Mapping Networks for Day 3 Management

29
Mapping Networks For Day 3 Management Mark Dansie, IT Infrastructure Consultant Inflectiontech Ltd [email protected] www.inflectiontech.net David Cuthbertson, Director Square Mile Systems Ltd [email protected] www.squaremilesystems.com

description

Management techniques and processes are still lagging behind the technology, whilst network infrastructure is constantly evolving to meet increasing data volumes and mission criticality. It is no surprise then that many companies experience unplanned disruption and increasing project lead times – as the increasing complexity often means longer planning cycles. This webcast explains the practical steps on how to achieve efficient day 3 operational management of your network infrastructure, including real Case Studies where Inflectiontech have been engaged to help customers map their networks and gain discernible benefits.

Transcript of Mapping Networks for Day 3 Management

Page 1: Mapping Networks for Day 3 Management

Mapping Networks For Day 3 Management

Mark Dansie, IT Infrastructure Consultant

Inflectiontech Ltd

[email protected]

www.inflectiontech.net

David Cuthbertson, Director

Square Mile Systems Ltd

[email protected]

Page 2: Mapping Networks for Day 3 Management

Mapping Networks For Day 3 Management?

Day 1 Planning an infrastructure– Requirements, proposals, tenders, contract award– Lots of standards!

Day 2 Building the infrastructure– Scheduling, detailed instructions, testing, verification, sign off

Day 3 Managing and Operating– Ongoing moves/adds/changes, risk management, optimisation,

transformation, outsourcing

Page 3: Mapping Networks for Day 3 Management

• Help understand systems and techniques that make mapping network / data centre infrastructure easier– Physical infrastructure – , data centres, cabinets, power, cabling– Active components – switches, routers, servers, storage, etc.– Technical groupings – LAN, VLAN, SAN, application, domain– Business groupings - Applications, services (ITIL), contracts – Automation techniques that help handle scale and complexity

• Share experiences of process and approach– Case Studies– Set realistic expectations on approach and resources required

Webinar Objectives

Page 4: Mapping Networks for Day 3 Management

© AssetGen Limited4

Inflectiontech - Square Mile Systems

Inflectiontech

UK based – London

IT Infrastructure consultancy, project andchange management

Data centre, campus and building auditing and ITS assessment services including implementation of infrastructure database(s)

Infrastructure Transformation / Engineering

Industry bodies & roles• BCS- Data Centre Specialist Group• BICSI UK Member• LinkedIn – Intelligent Building Technologies

Square Mile Systems

UK based – Cirencester

Infrastructure documentation softwareAssetGen) and Visio automation

Mapping physical and logical components and dependencies – data centres, campus, networks, applications, services

Infrastructure Change and Support

Industry bodies & roles• BCS- Configuration Management SG• BICSI UK Committee• LinkedIn – Data Center Engineering /

Data Center Operations Management

Page 5: Mapping Networks for Day 3 Management

Days 1 & 2

• Use standards / reference skills where possible• Communicate clearly

– Requirements, Proposals– Project plan(s)– Testing and verification– Ongoing support and maintenance (O&M) manuals

• Infrastructure built – everyone is happy

Page 6: Mapping Networks for Day 3 Management

Day 3 Activities

• Installing & connect equipment• Add/change some infrastructure

– New requirements & technologies– Fibre, power, copper

• Refurbish / upgrade existing infrastructure• Develop operational management systems

– Workflow and change processes– Monitoring, performance, capacity

• Re-organise teams– Centralise expertise, outtask/outsource, replace

Page 7: Mapping Networks for Day 3 Management

Sometimes We Get

Some Of The Root Cause(s)Bad design

Over length cables

Inadequate supervision

Lack of planning

Limited training

Change process

Lack of time for task

Lack of interest to fix

Fault finding

Page 8: Mapping Networks for Day 3 Management

And Occasionally We Get

A06

A05

A04

A03

A02

A01

BT-LCP01

BT-LCP02

BT-LCP03

BT-LCP04

BT-R01

BT-R02

BT-R03

BT-R04

CAB1

CAB7

CAB3

CAB19

CAB2

CAB1

Page 9: Mapping Networks for Day 3 Management

Which Results In

• Change tasks taking longer and cost more– Site surveys, emails, meetings– Increased risk of unplanned disruption– On site supervision

• Constant rechecking / auditing– Capacity of backbone and network switches– Asset verification– Inadequate records and documentation– Tracing cables with every change

• A project with Inflectiontech to get a baseline!

