Feature and Level Survey

Contour Town Planners Review and advice on existing Town

Planning Permits and future town

planning strategy

Cardno Traffic Engineers Review of existing drop-off / pick-up

traffic flow and advice on vehicle access to

Cranbourne Narre-Warren Rd

Page 7: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

2.3 Existing Condition Surveys and Drawings

The following existing conditions surveys and inspections were made:

2.3.1. Building Plans

Existing hardcopy drawings of the College were converted to CAD. Where possible,

these drawings were updated to reflect the current internal layouts of buildings.

These updated drawings do not constitute detail inspections or measure-up of

buildings.

Please refer to the appendices for the updated site plans for the College.

2.3.2. Level and Feature Surveys

A new feature and level survey was undertaken by Millar Merrigan as part of this

project. Please refer the appendices for a copy of this drawing.

A title re-establishment survey was not undertaken as part of the master plan

process.

2.3.3. Site Services

BRT Consultants were commissioned to provide advice on site services for the

proposed Gym / Auditorium feasibility project. This work has also informed the

master plan.

Please refer to Gym / Auditorium Feasibility report for further information.

2.4 Existing Site Description

A site analysis of existing conditions was conducted to:

Understand site distribution of uses, activities and faculties

Review accessibility across the site, external circulation and use of

external space

Identify future building opportunities

Identify opportunities for upgrading existing facilities

Identify any authority controls over the site, such as town planning

overlays and the existing Development Plan (refer Section 5)

The following drawings illustrate the existing site conditions.

Page 8: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Existing Site Plan, not to scale

Page 9: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Existing Use Distribution on Site , not to scale

Page 10: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

2.5 Existing Buildings

While WCC commenced operations from the Narre Warren South campus in 2012,

the campus was established in 2006 with the following existing facilities

constructed between 2006 and 2009:

Early Learning Centre, a single storey building with surrounding licensed

children’s play area

Administration Building, a 2-storey building with main College

administration on the ground floor, and the resource centre, a small

auditorium and 7 general learning areas (GLAs) on the first floor. A lift

connects the two levels.

Specialist Building, a 2-storey building with Food Technology, Design

Technology and Art on the ground floor and 2 x Science Labs and 4 x GLAs

on the first floor. Student amenities and change facilities are externally

accessed from the ground and first levels.

Walkways, 2-storey walkways connect the Administration and Specialist

Buildings

2.6 Existing Outdoor Play Space

The site is 7.49ha in size, providing for good potential for outdoor passive and play

spaces. The existing site has the following outdoor spaces available for students:

Children’s playground associated with the Childcare Centre

Double basketball court / play space

Play equipment

Large grassed areas

Junior oval

The existing site master plan allows for the following additional external sports

facilities:

Senior oval

Tennis Courts

Multi-purpose sports field (hockey and/or soccer)

2.7 Existing Vehicular Movement and Car Parking

There are three vehicle entries off College Drive,1 for the northern car park, 1

located centrally along College Drive for access to Administration and visitor car

parking, and 1 near the corner of College Drive and Pound Road for access to the

Pound Road car park.

There is a minor vehicle access point from Cranbourne-Narre Warren Road.

On site there is good separation between students and vehicles with the only

vehicles crossing student areas being maintenance vehicles.

The endorsed Town Planning drawing ‘Master Site Layout Ultimate’ cites a total of

305 car spaces required on site. However the same drawing only shows about 270

car spaces. Preliminary advice indicates the 305 figure will be the required car

parking provision for the full master plan once there are 1300 students on site.

Page 11: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

3 Master Plan

3.1 Master Plan Concept

The concept for the Waverely Christian College master plan is based on creating

discreet Junior (prep – Yr 6), Middle (Yr 7 – Yr9) and Senior (Yr10 – Yr12) buildings

with corresponding courtyard areas. Specialist facilities would be dispersed and

accessible to all year levels. College Administration and the Resource Centre

would remain in a central position on the campus.

