    QUESTION 1

    1

    ANALYSIS OF THE Y-CALL CASE STUDY: CHANGE MANAGEMENT

    TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1DATE: 21 FEBRUARY 2011

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    2/37

    QUESTION 1

    ANALYSIS OF THE Y-CALL CASE STUDY: CHANGE MANAGEMENT

    1.1 Evaluation of Sallys role in the Y-Call Case Study

    Sally Smith was appointed at Y-Call as the new Marketing Development

    Manager, with a troubleshooting brief and would be reporting to Bill Walton, the

    Sales and Marketing Director. Y- Call is a Call Centre business. On her arrival,

    Sally was informed of the problems the business has with PJ Direct, who is one

    of their clients, who fixes computers. Y-call is contracted to handle PJ Direct calls

    for engineers. The PJ Direct contract was due for renewal, and due to complaintsby PJ Direct clients and dissatisfaction with the service and behaviour of Y-Call

    agents, Y-Call was afraid it would loose the contract if there is nothing done

    about it really quick. Moreover, Y-Call has lost a couple of contract renewals.

    Sally would therefore be seen as a change agent for Y-Call to make sure that the

    call centre keeps the PJ Direct contract. In the process of trying to save the

    business from loosing the contract, Sally is also expected to increase

    effectiveness, performance and satisfaction in Y-Call.

    There is a need to analyse the following organisational factors before evaluating

    Sallys role in the Y-Call call centre. These factors are:

    The structure: Y-Call Management Team

    2

    MikeManaging Director

    Daren TaylorPersonnel Manager

    Tony BurrowHead of Admin &

    Finance

    Peggy Ramsay

    Office Manager

    Len HumphriesOperations Director

    Bill WaltonSales & marketing

    Director

    Jaswinder BansalTraining manager

    Sally SmithMarketing dev

    Manager

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    3/37

    Sally Smith is reporting to Bill Walton, but the structure does not show the

    demarcation in terms of managers reporting to the directors.

    Culture: lack of commitment by Senior Management, lack of

    communication between managers and staff/agents, poor customer

    service

    Politics: Financials at Y-Call are not good with lack of development grants

    coming their way. Fear of the fact that politicians might subsidise their

    competitors and affect their business. Managers talking about non-

    commitment of their supervisors to new staff

    Human Resource: staff turnover, absenteeism and sickness, lack of

    training (not a learning orghanisation), high cost of recruitment due to staff

    turnover, low pay rates to agents, lack of funding for training. A need to

    increase a number of agents but couldnt sustain financially.

    Internal change agents are normally people who know the business very well and

    have the ability, knowledge and experience of directing people for change. Sally

    was faced with a difficult job ahead of her as a new appointee. To begin with, it is

    important to look at the internal and external forces driving the change in Y-Call:

    Internal forces

    -Deficiency in existing organisation:

    o Obstacles in communication

    o Lack of cooperation between the line and staff

    o Non commitment by some of the supervisors

    - Nature of the work force:

    o The employee turnover is very high and put strain on management

    o The behaviour of the staff towards customers poor customerservice

    - Technology:

    o The introduction of a new answering system (IVR system) which

    might have something to do with the declining morale.

    3

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    4/37

    External forces

    - Competition in the Call Centre industry:

    o Facing competition in their market - loosing contracts

    to their competitors

    o Receiving complaints from clients due to poor service

    to customers

    For Sally to pull it off for the Y-Call, she would need to also focus on the

    following:

    People: changing attitudes and behaviour of agents through

    communication, decision making and problem solving. To help agents and

    managers to work more efficiently and effectively together.

    Technology: the new Interactive Voice Response (IVR)

    machine and the work process.

    Structure: She might look at how tasks are divided, grouped

    and coordinated. She might also redesign jobs or work schedule.

    Given the time scale with which change was required in Y-Call, a participative

    strategy would be important for Sally because for an organisational change to be

    successful, a change agent need to involve managers and employees as people

    who will be affected by any change (might be ready or resist the change) she

    would suggest, some of the people are:

    - The Y-Call managers, for example, the Operations Director (Len

    Humphries), who introduced the IVR system and passionate about it, that

    it is doing a good job, meanwhile agents are complaining about, Tony

    Burrows and Peggy Ramsay in the Admin and Finance, who are in

    4

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    5/37

    charge of paperclips people were complaining of poor documentation

    and inaccurate invoicing, but they blame agents for it.

