QUESTION 1
1
ANALYSIS OF THE Y-CALL CASE STUDY: CHANGE MANAGEMENT
TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1DATE: 21 FEBRUARY 2011
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
2/37
QUESTION 1
ANALYSIS OF THE Y-CALL CASE STUDY: CHANGE MANAGEMENT
1.1 Evaluation of Sallys role in the Y-Call Case Study
Sally Smith was appointed at Y-Call as the new Marketing Development
Manager, with a troubleshooting brief and would be reporting to Bill Walton, the
Sales and Marketing Director. Y- Call is a Call Centre business. On her arrival,
Sally was informed of the problems the business has with PJ Direct, who is one
of their clients, who fixes computers. Y-call is contracted to handle PJ Direct calls
for engineers. The PJ Direct contract was due for renewal, and due to complaintsby PJ Direct clients and dissatisfaction with the service and behaviour of Y-Call
agents, Y-Call was afraid it would loose the contract if there is nothing done
about it really quick. Moreover, Y-Call has lost a couple of contract renewals.
Sally would therefore be seen as a change agent for Y-Call to make sure that the
call centre keeps the PJ Direct contract. In the process of trying to save the
business from loosing the contract, Sally is also expected to increase
effectiveness, performance and satisfaction in Y-Call.
There is a need to analyse the following organisational factors before evaluating
Sallys role in the Y-Call call centre. These factors are:
The structure: Y-Call Management Team
2
MikeManaging Director
Daren TaylorPersonnel Manager
Tony BurrowHead of Admin &
Finance
Peggy Ramsay
Office Manager
Len HumphriesOperations Director
Bill WaltonSales & marketing
Director
Jaswinder BansalTraining manager
Sally SmithMarketing dev
Manager
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
3/37
Sally Smith is reporting to Bill Walton, but the structure does not show the
demarcation in terms of managers reporting to the directors.
Culture: lack of commitment by Senior Management, lack of
communication between managers and staff/agents, poor customer
service
Politics: Financials at Y-Call are not good with lack of development grants
coming their way. Fear of the fact that politicians might subsidise their
competitors and affect their business. Managers talking about non-
commitment of their supervisors to new staff
Human Resource: staff turnover, absenteeism and sickness, lack of
training (not a learning orghanisation), high cost of recruitment due to staff
turnover, low pay rates to agents, lack of funding for training. A need to
increase a number of agents but couldnt sustain financially.
Internal change agents are normally people who know the business very well and
have the ability, knowledge and experience of directing people for change. Sally
was faced with a difficult job ahead of her as a new appointee. To begin with, it is
important to look at the internal and external forces driving the change in Y-Call:
Internal forces
-Deficiency in existing organisation:
o Obstacles in communication
o Lack of cooperation between the line and staff
o Non commitment by some of the supervisors
- Nature of the work force:
o The employee turnover is very high and put strain on management
o The behaviour of the staff towards customers poor customerservice
- Technology:
o The introduction of a new answering system (IVR system) which
might have something to do with the declining morale.
3
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
4/37
External forces
- Competition in the Call Centre industry:
o Facing competition in their market - loosing contracts
to their competitors
o Receiving complaints from clients due to poor service
to customers
For Sally to pull it off for the Y-Call, she would need to also focus on the
following:
People: changing attitudes and behaviour of agents through
communication, decision making and problem solving. To help agents and
managers to work more efficiently and effectively together.
Technology: the new Interactive Voice Response (IVR)
machine and the work process.
Structure: She might look at how tasks are divided, grouped
and coordinated. She might also redesign jobs or work schedule.
Given the time scale with which change was required in Y-Call, a participative
strategy would be important for Sally because for an organisational change to be
successful, a change agent need to involve managers and employees as people
who will be affected by any change (might be ready or resist the change) she
would suggest, some of the people are:
- The Y-Call managers, for example, the Operations Director (Len
Humphries), who introduced the IVR system and passionate about it, that
it is doing a good job, meanwhile agents are complaining about, Tony
Burrows and Peggy Ramsay in the Admin and Finance, who are in
4
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
5/37
charge of paperclips people were complaining of poor documentation
and inaccurate invoicing, but they blame agents for it.
Managers in Y-Call needed persuading to see the urgent need for change
because they seem not to see or in denial of the problems experienced by
agents and complaints by clients.
