MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING...

24
April 2015 MARY BEACH WORKING GROUP MEETING 1

Transcript of MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING...

Page 1: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

April 2015 MARY BEACH WORKING

GROUP MEETING

1

Page 2: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

1. Meeting 3-4 years on the Roy McNabb option stale mate – Roy would rather see something done than nothing.

2. We have a set budget $1.2m and limited time

3. Several costings undertaken – all exceeding allocated budget $1.2m by millions

4. WRC minutes (2012) unlikely to get consent

5. We’ve gone to the other end looking at what we can build within budget

6. We’ve got a well used public asset (wharf) that needs urgent repair

7. What do you want to add

8. We can start building straight away

9. Fish & Chips and a drink

PRINCIPLES

2

Page 3: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Cost estimates for both Bof fa Miskell and McNabb projects over budget, by $1m, also not ful ly f i t for purpose 70metre too short .

$2.2m Bof fa Miskell 70metre option quote only based on cheapest seawall, excluded boat ramps, viewing platforms, wharfs, promenades, demolition of old wharf and rock edge protection.

Significant uncertainty around consenting costs and approval of reclamation – upwards of $500k.

Dredging costs have not been determined $10k max annually

Unknown on-going maintenance costs of land reclamation

Options don’t address wharf age and redevelopment – r isk wharf could col lapse 3-6 years

Tairua Wharf is owned by Council since 1913 and has been maintained by Council since then, with ongoing maintenance responsibil it ies.

Any reclamation requires consent from the crown and subject to treaty sett lements.

Site hasn't been specifically raised in the Hauraki negotiations. However al l Crown land is subject to Treaty of Waitangi claims unti l al l claims in that area have been sett led. Peter Wishart has of fered his services in contacting al l Iwi to progress any options .

RISKS

3

Page 4: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

LAND OWNERSHIP

Crown Land

4

Page 5: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

1. To renew and ensure the continued safe operation of the

Tairua Wharf facility.

2. A safe all tide boat launching facility at Mary Beach and

improved loading facilities for ‘big boats’ that is equitable

for ratepayers of Tairua-Pauanui

3. To provide for adequate trailer boat parking at Tairua that

adequately addresses summer peak demand periods but

also is affordable and reflects a year round facility.

PROJECT OBJECTIVES

1

Page 6: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Existing

Arrangements/Business

needs

Al l t ide t ra i ler boat fac i l i ty w i th pedest r ian whar f for b ig boats and t ra i ler boat ramp caters for t ra i ler boats .

Condit ion assessments in 2011 and 2014 urgent repair (3 -6 years) of the pi les and deck and handrai ls and fenders

Of the four Commercia l operators , three unload approximately 5 t imes a week .

40 launches and yachts (of those 4 commercial ) . Approximately 1/3rd of these are used every day over Christmas hol iday per iod (12 ) .

What has changed to t r igger investment in a new al l - t ide whar f w i th c loser loading ( i .e . land rec lamation and new paral le l whar f )?

Tai rua Mar ina 95 Ber th (8 -25m vessels ) – can lease dai ly $20 or rent over summer - last Chr is tmas 10 8m ber ths taken, about 15 avai lable .

Future Demand/Requirements

Commercial f ish ing is decl ining in

Tai rua -Pauanui wi th the main

processing plant at Whit ianga .

However commercial recreat ional

f ish ing and marine serv ices are

cont inuing to grow. The second

biggest contr ibutor to NZ GDP in the

Coromandel is the f ishing industr y.

OBJECTIVE ONE: TAIRUA WHARF

6

Page 7: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Opportunity to upgrade the wharf current footprint – and enhance boat ramp incl. safety

Reduce on-going maintenance Costs

Enhance historic Character

Minimums –

Re-pile and refurbish walkway – urgent

Fender replacement and handrail compliance.