    Managers in Y-Call needed persuading to see the urgent need for change

    because they seem not to see or in denial of the problems experienced by

    agents and complaints by clients.

    - Agents, as the people who do the work on the ground, would be affected

    by change in terms of the system they use, the work or flow processes

    and information flow. Agents claim their complaints are not being listened

    to by managers. Agents might loose their jobs or change might yield

    positive results such as, receiving training, morale boosted and the

    system being changed.

    For Sally to be successful, she needed the commitment of top management,

    especially Mike, the MD whose support and influence is important in the process.

    The leader of the organisation is often the most effective communicator of the

    importance and necessity of change to the employees. Mike was not that

    involved. Billy just needed to see a breakthrough but didnt care how it happenswith not enough financial support, but he took credit for its success. Sally didnt

    know how to involve managers. Sally had the support and assistance of Jas, the

    Training manager with good ideas of involving the people/agents through team-

    building exercises and suggestions. She finally influenced Bill to attend a

    listening session with some of the agents and he was impressed and supportive.

    Bills support also influenced the other managers who came up with their own

    suggestions to make it work.

    5

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    6/37

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    7/37

    - Assess the strength of the change management team, herself in

    particular.

    - Assess the change sponsor, who are the top management and enable

    them to effectively lead the change process.

    For Sally or any change agent to effect further change in Y-Call, they need to

    have enough power to impose change. As it stands, Sally does not have much

    power and room to manoeuvre because of resistance from other managers and

    lack of support from her boss. Y-Call has a lack the financial resources

    necessary to can embark to further change.

    7

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    8/37

    QUESTION 2

    8

    A REPORT ON THE CRITICAL EVALUATION OF A PROJECT IN THEDEPARTMENT OF SCIENCE AND TECHNOLOGY

    TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1

    DATE: 21 FEBRUARY 2011

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    9/37

    TABLE OF CONTENT

    1. Introduction 10

    2. Background of the IPDM Project of the Department of Science

    and Technology 11

    3. Project Life Cycle 11

    3.1 Preparation phase 12

    3.2 Planning phase 13

    3.3 The Execution phase 13

    3.4 Completing phase 13

    3.5 Evaluating phase 14

    4. Factors influencing the successful aspects of the project 14

    5. Conclusion 14

    6. References 15

    9

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    10/37

    1. Introduction

    The purpose of the report is to evaluate the Integrated Planning, Development

    and Modelling (IPDM) Project in the Department of Science and Technology

    (DST). The focus will be on the preparation and the planning stages through to

    the completing and evaluating stages.

    Martin (2008) defines a project as a one-off, non-repeated activity or set of tasks,

    which achieves clearly stated objectives within a time limit. Project management

    helps an organisation reduce product devel9opment time to market, utilize limited

    resources, handle technological complexity, respond to stakeholder satisfaction

    and increase global market competition (Patanakul, Lewwongcharoen and

    Milosevic, 2010:41). Project management is the use of knowledge, skills, tools,

    and techniques to plan and implement activities to meet or exceed stakeholder

    needs and expectations from a project.

    Patanakul, Lewwongcharoen and Milosevic (2010:41) further argued that to lead

    a project successfully, a project manager has to become adept at initiating,

    planning, executing, monitoring and controlling and closing. To do so, project

    managers typically use several tools and techniques to help them orchestrate

    activities along a project life-cycle.

    In evaluating the project, the report will start by giving a background of the project

    and how it was conceived by the department. Secondly, the report will focus at

    the IPDM life-cycle, by analysing how the project life-cycle stages were executed

    or performed. Secondly, the report will look at factors that influenced the

    10

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    11/37

    successful aspects of the project, and thirdly, give suggestions for aspects that

    could have been improved.