3.2 Facilities

The master plan proposed the following facilities:

3.2.1. Prep and Junior Facilities

The existing childcare facility will be refurbished into a standalone Prep Building:

4 x Prep GLAs of minimum 80sq.m for 100 students

Staff facilities

Interview Room

General Purpose Room

Page 12: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Foyer with display space

Student amenities for 100 students

Retain access to the northern play area

Create new entry to the building facing the new Junior Building across a

Junior Forecourt area

The new 2-storey Junior Building will house Year 1 to Year 5, 4 stream year levels,

or a total of 500 students:

Foyer and entry with display

Staff offices and facilities

20 x GLAs with locker pigeon holes directly outside classrooms

Interview room

3 Resource / Seminar spaces of 20sq.m each

Primary Drama Room

Primary General Purpose Room

Student Amenities

Year 6 facilities (4 x GLAs) would be located upstairs in the Administration Building

in the northern corner of the building. An external upper floor connection would

provide direct access for Year 6 students into the Year 3-5 area, and vice versa.

3.2.2. Middle School Facilities

The new single storey Middle School Building will house Year 7 to Year 9, 4 stream

year levels, or a total of 300 students:

Foyer and entry with display

Staff offices and facilities

8 x GLAs

Interview room

3 Resource / Seminar spaces of 20sq.m each

Lockers access externally undercover

Middle School students would access the existing student amenities in the

Specialist Building.

3.2.3. Senior School Facilities

The new 3-storey Senior School Building will house Year 10 – Year 11, 4 stream

year levels, or a total of 300 students:

Foyer and entry with display

Staff offices and facilities

14 x GLAs

Interview room

3 Resource / Seminar spaces of 20sq.m each

Lockers accessed internally

VCE Common and Study Rooms

Careers Room

Page 13: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Senior School students would access the existing student amenities in the

Specialist Building.

3.2.4. Resource Centre

The Resource Centre will be located centrally on the campus, upstairs in the

Administration Building at the southern end of the building overlooking the existing

green space.

3.2.5. Gym / Auditorium

The Gym / Auditorium building will be located along Pound Road, facing the new

Senior Oval. This site has good connection to future external sports facilities.

The building will house:

Foyer and entry with display

Staff offices

Fitness Room

1 x single court netball / basket ball court

Raised stage with storage

Mezzanine level overlooking the Gymnasium

Seating storage

PE store

Student amenities and change facilities

3.2.6. Performing Arts and Music Building

The Performing Arts and Music building will face the College Drive / Pound Road

intersection between the existing 2-storey Administration building and the 2-storey

Specialist building.

The 2-storey building will house:

Foyer and entry with display

Staff offices

Auditorium divided by an operable wall, with retractable seating for 300

Backstage dressing rooms and storage

Control room and technical storage upstairs

Secondary Music Classroom

2 x Ensemble Rooms with shared recording studio

2 x Primary Music Classrooms

9 x Music Tutorial rooms (including the recording studio)

A first floor connection can be made to the first floor of the adjacent Administration

building.

Audience amenities would be located in the adjacent Specialist building.

3.2.7. Existing Specialist Building

The existing 2-storey Specialist Building requires completion of its internal fit-out

to provide:

Ground Floor:

1 x Food technology practical space (existing)

Page 14: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

1 x Food Technology dining / theory space (new)

2 x Visual Arts rooms (new)

2 x Design technology rooms and store (1 existing, 1 new)

First Floor:

2 x Science Labs at 64sq.m each (existing)

4 x Science Labs at minimum 100sq.m each (new)

Prep and chemical store

Science staff space

A new 2-storey extension to the west side of the existing building is proposed to

provide a dedicated Maintenance office, delivery access and store on the ground

floor and added capacity for the larger Science Labs on the first floor.

Page 15: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

3.3 5-Year Master Plan - Stages

The 5-year master plan includes building projects to support the growth in student

numbers to a 2-stream College by 2017 – approximately 650 students.

Implementation of the 5-year master plan includes:

Year Stage

2014 Senior Oval

2015 Construct new Gym / Auditorium

End 2015 – convert childcare centre into Prep Building (4 x GLAs)

2016

2017

2018

3.4 5-10 Year Master Plan - Stages

The 5-10 year master plan includes building projects to support the growth in

student numbers to a 4-stream College by 2017 – approximately 1300 students.

Implementation of the 5-10 year master plan includes:

Year Stage

2019

2018

Page 16: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

3.5 Site Services

The following is a summary of the main site services and staging issues for the

major building projects as advised by BRT Consulting Engineers.

Electrical

The capacity of the existing supply agreement with the authority is unknown.