Opportunities

Pontoon for safe boat launching

Enhance seating and fishing opportunities

Historic Info and entrance improvements (Community led)

Improvements to loading – powered troll ies

Limited consenting requirements low risk , high certainty – l ikely non notified – WRC Amy Robinson

RENEWAL AND UPGRADE EXISTING

WHARF

7

Page 8: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Tairua – Pauanui Ferry

Taranui (Commercial)

Jas 1 (Cray Fishing)

Slipper Island resort

Delphinus Dive Ltd

Strike Zone (Jason Harris)

Ricki Turner

Wayne Newell – Charter

Sky Mason – Skyline fishing/diving charter

40 launches and yachts. Approximately 1/3rd 12 of these are used every day over Christmas holiday period.

DISCUSSION: ISSUES AND

OPPORTUNITIES - COMMERCIAL BIG

BOATS(NON TRAILER) REQUIREMENTS

8

Page 9: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Kawau Island

1

Page 10: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

TOTAL MARINE SERVICES EXAMPLES

Kawau Island

10

Page 11: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

11

Page 12: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

DIFFERENT MATERIALS - BIRKENHEAD

Birkenhead Ferry Terminal

12

Page 13: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Existing

Arrangements/Business

needs

Tidal issues causing safety concerns for boat launching

Current boat ramp is all tide (does not need extending)

Capacity for 6-10 boat launching however pinch point at entrance

Concrete ramp limited width

15-20 days over the summer period (of which 5-8 over Christmas and new year) the ramp at Mary Beach is full with spil l over parking being accommodated along Petley Parade.

Future Demand/Requirements

Main Boat Launching location for recreational fishers Tairua and Tairua south.

Next year 2016 the Tairua Marina will be developed, reducing the number of trailer boat parks by approx. 40 - increasing demand on Mary Beach.

OBJECTIVE 2: SAFE ALL TIDE BOAT

LAUNCHING FOR TRAILER BOATS

13

Page 14: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

1

Page 15: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Half Moon Bay

15

Page 16: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

16

Page 17: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

17

Page 18: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

DISCUSSION – ISSUES AND

OPPORTUNITIES

18

Page 19: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Existing

Arrangements/Business

needs 19 dedicated trai ler boat parks

at Mary Beach.

15-20 days over the summer period (of which 5-8 over Christmas and new year) the trai ler boat parking at Mary Beach is ful l with spi l l over parking being accommodated along Petley Parade.

Apri l 2015 - Easter + fishing comp 15-20 trai ler boats plus ful l ferry and parking – no problems.

The remainder of the year there is adequate trai ler boat parking at Mary beach.

Future Demand/Requirements

Marina development

resulting in loss of 40 parks

Pressure on Mary Beach

due to one way bridge

access

On going increase in

holiday home demand and

visitors to Coromandel

OBJECTIVE 3: AFFORDABLE TRAILER

BOAT PARKING FOR PEAK PERIODS

19

Page 20: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

20

Page 21: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

21

Page 22: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

ENTRANCE – COMMUNITY PROJECT?

22

Page 23: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Estimates

Establishment - $40k

New Piles -$240k

New fender -$35k

Refurbish concrete deck - $60k

Handrail - $35k

Improve Pontoon- $45k

New Boat ramp/pontoon and grid move - $180k

Seawall repairs - $8k

Design - $30k

Sub total $673k

Plus consenting $10k

20% contingency

Total $807k

$1.2m less $807k = $400k – left for parking reconfiguration, entrance, landscaping, second floating boat ramp pontoon options

PROJECT COTS ESTIMATES

23

Page 24: MARY BEACH WORKING - Thames-Coromandel District · WRC Amy Robinson RENEWAL AND UPGRADE EXISTING WHARF 7 Tairua – Pauanui Ferry ... Resume Stakeholder group to progress project

Principle to progress Wharf redevelopment, floating pontoon

and Boat ramp improvements, and parking subject to:

Further refinement of estimate includes a civil engineering appraisal

and;

Concept plan for boat ramp – (for public)

A Business Case report to next community board meeting

Resume Stakeholder group to progress project

Engage Council roading engineer/consultant for design

options for Wharf Road/Tui terrace area including car parking

reconfiguration options, picnic facilities and wharf entrance.

WHERE TO FROM HERE?

24