    2. Background of the IPDM Project of the Department of Science and

    Technology

    During 2006, a range of interactions between the Department of Science and

    Technology and the CSIR culminated in the commissioning of the CSIR Built

    Environment to cooperate with other science councils and institutions of higher

    learning to develop what can be defined as an early stage or highly cross-

    sectoral, generic technology or knowledge patform to support integrated

    planning, development and service delivery in South Africa.

    The project was conceptualised as a multi-year, phased initiative, with the intent

    to demonstrate to line departments the value and importance of conducting more

    in-depth, longer-term research in tackling the problem of service delivery. The

    project under discussion was the phase 2 of the project. Phase 1 of the project

    was mainly on the research part, which was the build-up of the project.

    3. Project Life Cycle

    According to Patanakul, Lewwongcharoen and Milosevic (2010: 45), the project

    life cycle typically passes through stages or phases where extra control is

    needed to effectively manage the completion of a major deliverable, such as

    preparation or conceptual phase, planning phase, execution phase,

    delivery/closure and evaluation. The project life cycle provides the basic

    framework for managing the projects. In Block 4, Session 2, we learn that as

    each project is different, so each life cycle varies also. For the purpose of the

    11

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    12/37

    report, I will focus on the preparation phase, planning phase to the completing

    and evaluation phase.

    3.1 Preparation phase

    In the preparation phase, the DST and the project team defined the scope of the

    project which clearly states the objectives and deliverables, milestones technical

    requirements. The DST as the funding department had a monitoring role on the

    project. The Project Team comprised of the CSIR and the HSRC who

    collaborated with other science councils and institutions of higher learning to

    develop the information platform to support integrated planning, development

    and service delivery in South Africa.

    Phase 2 of the IPDM project, which includes the further development of the

    Toolkit for Integrated Planning, had as its key objectives. In realising the

    objectives of the project, six project streams were identified by the projects team.

    Each project stream comprises a number of project components. These projectstreams with their associated project components and responsibilities are

    illustrated in Annexure 1 (Overview of the Project Concept) with the lead agency

    for each project stream. It should be noted that from the preparation phase the

    Department of Social Development (DSD) showed its interest to participate in the

    project, but later backed out hence the DSD project stream and funding. As a

    result of the DSD backing down, the project team had to revise the project

    streams.

    The project team consisted of members from both the CSIR and the HSRC. The

    project stakeholders were identified as follows: The DST, the HSRC, the CSIR,

    Municipalities, Higher Education institutions, Business, and government

    departments.

    12

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    13/37

    The preparation phase was a success and well planned.

    3.2 Planning phase

    The planning phase is important since the foundation and backbone of the

    project will depend on it. In the planning phase a network plan needed to be

    constructed. The network shows the project activities that must be completed,

    the steps and the times for the activities to start and finish along the path through

    the network. The Planned start date of the project was 1 December 2008 and the

    project concluded in December 2009, which implied duration of 16 months. The

    overall project programming and project schedule are attached as Annexure 2

    and 3. The planning phase culminated in the submission of a concept document.

    3.3 The Execution phase

    In the execution phase, the IPDM project team scheduled project meetings withthe DST to keep the project on track. A meeting schedule is shown figure 1. The

    team communicated regularly with stakeholders and made presentations on the

    project to stakeholders such as the Municipalities, universities, government

    departments when required. The project time status was monitored successfully.

    Appropriate action was taken when the project scope statement shown that the

    project has some problems. Deviations from the project scope were noted and

    the project schedule revised. Because the project had two components, led by

    the CSIR and the HSRC respectively, there were deviations or delays from time

    to time. These delays delayed the progress and it indicated the lack of effective

    planning, monitoring and control.

    3.4 Completing phase

    13

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    14/37

    Block 4, Session 6, p 101 indicates that the closing stages of the project need as

    much, if not more attention as the early stages because performance may drift

    unnoticed into a spiral if this part of the project is not managed as carefully as

    other stages. In the completion phase of the IPDM project, the project

    management team came together to plan for the closure of the project. The team

    evaluated their performance and planned a closed-out report which showed all

    the deliverables and the achievements to be submitted to the DST. The

    achievements were also listed in the close-out report.