Page 10: Mapping Networks for Day 3 Management

Case Study 1

What – Mapping a campus environment

20+ buildings

Why – Change of managed IT service provider

Handover of support roles – understanding of current estate

Resolution of network performance issues

Site development and refurbishment

How - Assess existing sources of knowledge – none!

Naming convention – building/devices, connections

Manual audit – inventory, space, connectivity, plans

Capture into AssetGen infrastructure database

Report to both technical / non-technical people

Page 11: Mapping Networks for Day 3 Management

Case Study 1 - The Physical Reality

11

Page 12: Mapping Networks for Day 3 Management

Case Study 1

• Deliverables– Lists of equipment and configurations– Visio schematics – network, campus, rack diagrams, floor

layouts– Photos where appropriate to show installation quality and best

practice– Backbone infrastructure layout and capacity – fibre / copper

• Standards, distances, quality– Issues list

• Core fibre location not known• Remediation /testing required

Page 13: Mapping Networks for Day 3 Management

The Logical Dependency View

13

The router hasone link to the switch

Easy to Understand!

Page 14: Mapping Networks for Day 3 Management

The Physical Connection View

14

Equipment RacksMDFInter Room ODFInter Room ODFMDFEquipment Racks

E10

Q02

Q03

H06

K23

K24

I02F02 I15

E26

E22

E23

N04

Wing Loft

ODF 01ODF 12E15

PPF-326-E20-U38 to E10

PPF-336-E22-U40 to I02

PPF-336-E23-U39 to I02

PPF-336/F02-U47 PPF-336/I15-U47 to ODF12PPF-336/I02-U47

to F02

PPF-336-I02-U40 to E22

PPF-326-I02-U39 to E23

PPF-336-I02-U38 to E20

PPF-326-H06-U45 to E10

PPF-326-K23-U46 to E10

PPF-326-K24-U42 to E10

PPF-326-N04-U41 to E10

PPF-326-Q02-U44 to E10

PPF-326-Q03-U43 to E10

PPF-300/ODF12-U42 to 336/I15

PPF-300/ODF01-U47

PPF-326-E15-U47 to 300

ODF01

PPF-326-E10-U46 to K23

PPF-326-E10-U45 to H06

PPF-326-E10-U44 to Q02

PPF-326-E10-U43 to Q03

PPF-326-E10-U42 to K24

PPF-326-E10-U41 to N04

Data Hall 1 Data Hall 2

10

09

08

07

06BA05

04

03

0201

01

MD

A2

MD

A1

77

50(S

R12

)

CF

M1

CF

M2

02 B 08

07

06A05

04

03 09

10

23 4

657 8

19 10

MD

A1

0S

FP

Em

pty

23 4

657 8

19 10

MD

A1

0S

FP

23 4

657 8

19 10

MD

A1

0S

FP

MD

A1

0G

LW

/LR

1

MD

A1

0G

LW

/LR

1

Em

pty

Em

pty

test

10

09

08

07

06BA05

04

03

0201

01

MD

A2

MD

A1

77

50(S

R12

)