- Agents, as the people who do the work on the ground, would be affected
by change in terms of the system they use, the work or flow processes
and information flow. Agents claim their complaints are not being listened
to by managers. Agents might loose their jobs or change might yield
positive results such as, receiving training, morale boosted and the
system being changed.
For Sally to be successful, she needed the commitment of top management,
especially Mike, the MD whose support and influence is important in the process.
The leader of the organisation is often the most effective communicator of the
importance and necessity of change to the employees. Mike was not that
involved. Billy just needed to see a breakthrough but didnt care how it happenswith not enough financial support, but he took credit for its success. Sally didnt
know how to involve managers. Sally had the support and assistance of Jas, the
Training manager with good ideas of involving the people/agents through team-
building exercises and suggestions. She finally influenced Bill to attend a
listening session with some of the agents and he was impressed and supportive.
Bills support also influenced the other managers who came up with their own
suggestions to make it work.
5
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
6/37
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
7/37
- Assess the strength of the change management team, herself in
particular.
- Assess the change sponsor, who are the top management and enable
them to effectively lead the change process.
For Sally or any change agent to effect further change in Y-Call, they need to
have enough power to impose change. As it stands, Sally does not have much
power and room to manoeuvre because of resistance from other managers and
lack of support from her boss. Y-Call has a lack the financial resources
necessary to can embark to further change.
7
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
8/37
QUESTION 2
8
A REPORT ON THE CRITICAL EVALUATION OF A PROJECT IN THEDEPARTMENT OF SCIENCE AND TECHNOLOGY
TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1
DATE: 21 FEBRUARY 2011
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
9/37
TABLE OF CONTENT
1. Introduction 10
2. Background of the IPDM Project of the Department of Science
and Technology 11
3. Project Life Cycle 11
3.1 Preparation phase 12
3.2 Planning phase 13
3.3 The Execution phase 13
3.4 Completing phase 13
3.5 Evaluating phase 14
4. Factors influencing the successful aspects of the project 14
5. Conclusion 14
6. References 15
9
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
10/37
1. Introduction
The purpose of the report is to evaluate the Integrated Planning, Development
and Modelling (IPDM) Project in the Department of Science and Technology
(DST). The focus will be on the preparation and the planning stages through to
the completing and evaluating stages.
Martin (2008) defines a project as a one-off, non-repeated activity or set of tasks,
which achieves clearly stated objectives within a time limit. Project management
helps an organisation reduce product devel9opment time to market, utilize limited
resources, handle technological complexity, respond to stakeholder satisfaction
and increase global market competition (Patanakul, Lewwongcharoen and
Milosevic, 2010:41). Project management is the use of knowledge, skills, tools,
and techniques to plan and implement activities to meet or exceed stakeholder
needs and expectations from a project.
Patanakul, Lewwongcharoen and Milosevic (2010:41) further argued that to lead
a project successfully, a project manager has to become adept at initiating,
planning, executing, monitoring and controlling and closing. To do so, project
managers typically use several tools and techniques to help them orchestrate
activities along a project life-cycle.
In evaluating the project, the report will start by giving a background of the project
and how it was conceived by the department. Secondly, the report will focus at
the IPDM life-cycle, by analysing how the project life-cycle stages were executed
or performed. Secondly, the report will look at factors that influenced the
10
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
11/37
successful aspects of the project, and thirdly, give suggestions for aspects that
could have been improved.
2. Background of the IPDM Project of the Department of Science and
Technology
During 2006, a range of interactions between the Department of Science and
Technology and the CSIR culminated in the commissioning of the CSIR Built
Environment to cooperate with other science councils and institutions of higher
learning to develop what can be defined as an early stage or highly cross-
sectoral, generic technology or knowledge patform to support integrated
planning, development and service delivery in South Africa.
The project was conceptualised as a multi-year, phased initiative, with the intent
to demonstrate to line departments the value and importance of conducting more
in-depth, longer-term research in tackling the problem of service delivery. The
project under discussion was the phase 2 of the project. Phase 1 of the project
was mainly on the research part, which was the build-up of the project.
3. Project Life Cycle
According to Patanakul, Lewwongcharoen and Milosevic (2010: 45), the project
life cycle typically passes through stages or phases where extra control is
needed to effectively manage the completion of a major deliverable, such as
preparation or conceptual phase, planning phase, execution phase,
delivery/closure and evaluation. The project life cycle provides the basic
framework for managing the projects. In Block 4, Session 2, we learn that as
each project is different, so each life cycle varies also. For the purpose of the
11
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
12/37
report, I will focus on the preparation phase, planning phase to the completing
and evaluation phase.
