Market Participant Data Access Jan 22 2008 Stephen Kerr

9
1 Market Participant Data Access Market Participant Data Access Jan 22 2008 Stephen Kerr

description

Market Participant Data Access Jan 22 2008 Stephen Kerr. Agenda. Market Participant Data Access External Interface Specification MIS External Interface Specification. Market Participant Data Access Overview. MP’s have multiple methods to access ERCOT data - PowerPoint PPT Presentation

Transcript of Market Participant Data Access Jan 22 2008 Stephen Kerr

Page 1: Market Participant Data Access Jan 22 2008 Stephen Kerr

1 Market Participant Data Access

Market Participant Data Access

Jan 22 2008

Stephen Kerr

Page 2: Market Participant Data Access Jan 22 2008 Stephen Kerr

2 Market Participant Data Access

Agenda

• Market Participant Data Access

• External Interface Specification

• MIS External Interface Specification

Page 3: Market Participant Data Access Jan 22 2008 Stephen Kerr

3 Market Participant Data Access

Market Participant Data Access Overview

• MP’s have multiple methods to access ERCOT data – External web services for machine to machine interactions– MIS for user interaction

• The MP Data Access booklet has been updated (from April 07)– Substantially complete Nodal Data Services Master List– Substantially completed External Interface Specification– Substantially complete MIS External Interface Specification

Page 4: Market Participant Data Access Jan 22 2008 Stephen Kerr

4 Market Participant Data Access

There are three ways for machines to access ERCOT’s data

• The External Interface Specification describes all of the data services available through web services

• The second method is to retrieve extracts that are also available on the MIS through a single “getReport” web service

• The MIS External Interface Specification– Originally intended to support MIS

dashboards only– The web services are also useful for

MPs and will be exposed in exactly the same way as the External Interface Specification i.e. web services.

Page 5: Market Participant Data Access Jan 22 2008 Stephen Kerr

5 Market Participant Data Access

There are three ways for users to access ERCOT’s data

• The MIS provides users with a view of reports and extracts as well as a method for downloading the reports and extracts

• Each application displays its user interface through the MIS

• Some applications allow for upload and download of data

Page 6: Market Participant Data Access Jan 22 2008 Stephen Kerr

6 Market Participant Data Access

Reviewing and changing the data services lists

• Nodal Data Services Master List• References all interactions outside of user interfaces, including the

External Interface Specification and MIS External Interface Specification • Contain extracts, downloads, web services, real-time reports• Updated weekly and loaded to

http://nodal.ercot.com/readiness/reports/index.html• Should be reviewed for completeness and access methods

• External Interface Specification• Published for review and approval every 2 months approximately• Changes communicated through monthly TPTF reviews• http://nodal.ercot.com/docs/pd/eip/index.html#oth

• MIS External Interface Specification• Never been published for review and approval• Will be treated as the External Interface Specification• http://nodal.ercot.com/docs/pd/eip/index.html#oth

Page 7: Market Participant Data Access Jan 22 2008 Stephen Kerr

7 Market Participant Data Access

External Interface Specification

• Outage interfaces are the biggest new element in the external interface specification

• Version 1.07 in review, all received comments will be incorporated in 1.08– Key string composition for Outage mRIDs– PriceCurve multi-hour block– Explanations for OutageIdent, OutageWarning, LastModifiedby, LastModified,

versionID, groupID, OutageNotes– Difference between newSchedule and Schedule

• Currently all machine interfaces use the web. ERCOT will test machine interfaces on the WAN this year but there is no published plan yet

• We are adding an enhancement called chunking that will allow multi-day submissions

• SCED active contingency information  will be:– the contingencies that have created initial constraint violations as calculated by

EMS and as passed to the MMS.  MMS already provides us with capability (staging tables/reports) to capture these contingencies. 

– the contingencies that have been de-selected at the EMS side

Page 8: Market Participant Data Access Jan 22 2008 Stephen Kerr

8 Market Participant Data Access

MIS External Interface Specification

• Version 0.35 in review, all received comments will be included in 1.0– Frequency of update of WGRPP and frequency of access– WGRPP resource name– MIS services are additional to existing External Interfaces (sortBy, Role, Category) with different

URLs– Ancillary Service types will be made consistent between the two specifications

• Complete set of new services• Weather Data• List of Zones, Hubs, or Buses• System Control Error• Frequency• Responsive Reserve Capacity• Non-Spinning Reserve• Undeployed Reg-Up and Reg-Down• Available Capacity• Wind-Powered Generation Resource Production Potential• Short-Term Wind Power Forecast• Dynamic ratings deviation adjusted for the current temperature• Average monthly Dynamic deviation• Total ERCOT Load• Total ERCOT Generation• Total ERCOT Generation Operating Reserve• MID-MIR Get Report List• RRS Deployment Instruction for non-controllable load resources

Page 9: Market Participant Data Access Jan 22 2008 Stephen Kerr

9 Market Participant Data Access

Services defined in the External Interface Specification

• Three Part Offer• Incremental/Decremental Offers• Current Operating Plan• Output Schedule• Bid Set Acceptance• Bid Set Errors• Get mRID• System Status• Self Arranged Ancillary Services (AS)• Ancillary Services Offer• Ancillary Services Trade• DAM Energy Bid• DAM Energy Only Offer• Forecasted Load• Real-Time System Load• Market LMPs and SPPs• Mitigated Curves• Outage Creation• Congestion Revenue Rights• PTP Obligation Bid• Self Schedule• Total Regulation• Load Ratio Share• Unit Availability• Startup and Shutdown Instructions• Proxy Curves• Notices and Alerts• CRR Awards• Outage Notifications

• Capacity Trade• DC Tie Schedule• Energy Trade• Get AwardSet• Market MCPCs• Ancillary Service Schedule Obligations• Load Distribution Factors• Customer Load Profile• Energy Offer Awards• PTP Obligation Awards• Market Totals• Binding Constraints• Active Contingencies in SCED -

SCEDViolatedConstraints• Voltage Profiles• Competitive Constraints• Shift Factors• Ancillary Service System Plan• Pending Trade• Energy Only Offer Awards• Energy Bid Award• Ancillary Service Awards• Dynamic Ratings• Aggregated Ancillary Service Offer Curves• Total Ancillary Service Offers• Total DAM Energy/ total Energy• Derated CRRs• Alert Acknowledgement• Outage Query• Outage Cancellation