ONE WATERFRONT – CENTRAL WATERFRONT MASTER PLAN Queens Quay / Water’s Edge / Marine + Habitat
QUEENS QUAY CENTRAL WATERFRONT
YO YO MA TO BAY
FUTURE PHASE
EAST BAYFRONT QUEENS QUAY
BAY TO PARLIAMENT Y
o Y
o M
a L
an
e
Sta
diu
m
Ro
ad
Bay S
t
Yo
ng
e S
t
Jarv
is S
t
Parl
iam
en
t
St
TRANSITION
ZONE
INTERIM
MGT
INTERIM
IMPROVEMENTS
UNDERWAY
UPCOMING
INTERIM MGT
QUEENS QUAY REVITALIZATION
Boundaries + Phasing
The interim work is designed to create safe connections between the Queens Quay Revitalization scope currently
underway between Bay and Spadina and the existing conditions to the east and west.
CENTRAL WATERFRONT (YO YO MA LANE TO BAY)
Status: Construction Underway – Will Be Complete Summer 2015
Rendering of approved design. Construction in progress.
TRANSITION ZONE (BAY TO YONGE)
Status: Complete
Rendering of approved design. Current condition – construction completed; final finishes required
INTERIM MARTIN GOODMAN TRAIL/PEDESTRIAN CONNECTION (YONGE TO JARVIS)
Status: Complete – Restorations Will Be Made After Hydro Work
Rendering of approved design. Current condition – construction completed.
INTERIM IMPROVEMENTS (JARVIS TO PARLIAMENT)
Status: Construction Underway – Will Be Complete Spring 2015
Current condition. Rendering of proposed improvements.
MARTIN GOODMAN TRAIL WEST OF SPADINA
Status: Construction Starts Late 2014
Current condition. Rendering of proposed improvements.
THE PROJECT HAS TWO PARTS:
A - Off-street Martin Goodman Trail (Yo Yo Ma Lane to Bathurst Street)
B- On-street bike lanes (Bathurst Street to Stadium Road)
Yo
Yo
Ma L
an
e
Lo
wer
Sp
ad
ina
Av
en
ue
Sta
diu
m R
oad
PART A: OFF-STREET, SOUTH SIDE MARTIN GOODMAN TRAIL
Yo Yo Ma Lane to Bathurst Street
Push curb line + catch
basin
TYPICAL CROSS SECTION
Here’s how the street has been designed to accommodate the Martin Goodman Trail
Existing condition
Work needed to
accommodate the
Martin Goodman Trail
Install
mountable curb
Relocate light pole
UNIQUE CONDITIONS
There are 4 areas worth noting – as they present unique challenges
4. Harbourfront
Marina Quay
parking lot
3. Dan Leckie
2. Harbourfront
Community centre
1. Bathurst intersection
1. BATHURST INTERSECTION
The design must work around an existing Hydro pole and retaining wall and will
include a crossing for pedestrians and cyclists
Existing retainwall
Basketball court
Buffer
zone
Existing Hydro pole
2. HARBOURFRONT COMMUNITY CENTRE - EXISTING CONDITION
2. HARBOURFRONT COMMUNITY CENTRE
Maintain the parking lay-by and create a buffer zone between it and the Martin
Goodman Trail
Lay-by
Green
Buffer
zone
MARTIN GOODMAN TRAIL WEST OF SPADINA
Dan Leckie intersection
Challenges/program
3. DAN LECKIE INTERSECTION – EXISTING CONDITION
3. DAN LECKIE INTERSECTION – EXISTING CONDITION
The design responds to the existing dockwall by proposing a cantilevered sidewalk. It
also includes a new dedicated turning lane to improve traffic flow
Dedicated turning lane N-
bound
Pedestrian crossing
Buffer
zone
Buffer
zone
Existing dockwall
Existing
traffic
controller
MARTIN GOODMAN TRAIL WEST OF SPADINA
Dan Leckie intersection
Cantilevered sidewalk – illustration from the water
4. HARBOURFRONT MARINA QUAY PARKING LOT
The design had to address the entrance to the Marina Quay Parking Lot
PART B: ON-STREET, SOUTH SIDE MARTIN GOODMAN TRAIL
Bathurst Street to Stadium Road
Bathurst to Stadium Road
The on-street bike lanes will be amalgamated and moved to the south side of the
street. They will be separated from traffic by flexi-post barriers.
Existing Martin Goodman Trail
The on-street bike lanes will connect to the Martin Goodman Trail and into