3.1 Preparation phase
In the preparation phase, the DST and the project team defined the scope of the
project which clearly states the objectives and deliverables, milestones technical
requirements. The DST as the funding department had a monitoring role on the
project. The Project Team comprised of the CSIR and the HSRC who
collaborated with other science councils and institutions of higher learning to
develop the information platform to support integrated planning, development
and service delivery in South Africa.
Phase 2 of the IPDM project, which includes the further development of the
Toolkit for Integrated Planning, had as its key objectives. In realising the
objectives of the project, six project streams were identified by the projects team.
Each project stream comprises a number of project components. These projectstreams with their associated project components and responsibilities are
illustrated in Annexure 1 (Overview of the Project Concept) with the lead agency
for each project stream. It should be noted that from the preparation phase the
Department of Social Development (DSD) showed its interest to participate in the
project, but later backed out hence the DSD project stream and funding. As a
result of the DSD backing down, the project team had to revise the project
streams.
The project team consisted of members from both the CSIR and the HSRC. The
project stakeholders were identified as follows: The DST, the HSRC, the CSIR,
Municipalities, Higher Education institutions, Business, and government
departments.
12
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
13/37
The preparation phase was a success and well planned.
3.2 Planning phase
The planning phase is important since the foundation and backbone of the
project will depend on it. In the planning phase a network plan needed to be
constructed. The network shows the project activities that must be completed,
the steps and the times for the activities to start and finish along the path through
the network. The Planned start date of the project was 1 December 2008 and the
project concluded in December 2009, which implied duration of 16 months. The
overall project programming and project schedule are attached as Annexure 2
and 3. The planning phase culminated in the submission of a concept document.
3.3 The Execution phase
In the execution phase, the IPDM project team scheduled project meetings withthe DST to keep the project on track. A meeting schedule is shown figure 1. The
team communicated regularly with stakeholders and made presentations on the
project to stakeholders such as the Municipalities, universities, government
departments when required. The project time status was monitored successfully.
Appropriate action was taken when the project scope statement shown that the
project has some problems. Deviations from the project scope were noted and
the project schedule revised. Because the project had two components, led by
the CSIR and the HSRC respectively, there were deviations or delays from time
to time. These delays delayed the progress and it indicated the lack of effective
planning, monitoring and control.
3.4 Completing phase
13
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
14/37
Block 4, Session 6, p 101 indicates that the closing stages of the project need as
much, if not more attention as the early stages because performance may drift
unnoticed into a spiral if this part of the project is not managed as carefully as
other stages. In the completion phase of the IPDM project, the project
management team came together to plan for the closure of the project. The team
evaluated their performance and planned a closed-out report which showed all
the deliverables and the achievements to be submitted to the DST. The
achievements were also listed in the close-out report.
3.5 Evaluating phase
Martin (2008) states that judging the woth of a project can be a continual
process. It may take place before a project proposal is accepted, during the
progress of a project, at completion and sometime afterward, and the final
evaluation will consider whether the project achieved what was intended, and this
may not be evident for some time. The success of the IPDM project will take time
before it could be realized since the project institutionalization home is still being
finalised and the municipalities are learning how to use the information platform.
4. Factors influencing the successful aspects of the project
The following are seen to be the important aspects to the management of
projects. For any project to be successful there has to be good project manager
to provide leadership and bring together different teams to work towards common
goals. In addition to being able to manage people and budgets the project
manager must be able to
Identify potential risks and develop back up plan
Effectively communicate with all stakeholders
Ensure quality that meets the expectations of stakeholders
14
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
15/37
5. Conclusion
For a project to be successful, the above success factors should be practiced
and planning to take place during the lif cycle of the project.
6. References
Martin, V. 2008. Planning the Project: study guide for MBA B713. Milton-Keynes:
Open University
Patanakul, P., Lewwongcharoen, B., and Milosevic, D. 2010. An empirical study
on the use of project management tools and techniques across project life-cycles
and their impact on project success. Journal of General Management, Vol. 35
(3).
The Open University (2008) B713 Fundamentals of Senior Management, Block
4, The Open University.
DST, 2008. Integrated Planning, Development and Modelling Project: Phase 2:
Draft Composite Proposal. Pretoria.