    3.5 Evaluating phase

    Martin (2008) states that judging the woth of a project can be a continual

    process. It may take place before a project proposal is accepted, during the

    progress of a project, at completion and sometime afterward, and the final

    evaluation will consider whether the project achieved what was intended, and this

    may not be evident for some time. The success of the IPDM project will take time

    before it could be realized since the project institutionalization home is still being

    finalised and the municipalities are learning how to use the information platform.

    4. Factors influencing the successful aspects of the project

    The following are seen to be the important aspects to the management of

    projects. For any project to be successful there has to be good project manager

    to provide leadership and bring together different teams to work towards common

    goals. In addition to being able to manage people and budgets the project

    manager must be able to

    Identify potential risks and develop back up plan

    Effectively communicate with all stakeholders

    Ensure quality that meets the expectations of stakeholders

    14

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    15/37

    5. Conclusion

    For a project to be successful, the above success factors should be practiced

    and planning to take place during the lif cycle of the project.

    6. References

    Martin, V. 2008. Planning the Project: study guide for MBA B713. Milton-Keynes:

    Open University

    Patanakul, P., Lewwongcharoen, B., and Milosevic, D. 2010. An empirical study

    on the use of project management tools and techniques across project life-cycles

    and their impact on project success. Journal of General Management, Vol. 35

    (3).

    The Open University (2008) B713 Fundamentals of Senior Management, Block

    4, The Open University.

    DST, 2008. Integrated Planning, Development and Modelling Project: Phase 2:

    Draft Composite Proposal. Pretoria.

    DST, 2009. Toolkit for Integrated Planning: Project Close-Out Report. Pretoria

    15

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    16/37

    Figure 1: Meeting schedule

    Milestones/Deliverables Dates

    Project Steering Committee Meetings

    2 Apr 2009

    23 Jun 2009

    16 Nov 2009

    1 Feb 2010

    30 Apr 2010

    30 July 2010

    30 Oct 2010

    30 Jan 2011

    28 Feb 2011

    Technical Co-ordinating Committee Meetings 30 May 2009

    9 June 2009

    1 Oct 2009

    30 Nov 2009

    1 Feb 2010

    15 Mar 2010

    15 July 2010

    15 Sep 2010

    16

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    17/37

    QUESTION 3

    17

    A REPORT ON THE EVALUATION OF A CHANGE PROCESS IN THEDEPARTMENT OF SCIENCE AND TECHNOLOGY

    TO: ADRIAAN JOOSTEFROM: MATDA ANNAH NYALUNGUSTUDENT NUMBER: 72714948COURSE: MBA5914ASSIGNMENT 1DATE: 21 FEBRUARY 2011

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    18/37

    TABLE OF CONTENT

    1. Introduction 19

    2. Section A: Description and analyses of a change process in the

    DST 19

    2.1 The DST approach to change 20

    2.2 The DST change process 20

    2.2.1 Phase 1: Realising the need for change 21

    2.2.2 Phase 2: Planning the change 21

    2.2.3 Implementing the change 22

    2.2.4 Sustaining the change 22

    3. Section B: Ways in which the change process could have been

    improved in DST 22

    4. Conclusion 23

    5. References 24

    18

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    19/37

    1. Introduction

    Organizational change occurs when an organization restructures resources to

    increase the ability to create value and improve effectiveness. In Block 4,

    Session 8, p 47 we learn that any major change initiative in an organisation is

    likely to mean changes in what it is like, changes in the ways in which people

    work, and changes in the ways in which it does things.

    Reasons for choosing a particular kind of change initiative relates to factors such

    as a desire to improve efficiency and/or profitability, the implementation of a shift

    in strategic direction, and a response to increased competitive pressures.

    The report will take the following format: Section A will describe and analyse a

    change process undertaken by the Department of Science and Technology

    (DST) in the restructuring of Programmes in an attempt to operate more

    efficiently. Section B will look at ways if any, in which the undertaken change

    process could have been improved.