CF

M1

CF

M2

02 B 08

07

06A05

04

03 09

10

23 4

657 8

19 10

MD

A1

0S

FP

Em

pty

23 4

657 8

19 10

MD

A1

0S

FP

23 4

657 8

19 10

MD

A1

0S

FP

MD

A1

0G

LW

/LR

1

MD

A1

0G

LW

/LR

1

Em

pty

Em

pty

test

Comms A

Page 15: Mapping Networks for Day 3 Management

Case Study 2

What – Mapping multi-site server/equipment rooms 50+

Why – Server and network refresh

Migration to IP telephony

Remediation – safety issues, cooling, power

Increased focus on security and governance

How - Assess existing sources of knowledge – some data

Naming convention – building/devices, connections

Manual audit – environment, inventory, space, ports

Capture into AssetGen infrastructure database

Updated their information sets

Page 16: Mapping Networks for Day 3 Management

Case Study 2 - The Physical Reality

16

Page 17: Mapping Networks for Day 3 Management

Case Study 2

• Deliverables– Lists of equipment and rack positioning– Assessment of power sockets and UPS loads – before/after– Assessment of cooling capacity– Rack power delivery – redundancy and options– Energy efficiency of layout and cooling system set points– Photos and videos where appropriate to show installation quality

and best practice – Issues list – overcome current challenges – short term– New design and comparison against internal best practice needs

Page 18: Mapping Networks for Day 3 Management

And In The Next 10 Years

• We’ll all probably have different jobs/roles• Removing “physical” constraints will continue

– Computing, networks, storage, applications

• More efficient use of power and resources• Fewer people, less change - memory leakage• Even less tolerance of system disruption• Increasing sets of controls – just to make sure..• Another few visits from Inflectiontech

Develop policy, best practices and support systems!

Page 19: Mapping Networks for Day 3 Management

1. Reduced time and cost to implement changes

2. Faster time to identify and resolve faults

3. Common understanding of change risks and impacts across project and operations teams

4. Improved interfaces between technical teams, outsource partners and 3rd party suppliers

5. Separate design, build and operate teams - system

6. Infrastructure capacity management and optimisation

7. Maintenance of risk management and recovery systems

Reasons To Map Network Infrastructure

Overloading on spreadsheets and diagrams doesn’t work!

Page 20: Mapping Networks for Day 3 Management

© AssetGen Limited20

One Device - Multiple ViewsClaims

Processing

Payment Module

ACCOUNTS

Accounts Module

SVRWIN001

Accounts Payable

Accounts Receivable

PAYROLL

Sage Payroll

Payroll

SW-BHAM-CORE1

SW-BHAM-CORE2

SW-BHAM-01 SW-BHAM-03 SW-BHAM-05 SW-BHAM-02SW-BHAM-04SW-BHAM-06

UK_BIRM_UX01 UK_BIRM_UX02 UK_BIRM_UX09 UK_BIRM_UX04UK_BIRM_UX05 UK_BIRM_UX03 UK_BIRM_UX06 UK_BIRM_UX07 UK_BIRM_UX08 UK_BIRM_UX10

99999

99999

UK_BIRMCC_PDU1

UK_BIRMCC_PDU2

PWR01-03-A

PWR01-04-A

PWR01-05-A

PWR01-06-A

PWR01-07-A

PWR01-03-B

PWR01-04-B

PWR01-05-B

PWR01-06-B

PWR01-07-B

UK_BIRM_UX01 UK_BIRM_UX02 UK_BIRM_UX09 UK_BIRM_UX10 UK_BIRM_UX03 UK_BIRM_UX04

UK_BIRM_UX05

UK_BIRM_UX06

UK_BIRM_UX07

UK_BIRM_UX08

PP01-02-01

RTR-BHAM-01

PWR01-02-A

PWR01-02-B

NTU-BHAM-01

NTU-TEST03

Floor Plan

Rack Position

Application/Service impact

Power Supply

Network Connections

BLADE_BIRM01

UK

_BIR

M01

_BLA

DE

-01

UK

_BIR

M01

_BLA

DE

-02

UK

_BIR

M01

_BLA

DE

-03

UK

_BIR

M01

_BLA

DE

-04

BLA

DE

-BIR

M0

1.BL

AD

E-S

W1

BLA

DE

-BIR

M0

1.BL

AD

E-S

W2

UK

_BIR

M01

_BLA

DE

-05

UK

_BIR

M01

_BLA

DE

-09

UK

_BIR

M01

_BLA

DE

-10

UK

_BIR

M01

_BLA

DE

-12

H/W Build

Page 21: Mapping Networks for Day 3 Management

Complex Devices - Chassis

Equipment build- Chassis- Cards- Power supplies- Connection types- Firmware- Software