DST, 2009. Toolkit for Integrated Planning: Project Close-Out Report. Pretoria
15
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
16/37
Figure 1: Meeting schedule
Milestones/Deliverables Dates
Project Steering Committee Meetings
2 Apr 2009
23 Jun 2009
16 Nov 2009
1 Feb 2010
30 Apr 2010
30 July 2010
30 Oct 2010
30 Jan 2011
28 Feb 2011
Technical Co-ordinating Committee Meetings 30 May 2009
9 June 2009
1 Oct 2009
30 Nov 2009
1 Feb 2010
15 Mar 2010
15 July 2010
15 Sep 2010
16
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
17/37
QUESTION 3
17
A REPORT ON THE EVALUATION OF A CHANGE PROCESS IN THEDEPARTMENT OF SCIENCE AND TECHNOLOGY
TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1DATE: 21 FEBRUARY 2011
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
18/37
TABLE OF CONTENT
1. Introduction 19
2. Section A: Description and analyses of a change process in the
DST 19
2.1 The DST approach to change 20
2.2 The DST change process 20
2.2.1 Phase 1: Realising the need for change 21
2.2.2 Phase 2: Planning the change 21
2.2.3 Implementing the change 22
2.2.4 Sustaining the change 22
3. Section B: Ways in which the change process could have been
improved in DST 22
4. Conclusion 23
5. References 24
18
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
19/37
1. Introduction
Organizational change occurs when an organization restructures resources to
increase the ability to create value and improve effectiveness. In Block 4,
Session 8, p 47 we learn that any major change initiative in an organisation is
likely to mean changes in what it is like, changes in the ways in which people
work, and changes in the ways in which it does things.
Reasons for choosing a particular kind of change initiative relates to factors such
as a desire to improve efficiency and/or profitability, the implementation of a shift
in strategic direction, and a response to increased competitive pressures.
The report will take the following format: Section A will describe and analyse a
change process undertaken by the Department of Science and Technology
(DST) in the restructuring of Programmes in an attempt to operate more
efficiently. Section B will look at ways if any, in which the undertaken change
process could have been improved.
2. Section A: Description and analyses of a change process at DST
Sturges (2008), identified three different approaches to change, such as
organisational approaches, people approaches and process approaches. Firstly,
organisational approaches to change focus on changing what the organisation is
like. Examples of types of organisational change are; restructuring and culture
change. Secondly, people approaches to change focus on changing the ways in
which people work. Examples of the types of people approach are, the
emergence of HRM and the new patterns of working. Lastly, the process
approach to change aim to transform the ways in which organisations do things,
that is, improve the processes that they employ to conduct their business,
examples are business process re-engineering and knowledge management
19
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
20/37
2.1 The DST approach to change
.According to Recklies (2001) change is the continuous adoption of corpoprate
strategie and structure to changing external conditions. Change in the life of an
organisation is unavoidable and there are many forces which make the changes
not only desirable but also inevitable such as technological, economic, political,
social, legal, international and labour market environment. Sturges (2008)
mentioned that the types of change made by organisations in response to
globalization, technological advances and increased competition have been to
restructure themselves in an attempt to operate more efficiently.
The DST has responded similarly in order to improve their performance as they
have come under pressure to do so. The major force behind the change was
political, due to the Departments separation from the then Arts and Culture,
Science and Technology Department, and the appointment of the new Minister
and the Director-General. The DST structure has always had five Programmes
since its separation from the Department of Arts and Culture, Science andTechnology in 2003. Late in 2004, the DST planned to restructure the
department to improve its effectiveness and performance in achieving its
objectives.
The discussion below will describe and analyse the change process followed.
2.2 The DST change process
The purpose of restructuring in DST was to introduce a new Programme called
Science and Technology Expert Services (SciTEs) . The new programme was to
house all the scientists scattered in the five DST Programmes. The main purpose
for the change was to have all science and technology experts in one programme
20
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
21/37
for a coordinated and easy access to their services. The experts will handle only
work related to their expertise. The Programme was to work like self-managed
teams with a coordinator, the Deputy Director-General. In analysing the change
process at DST, Erwin (2009) change process will be used.