    2. Section A: Description and analyses of a change process at DST

    Sturges (2008), identified three different approaches to change, such as

    organisational approaches, people approaches and process approaches. Firstly,

    organisational approaches to change focus on changing what the organisation is

    like. Examples of types of organisational change are; restructuring and culture

    change. Secondly, people approaches to change focus on changing the ways in

    which people work. Examples of the types of people approach are, the

    emergence of HRM and the new patterns of working. Lastly, the process

    approach to change aim to transform the ways in which organisations do things,

    that is, improve the processes that they employ to conduct their business,

    examples are business process re-engineering and knowledge management

    19

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    20/37

    2.1 The DST approach to change

    .According to Recklies (2001) change is the continuous adoption of corpoprate

    strategie and structure to changing external conditions. Change in the life of an

    organisation is unavoidable and there are many forces which make the changes

    not only desirable but also inevitable such as technological, economic, political,

    social, legal, international and labour market environment. Sturges (2008)

    mentioned that the types of change made by organisations in response to

    globalization, technological advances and increased competition have been to

    restructure themselves in an attempt to operate more efficiently.

    The DST has responded similarly in order to improve their performance as they

    have come under pressure to do so. The major force behind the change was

    political, due to the Departments separation from the then Arts and Culture,

    Science and Technology Department, and the appointment of the new Minister

    and the Director-General. The DST structure has always had five Programmes

    since its separation from the Department of Arts and Culture, Science andTechnology in 2003. Late in 2004, the DST planned to restructure the

    department to improve its effectiveness and performance in achieving its

    objectives.

    The discussion below will describe and analyse the change process followed.

    2.2 The DST change process

    The purpose of restructuring in DST was to introduce a new Programme called

    Science and Technology Expert Services (SciTEs) . The new programme was to

    house all the scientists scattered in the five DST Programmes. The main purpose

    for the change was to have all science and technology experts in one programme

    20

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    21/37

    for a coordinated and easy access to their services. The experts will handle only

    work related to their expertise. The Programme was to work like self-managed

    teams with a coordinator, the Deputy Director-General. In analysing the change

    process at DST, Erwin (2009) change process will be used.

    2.2.1 Phase 1: Realising the need for change

    The Director-General (DG) realized the need for change as a result of lack of

    coordination of efforts and work from the five Programmes at DST. The DG as

    the head of the Department and the champion of change for organisational

    change, met together with senior management, and the decision for change was

    taken in one of the Executive Committee (EXCO) meetings. Only the DG and the

    Top managers attend these meetings. The intention for change was

    communicated only to the affected managers (experts) who will be relocated to a

    new Programme as well as the Chief Directors under whom they report.

    Reaction to the message: Some of the affected managers did not think the

    message was good news because it would not make any difference as to where

    they are located. The unaffected staff was also not happy after hearing the newsfrom the grapevine since they would also be affected by the planned change.

    The staff meeting was called by senior management to explain the plan and how

    it will unfold.

    2.2.2 Phase 2: Planning the change

    Senior management continued to meet to develop a plan as to what needed to

    be done, when, where and how. Senior managers struggled to explain to the

    managers the importance and the difference it will make as the managers

    continued to ask questions in their struggle to understand the reason behind it all

    and what difference it would make. The issue was discussed by senior

    management every Monday in EXCO meetings. Relevant information was

    21

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    22/37

    gathered at this phase regarding the proposed change, putting together a plan as

    to what is to be done. Managers were not thoroughly involved in this phase, only

    senior managers.

    2.2.3 Implementing the change

    Once the senior management was able to establish favourable conditions and

    the right channels of communication then the plan was put into action. The

    management called a briefing session to announce the date of implementation

    and how the change will affect all the programmes and the department as a

    whole. In the implementation phase, each Programme had to release all the

    affected managers to the new Programme. The Department had planned to put

    the experts together in one physical place, working together under the SciTEs

    Deputy Director-General. The managers in SciTEs were now being challenged

    and held accountable for new levels of performance. These managers no longer

    had sub-ordinates to support them, hence they struggled in handling their admin

    work.

    2.2.4 Sustaining the change

    This phase involves continuing to improve and sustaining the change as well as

    evaluating the change. After two years, senior management saw no difference in

    the working and performance of the new programme.