21

Page 23: Mapping Networks for Day 3 Management

Fixed Infrastructure(Cabling, Power, Cabinets, Rooms, Buildings)

Hardware Infrastructure PCs, Network, Servers, UPS, Storage, Other

Virtual InfrastructurePCs, Network, Servers, Storage, DBMS

ApplicationsPC, server, mainframe, SOA

ServicesEnd user, infrastructure, supplier

Business ProcessesDepartmental, Company

Inventory & ConnectivityMapping

“Connect”

System & ServiceMapping

“SysMap”

SQL Server platform

The AssetGen System

Page 24: Mapping Networks for Day 3 Management

Integrating Processes & Data Sets

© AssetGen Limited25

Planning / AuditsLocation and positionResource reservation for projectsPhysical connectivityAudits and manual data gatheringImpacts and dependenciesAdds, moves and changes

AssetGen

Visio

Visio

Excel

Visio

AssetGen Outputs

Capacity management – space, power, connectivity

Inventory extractsCustom reporting

Physical plansFloor and rack diagrams

Topology diagramsNetworks, power, storage

System & Architecture MapsITIL services, applications

Change impact analysis – impact, risk, audit trails

Outputs

Updates

References

Word

Trusted sourcesDiscovery systemsMonitoring toolsService desk CMDBSpreadsheets – risk, contractsRecovery plansProject handover

Excel VisiodB

Page 25: Mapping Networks for Day 3 Management

What Day 3 Should Look Like

1. Established policies, standards and ownership Makes it easy for engineers

2. Project / operations use common terms & formats Common templates, naming system, labels, etc.

3. Less documents / files to maintain Use of centralised systems and internal portals

Visio diagrams, reports, Excel from infrastructure databases

4. Infrastructure knowledge is maintained by process

Page 26: Mapping Networks for Day 3 Management

Overcoming “The Barrier”

Plan Build Operate Risk Dispose

Project and task Manage and Coordinate

ExamplesProject documentationEquipment listsVisio/CAD diagramsTest results

ExamplesAsset and Inventory managementBusiness / service dependenciesMonitoring of performance, statusInfrastructure portal

Ease and speed of creationEase of distributionFlexible to meet task needsLimited training

Ease of use by manyStructured for integration & reportingSupport for multiple processesWide scope – the big picture!

27

The “Barrier”

Page 27: Mapping Networks for Day 3 Management

What to Aim For

© Square Mile Systems28

While you sleep

Changes to the IT systems and infrastructure are updated into various Visio diagrams and Excel outputs overnight – automatically!

On day 3, 4, 5, 6 and for ever…..

Page 28: Mapping Networks for Day 3 Management

Mapping Networks For Day 3 Management

29

• Defined naming conventions across the enterprise• Defined equipment, groupings and lifecycle processes• Replacement of Excel with database driven systems

– Infrastructure database for mapping complexity– Workflow (ITIL service desk, SCM/ALM)

• Presentation of data and views to suit information need– Views by building, floor, device, network, service, cable, system

• Verification processes– Manual and automated checks of both data and process

Page 29: Mapping Networks for Day 3 Management

Additional Material

www.squaremilesystems.comWebinars Visio automation, documenting cabling, etc.

Videos Free SMS Visio utilities

www.assetgen.com Evaluation software Free “DCIM/CMDB” evaluation version

Videos Visio automation, change impact analysis

www.inflectiontech.net

Case Studies Covering projects and infrastructure upgrades