2.2.1 Phase 1: Realising the need for change
The Director-General (DG) realized the need for change as a result of lack of
coordination of efforts and work from the five Programmes at DST. The DG as
the head of the Department and the champion of change for organisational
change, met together with senior management, and the decision for change was
taken in one of the Executive Committee (EXCO) meetings. Only the DG and the
Top managers attend these meetings. The intention for change was
communicated only to the affected managers (experts) who will be relocated to a
new Programme as well as the Chief Directors under whom they report.
Reaction to the message: Some of the affected managers did not think the
message was good news because it would not make any difference as to where
they are located. The unaffected staff was also not happy after hearing the newsfrom the grapevine since they would also be affected by the planned change.
The staff meeting was called by senior management to explain the plan and how
it will unfold.
2.2.2 Phase 2: Planning the change
Senior management continued to meet to develop a plan as to what needed to
be done, when, where and how. Senior managers struggled to explain to the
managers the importance and the difference it will make as the managers
continued to ask questions in their struggle to understand the reason behind it all
and what difference it would make. The issue was discussed by senior
management every Monday in EXCO meetings. Relevant information was
21
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
22/37
gathered at this phase regarding the proposed change, putting together a plan as
to what is to be done. Managers were not thoroughly involved in this phase, only
senior managers.
2.2.3 Implementing the change
Once the senior management was able to establish favourable conditions and
the right channels of communication then the plan was put into action. The
management called a briefing session to announce the date of implementation
and how the change will affect all the programmes and the department as a
whole. In the implementation phase, each Programme had to release all the
affected managers to the new Programme. The Department had planned to put
the experts together in one physical place, working together under the SciTEs
Deputy Director-General. The managers in SciTEs were now being challenged
and held accountable for new levels of performance. These managers no longer
had sub-ordinates to support them, hence they struggled in handling their admin
work.
2.2.4 Sustaining the change
This phase involves continuing to improve and sustaining the change as well as
evaluating the change. After two years, senior management saw no difference in
the working and performance of the new programme.
3. Section B: Ways in which the change process could have been
improved in DST
For the change process to be successful, the following key elements should have
been considered:
- The department should have in the first phase developed motivation by
providing disconfirming data that showed the need for change, the gaps
22
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
23/37
between the existing and desired change. The DST needed to have open
discussion of issues and establishing common grounds, and redefining
responsibilities. Providing support and continuing to communicate
priorities and new responsibilities.
- Employees perspectives needed to be restructured to align them with the
new vision.
- Managers should have been involved throughout the change process to
contribute with ideas to the change process.
- The DST needed to evaluate new information about the impact of the
change. Kotter (1995, 1996) cited by Erwin (2009), suggested that
implementing change involves empowering other to act, removing
obstacles, creating short-term wins and institutionalizing new approaches.
- To sustain the change, the new ways of thinking about change should
become part of the culture.
4. Conclusion
Any organizational change attempts make employees change their behaviour
and unless the behavioural patterns of the members change the change will havea little impact on the effectiveness of the organization. From the above
discussion on the change process, it is maintained that successful change
management requires the involvement of managers and employees throughout
the organisation to provide ideas for improvements and expertise needed to
implement change. .
23
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
24/37
5. References
Erwin, D. 2009. Changing Organisational Performance: Examining the Change
Process. PhD. Rush University. Chicago
Recklies, O. 2001. Managing Change: Definition and Phases in Change
Processes.[Online]. Recklies Management project GmbH.
Available from: http://www.themanager.org/strategy/change_phases.htm
[Accessed on 20 February 2011]
Sturges, J. 2008. Employee Involvement and Empowerment: study guide for
MBA B713. Milton-Keynes: Open University
The Open University (2007) B713 Fundamentals of Senior Management, Block
4, The Open University.
24
http://www.themanager.org/strategy/change_phases.htmhttp://www.themanager.org/strategy/change_phases.htm -
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
25/37
ANNEXURE 1 1
25
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
26/37
ANNEXURE 2
26
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
27/37
TIP Phase 1b - Budget Breakdown in relation to Project Duration
NrProject
Component
17November
Cost InRand
IncludingVAT
Start Date End date31-Jan-
09R
31-Mar-09R
30-Jun-09R
30-Sep-09R
31-Dec-09R
31-MarR
30-Jun-10
30-Sep-10
R
ConToRa
ProjectManagement
R1,445,000.