    3. Section B: Ways in which the change process could have been

    improved in DST

    For the change process to be successful, the following key elements should have

    been considered:

    - The department should have in the first phase developed motivation by

    providing disconfirming data that showed the need for change, the gaps

    22

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    23/37

    between the existing and desired change. The DST needed to have open

    discussion of issues and establishing common grounds, and redefining

    responsibilities. Providing support and continuing to communicate

    priorities and new responsibilities.

    - Employees perspectives needed to be restructured to align them with the

    new vision.

    - Managers should have been involved throughout the change process to

    contribute with ideas to the change process.

    - The DST needed to evaluate new information about the impact of the

    change. Kotter (1995, 1996) cited by Erwin (2009), suggested that

    implementing change involves empowering other to act, removing

    obstacles, creating short-term wins and institutionalizing new approaches.

    - To sustain the change, the new ways of thinking about change should

    become part of the culture.

    4. Conclusion

    Any organizational change attempts make employees change their behaviour

    and unless the behavioural patterns of the members change the change will havea little impact on the effectiveness of the organization. From the above

    discussion on the change process, it is maintained that successful change

    management requires the involvement of managers and employees throughout

    the organisation to provide ideas for improvements and expertise needed to

    implement change. .

    23

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    24/37

    5. References

    Erwin, D. 2009. Changing Organisational Performance: Examining the Change

    Process. PhD. Rush University. Chicago

    Recklies, O. 2001. Managing Change: Definition and Phases in Change

    Processes.[Online]. Recklies Management project GmbH.

    Available from: http://www.themanager.org/strategy/change_phases.htm

    [Accessed on 20 February 2011]

    Sturges, J. 2008. Employee Involvement and Empowerment: study guide for

    MBA B713. Milton-Keynes: Open University

    The Open University (2007) B713 Fundamentals of Senior Management, Block

    4, The Open University.

    24

    http://www.themanager.org/strategy/change_phases.htmhttp://www.themanager.org/strategy/change_phases.htm
  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    25/37

    ANNEXURE 1 1

    25

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    26/37

    ANNEXURE 2

    26

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    27/37

    TIP Phase 1b - Budget Breakdown in relation to Project Duration

    NrProject

    Component

    17November

    Cost InRand

    IncludingVAT

    Start Date End date31-Jan-

    09R

    31-Mar-09R

    30-Jun-09R

    30-Sep-09R

    31-Dec-09R

    31-MarR

    30-Jun-10

    30-Sep-10

    R

    ConToRa

    ProjectManagement

    R1,445,000.

    00

    01 Nov2008

    30 Sept2010

    438,750.00

    143,750.00

    143,750.00

    143,750.00

    143,750.00

    143,750.00

    143,750.00

    143,750.00

    1,4

    PM 1 Projectinceptionprocess

    R295,000.00

    01 Nov2008

    31 Jan2008

    295,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    295

    PM 2 Overallprojectmanagement andco-ordinationacrossagencies

    R270,000.00

    01 Nov2008

    30 Sept2010

    33,750.00

    33,750.00

    33,750.00

    33,750.00

    33,750.00

    33,750.00

    33,750.00

    33,750.00

    270

    PM 3 Technicalprojectmanagement, co-ordination&

    internationalbenchmarking

    R500,000.00

    01 Nov2008

    30Sept2010

    62,500.00

    62,500.00

    62,500.00

    62,500.00

    62,500.00

    62,500.00

    62,500.00

    62,500.00

    500

    PM 4 Travel andsubsistance

    R250,000.00

    01 Nov2008

    30 Sept2010

    31,250.00

    31,250.00

    31,250.00

    31,250.00

    31,250.00

    31,250.00

    31,250.00

    31,250.00

    250

    PM 5 Runningandincidentalexpensesincludingprogressworkshopsandmeetingsof the

    R130,000.00

    01 Nov2008

    30 Sept2010

    16,250.00

    16,250.00

    16,250.00

    16,250.00

    16,250.00

    16,250.00

    16,250.00

    16,250.00

    130

    27

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    28/37

    projectteam

    InstitutionalSustainability

    PlanR

    550,000.00

    01 Nov2008

    30 Sept2010

    137,500.00

    137,500.00

    137,500.00

    137,500.00 0.00 0.00 0.00 0.00

    550

    ISP 1 Formaliseanagreemen

    t on anappropriate andsustainableinstitutional homefor the TIPplatformand anappropriate technical"host" forthe TIPportal.