This needs to be determined to assess whether the existing substation has

the capacity for the new building and future master plan.

The existing Main Switch Board (MSB) has sufficient spare capacity for all

future buildings proposed in the master plan, including the Gymnasium /

Auditorium.

Existing reticulation of services has been installed in a logical way to supply

the future master plan.

Fire Detection

There is currently fire detection in each existing building connected to an early

Warning System (EWS) that provides alarms.

Although the new building will not require a detection system, the College

may extend this to the new buildings.

Gas

There is high pressure gas reticulated throughout the school.

Cold Water & Fire Services

Cold water, rainwater and fire services are reticulated throughout the school,

and are adequate to service the new building.

Sewer

Invert levels will need to be established before design is commenced.

Page 17: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Site Master Plan, not to scale

Page 18: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Master Plan, Ground Floor , not to scale

Page 19: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

Master Plan, First Floor , not to scale

Page 20: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

4 Cost Estimate

4.1 Cost Estimates

The following cost estimates have been prepared by Prowse Quantity Surveyors.

Please refer to appendix for the full cost plan.

5-Year Master Plan

Year Stage Anticipated Total

Project Cost (Excl GST)

2014 $

$

2015

$

2016 $

$

2017 $

2018

$

5-10 Year Master Plan

Year Stage Anticipated Total

Project Cost (Excl GST)

Page 21: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

5 Town Planning

Contour Town Planners have been engaged as planning consultants to assist the

College with existing and future town planning issues for the Narre Warren South

campus. The following is a summary of their advice. Please refer to their full report

in the appendix.

5.1 Town Planning Overview

The Narre Warren South campus of Waverley Christian College is located in the City

of Casey.

The site designated as Low Density Residential Zone and is subject to a

Development Plan Overlay (Schedule 1).

A Development Plan was prepared by the previous owners of the land and endorsed

by Council in line with the Development Plan Overlay (Schedule 1), known as

Permit No: P176/06A due to expire in mid-2014.

As part of the master plan project, an extension of time application was submitted

and approved by Council. The new Permit No is PlnA00375/06.A, with an expiry

date of 26 June 2016.

Please refer to the appendix for the ‘’Master Site Layout Ultimate’ and ‘Landscape

Master Plan’ drawings which form the latest versions of the endorsed plans, and a

copy of the Planning Permit Extension.

5.2 Section 173 Agreement

The College have a Section 173 agreement in place with the City of Casey over the

use of the plantation reserve land along the Pound Road and Cranbourne-Narre

Warren Road frontages.

The Section 173 Agreement allow for car parking, fencing and amenities in the

Plantation Reserve in favour of the College as shown on the endorsed plans. Please

refer to a copy of the title and agreement in the appendix.

5.3 Town Planning Process

Contour met with Council to discuss the town planning process for the revised

master plan. Contour has indicated the following steps in the approval processes

from here:

1. Gym / Auditorium Application including:

- an amended ‘Master Site Layout Ultimate’ drawing showing new Gym

footprint

- an amended ‘Landscape Master Plan’ showing changes to landscape

around new Gym footprint

- Gym / Auditorium detail plans and elevations

- justification for no additional car parking at this stage

2. Gym / Auditorium Application to allow outside school hours use for a Place

of Assembly. This application would be lodged after endorsement of the

permit noted above. This application will require:

- information on intensity of use and proposed hours

- anticipated maximum attendance

- assessment of anticipated car parking demand

3. Master Plan Amendment. This application will reflect the WCC vision for the

site for the next say 5-8 years. This application will require:

- an amended ‘Master Site Layout Ultimate’ drawing showing new building

Page 22: Master Plan Report Waverley Christian College NWS Master Plan...Master Plan Report Waverley Christian College Narre Warren South Campus Issue DRAFT Feb 2014 Suite 1, 70 Kerr Street,

footprints

- an amended ‘Landscape Master Plan’ showing changes to landscape

- justification for an alternate stormwater strategy

- justification for any changes to vehicle entry / exit

- application to extend the time period of the permit

5.4 Site Signage

The master plan includes a more substantial sign on the corner of Pound Road and

Cranbourne-Narre Warren Road.

Previous permits have been granted for site signage, and these need to be

obtained from Council prior to lodging a separate application for the new sign. The

application for the new sign should be able to occur independently of the process

noted above.