00
01 Nov2008
30 Sept2010
438,750.00
143,750.00
143,750.00
143,750.00
143,750.00
143,750.00
143,750.00
143,750.00
1,4
PM 1 Projectinceptionprocess
R295,000.00
01 Nov2008
31 Jan2008
295,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
295
PM 2 Overallprojectmanagement andco-ordinationacrossagencies
R270,000.00
01 Nov2008
30 Sept2010
33,750.00
33,750.00
33,750.00
33,750.00
33,750.00
33,750.00
33,750.00
33,750.00
270
PM 3 Technicalprojectmanagement, co-ordination&
internationalbenchmarking
R500,000.00
01 Nov2008
30Sept2010
62,500.00
62,500.00
62,500.00
62,500.00
62,500.00
62,500.00
62,500.00
62,500.00
500
PM 4 Travel andsubsistance
R250,000.00
01 Nov2008
30 Sept2010
31,250.00
31,250.00
31,250.00
31,250.00
31,250.00
31,250.00
31,250.00
31,250.00
250
PM 5 Runningandincidentalexpensesincludingprogressworkshopsandmeetingsof the
R130,000.00
01 Nov2008
30 Sept2010
16,250.00
16,250.00
16,250.00
16,250.00
16,250.00
16,250.00
16,250.00
16,250.00
130
27
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
28/37
projectteam
InstitutionalSustainability
PlanR
550,000.00
01 Nov2008
30 Sept2010
137,500.00
137,500.00
137,500.00
137,500.00 0.00 0.00 0.00 0.00
550
ISP 1 Formaliseanagreemen
t on anappropriate andsustainableinstitutional homefor the TIPplatformand anappropriate technical"host" forthe TIPportal.
R100,000.00
01 Nov2008
30 Sept2009
25,000.00
25,000.00
25,000.00
25,000.00 0.00 0.00 0.00 0.00
100
ISP 2 Formalisebi-lateralagreements aroundthe uptakeand
application of TIP. R200,000.00
01 Nov2008
30 Sept2009
50,000.00 50,000.00 50,000.00 50,000.00 0.00 0.00 0.00 0.00 200
ISP 3 ConceptDocumenton Geo-SpatialCentre ofCompetence
R250,000.00
01 Nov2008
30 Sept2009
62,500.00
62,500.00
62,500.00
62,500.00 0.00 0.00 0.00 0.00
250
Profiler andSimulator(Technical
enhancement,development
and validation)
R9,350,000.
00
01 Dec2008
30 June2010
360,000.00
750,000.00
1,020,000.00
1,740,000.00
1,840,000.00
1,840,000.00
1,750,000.00
50,000.00
9,3
28
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
29/37
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
30/37
for thesettlementtypologies
LivingLaboratories
R4,000,000.
00
01 Jan2009
30 June2010
200,000.00
466,666.66
666,666.67
666,666.67
666,666.67
666,666.67
666,666.67 0.00
3,9
LL 1 CityRegionLiving
Laboratories in 4CityRegions
R2,000,000.0
0
01 Jan
2009
30 June
2010
100,000.00
233,333.33
333,333.33
333,333.33
333,333.33
333,333.33
333,333.33 0.00
2,0
LL 2 DistrictLivingLaboratories in 4districts
R2,000,000.0
0
01 Jan2009
30 June2010
100,000.00
233,333.33
333,333.33
333,333.33
333,333.33
333,333.33
333,333.33 R 0.00
2,0
CapacityBuilding
R5,055,000.
00
01November2008
01 August2010
500,000.00
807,500.00
882,500.00
757,500.00
450,000.00
450,000.00
757,500.00
450,000.00
5,0
CB 1 Dissemination of theprojectandlinkages tothe portal.(articles,brochures,web-links)
R100,000.00
01 Nov2008
01 Aug2010
12,500.00
12,500.00
12,500.00
12,500.00
12,500.00
12,500.00
12,500.00
12,500.00
100
CB 2 Four (3day) shortcourses onthe ToolkitforIntegratedPlanning(TIP) insupport ofintegratedplanninganddevelopment.
R1,230,000.0
0
01 April2010
30 June2010
0.00307,500.
00307,500.
00307,500.
00 0.00 R 0.00307,500.
00 0.001,2
CB 3 Onenationalseminar
R125,000.00
15 June2009
R 0.00 R 0.00
R125,000.