    R100,000.00

    01 Nov2008

    30 Sept2009

    25,000.00

    25,000.00

    25,000.00

    25,000.00 0.00 0.00 0.00 0.00

    100

    ISP 2 Formalisebi-lateralagreements aroundthe uptakeand

    application of TIP. R200,000.00

    01 Nov2008

    30 Sept2009

    50,000.00 50,000.00 50,000.00 50,000.00 0.00 0.00 0.00 0.00 200

    ISP 3 ConceptDocumenton Geo-SpatialCentre ofCompetence

    R250,000.00

    01 Nov2008

    30 Sept2009

    62,500.00

    62,500.00

    62,500.00

    62,500.00 0.00 0.00 0.00 0.00

    250

    Profiler andSimulator(Technical

    enhancement,development

    and validation)

    R9,350,000.

    00

    01 Dec2008

    30 June2010

    360,000.00

    750,000.00

    1,020,000.00

    1,740,000.00

    1,840,000.00

    1,840,000.00

    1,750,000.00

    50,000.00

    9,3

    28

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    29/37

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    30/37

    for thesettlementtypologies

    LivingLaboratories

    R4,000,000.

    00

    01 Jan2009

    30 June2010

    200,000.00

    466,666.66

    666,666.67

    666,666.67

    666,666.67

    666,666.67

    666,666.67 0.00

    3,9

    LL 1 CityRegionLiving

    Laboratories in 4CityRegions

    R2,000,000.0

    0

    01 Jan

    2009

    30 June

    2010

    100,000.00

    233,333.33

    333,333.33

    333,333.33

    333,333.33

    333,333.33

    333,333.33 0.00

    2,0

    LL 2 DistrictLivingLaboratories in 4districts

    R2,000,000.0

    0

    01 Jan2009

    30 June2010

    100,000.00

    233,333.33

    333,333.33

    333,333.33

    333,333.33

    333,333.33

    333,333.33 R 0.00

    2,0

    CapacityBuilding

    R5,055,000.

    00

    01November2008

    01 August2010

    500,000.00

    807,500.00

    882,500.00

    757,500.00

    450,000.00

    450,000.00

    757,500.00

    450,000.00

    5,0

    CB 1 Dissemination of theprojectandlinkages tothe portal.(articles,brochures,web-links)

    R100,000.00

    01 Nov2008

    01 Aug2010

    12,500.00

    12,500.00

    12,500.00

    12,500.00

    12,500.00

    12,500.00

    12,500.00

    12,500.00

    100

    CB 2 Four (3day) shortcourses onthe ToolkitforIntegratedPlanning(TIP) insupport ofintegratedplanninganddevelopment.

    R1,230,000.0

    0

    01 April2010

    30 June2010

    0.00307,500.

    00307,500.

    00307,500.

    00 0.00 R 0.00307,500.

    00 0.001,2

    CB 3 Onenationalseminar

    R125,000.00

    15 June2009

    R 0.00 R 0.00

    R125,000.

    00 R 0.00 R 0.00 R 0.00 R 0.00 R 0.00125

    30

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    31/37

    CB 4 Phase 1presentations toprofessionalinstitutions, interestgroups,clustersandprovinces

    R100,000.00

    01 Nov2009

    31 Jan2009

    50,000.00

    50,000.00 0.00 0.00 0.00 0.00 0.00 0.00

    100

    CB 5 Studentships in 4 cityregionsand 4districts(Allowances)

    R2,400,000.0

    0

    01 Nov2008

    01 Aug2010

    300,000.00

    300,000.00

    300,000.00

    300,000.00

    300,000.00

    300,000.00

    300,000.00

    300,000.00

    2,4

    CB 6 CSIRIntegratedDevelopmentPlanningInternshipProgramme

    R1,100,000.0

    0

    01 Nov2008

    01 Aug2010

    137,500.00

    137,500.00

    137,500.00

    137,500.00

    137,500.00

    137,500.00

    137,500.00

    137,500.00

    1,1

    31-Jan-09 31-Mar-09 30-Jun-09 30-Sep-09 31-Dec-09 31-Mar 30-Jun-10 30-Sep-10 Control Total Ran