00 R 0.00 R 0.00 R 0.00 R 0.00 R 0.00125
30
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
31/37
CB 4 Phase 1presentations toprofessionalinstitutions, interestgroups,clustersandprovinces
R100,000.00
01 Nov2009
31 Jan2009
50,000.00
50,000.00 0.00 0.00 0.00 0.00 0.00 0.00
100
CB 5 Studentships in 4 cityregionsand 4districts(Allowances)
R2,400,000.0
0
01 Nov2008
01 Aug2010
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
300,000.00
2,4
CB 6 CSIRIntegratedDevelopmentPlanningInternshipProgramme
R1,100,000.0
0
01 Nov2008
01 Aug2010
137,500.00
137,500.00
137,500.00
137,500.00
137,500.00
137,500.00
137,500.00
137,500.00
1,1
31-Jan-09 31-Mar-09 30-Jun-09 30-Sep-09 31-Dec-09 31-Mar 30-Jun-10 30-Sep-10 Control Total Ran
Total
R
1,636,250.00
R
3,805,416.66
R
4,350,416.67 R 4,945,416.67
R
4,600,416.67 R 3,100,416.67
R
3,317,916.67 R 643,750.00 R 26,399,901-Mar-09 01-Mar-10 01-Sep-10
R5,441,666.66
R16,996,666.67 R 3,961,666.67
R 26,399,9
31
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
32/37
32
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
33/37
ANNEXURE 3
Overall Project Programming
The project is envisaged to unfold over the 2008/2009 and 2009/2010 financial years. The plannedstart date is 1 September 2008 and the project will conclude on 31 December 2009, which implies a
planned duration of 16 months for IPDM Phase 2. The detailed timelines for the individual projectcomponent will be planned during the project inception phase.
(PM) Project Management Estimated
Timeframe
PM1 Project inception process. September 2008
PM2 Overall project management and co-ordination across
agencies
Ongoing
PM3 Technical project management and co-ordination Ongoing
PM4 Travel and subsistance for project meetingsand
workshops
Ongoing
PM5 Running and incidental expenses including progress
workshops and meetings of the project team
Ongoing
(I) Institutionalisation Estimated
Timeframe
I1 Formalise an agreement on an appropriate and
sustainable institutional home for the TIP platform and an
appropriate technical "host" for the TIP portal.
September 2008 to
November 2008
I2 Formalise bi-lateral agreements around the uptake and
application of TIP.
September 2008 to
March 2009I3 Concept Document on Geo-Spatial Centre of
Competence March 2009
(TD) National Roll Out, Technical Enhancement and
SimulationEstimated
Timeframe
TD1 Portal customisation for national roll out January 2009 to
March 2009
TD2 National roll-out of the regional profiler. January 2009 to June
2009
TD3 National roll-out of city region simulator in 4 city regions March 2009 toNovember 2009
DSD1and
DSD3
DSD Population Module - Collaborative UserSpecification, Interface Customisation, TIP Integration
and Training of Trainers.
September 2008 to
December 2008
(WC) Wall Chart Enhancement and Extension and Policy
ApplicationEstimated
Timeframe
WC1 Wall Chart Content Enhancement: Extension &
validation of settlement types to extend to national
coverage
September 2008 to
May 2009
33
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
34/37
WC2 Develop Transport Demand Estimates per Settlement
Typology Simulate alternative transport responses for thesettlement typologies
September 2008 to
May 2009
DSD2 DSD Population Module - Collation and verification of
population and information and projections for 2014 November 2008 toFebruary 2009
(LL) Living Laboratories for Collaborative Technology
Development
Estimated
Timeframe
TT1 City-region living laboratories in 4 city-regions November 2008 toNovember 2009
TT2 District living laboratories in 3 districts November 2008 to
November 2009
(TT) Dissemination, Technology Transfer and Up-Take Estimated
Timeframe
TT1 Dissemination of the project and linkages to the portal.Ongoing
TT2 Three (3 day) short courses on the Toolkit for Integrated
Planning (TIP) in support of integrated planning anddevelopment.
March 2009 toNovember 2009
TT3 Roadshow of 4 TIP Launch Seminars September to
October 2008
TT4 Phase 1 presentations to professional institutions, interest
groups, clusters and provinces
September 2008 to
December 2009
TT5 CSIR Integrated Development Planning Internship
Programme
Sept 2008 to Dec
2009
These timelines are only indicative and will be refined on the basis of input from DST during the
project inception phase.
34
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
35/37
35
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
36/37
36
-
8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU
37/37