    Total

    R

    1,636,250.00

    R

    3,805,416.66

    R

    4,350,416.67 R 4,945,416.67

    R

    4,600,416.67 R 3,100,416.67

    R

    3,317,916.67 R 643,750.00 R 26,399,901-Mar-09 01-Mar-10 01-Sep-10

    R5,441,666.66

    R16,996,666.67 R 3,961,666.67

    R 26,399,9

    31

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    32/37

    32

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    33/37

    ANNEXURE 3

    Overall Project Programming

    The project is envisaged to unfold over the 2008/2009 and 2009/2010 financial years. The plannedstart date is 1 September 2008 and the project will conclude on 31 December 2009, which implies a

    planned duration of 16 months for IPDM Phase 2. The detailed timelines for the individual projectcomponent will be planned during the project inception phase.

    (PM) Project Management Estimated

    Timeframe

    PM1 Project inception process. September 2008

    PM2 Overall project management and co-ordination across

    agencies

    Ongoing

    PM3 Technical project management and co-ordination Ongoing

    PM4 Travel and subsistance for project meetingsand

    workshops

    Ongoing

    PM5 Running and incidental expenses including progress

    workshops and meetings of the project team

    Ongoing

    (I) Institutionalisation Estimated

    Timeframe

    I1 Formalise an agreement on an appropriate and

    sustainable institutional home for the TIP platform and an

    appropriate technical "host" for the TIP portal.

    September 2008 to

    November 2008

    I2 Formalise bi-lateral agreements around the uptake and

    application of TIP.

    September 2008 to

    March 2009I3 Concept Document on Geo-Spatial Centre of

    Competence March 2009

    (TD) National Roll Out, Technical Enhancement and

    SimulationEstimated

    Timeframe

    TD1 Portal customisation for national roll out January 2009 to

    March 2009

    TD2 National roll-out of the regional profiler. January 2009 to June

    2009

    TD3 National roll-out of city region simulator in 4 city regions March 2009 toNovember 2009

    DSD1and

    DSD3

    DSD Population Module - Collaborative UserSpecification, Interface Customisation, TIP Integration

    and Training of Trainers.

    September 2008 to

    December 2008

    (WC) Wall Chart Enhancement and Extension and Policy

    ApplicationEstimated

    Timeframe

    WC1 Wall Chart Content Enhancement: Extension &

    validation of settlement types to extend to national

    coverage

    September 2008 to

    May 2009

    33

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    34/37

    WC2 Develop Transport Demand Estimates per Settlement

    Typology Simulate alternative transport responses for thesettlement typologies

    September 2008 to

    May 2009

    DSD2 DSD Population Module - Collation and verification of

    population and information and projections for 2014 November 2008 toFebruary 2009

    (LL) Living Laboratories for Collaborative Technology

    Development

    Estimated

    Timeframe

    TT1 City-region living laboratories in 4 city-regions November 2008 toNovember 2009

    TT2 District living laboratories in 3 districts November 2008 to

    November 2009

    (TT) Dissemination, Technology Transfer and Up-Take Estimated

    Timeframe

    TT1 Dissemination of the project and linkages to the portal.Ongoing

    TT2 Three (3 day) short courses on the Toolkit for Integrated

    Planning (TIP) in support of integrated planning anddevelopment.

    March 2009 toNovember 2009

    TT3 Roadshow of 4 TIP Launch Seminars September to

    October 2008

    TT4 Phase 1 presentations to professional institutions, interest

    groups, clusters and provinces

    September 2008 to

    December 2009

    TT5 CSIR Integrated Development Planning Internship

    Programme

    Sept 2008 to Dec

    2009

    These timelines are only indicative and will be refined on the basis of input from DST during the

    project inception phase.

    34

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    35/37

    35

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    36/37

    36

  • 8/7/2019 Marked Assignment 1 - MATILDA ANNAH NYALUNGU

    37/37