Manufacturing Solutions- Yarn Dyeing
description
Transcript of Manufacturing Solutions- Yarn Dyeing
Manufacturing Solutions- Yarn Dyeing
TexManage
Yarn Dyeing Solutions
Solution Arrangement
Data Collection
ProductionPlanning
Barcode Application
Despatch
TexManage
Yarn Dyeing - Planning
Planning Flow
Receipt of Orders- External
Regular Requirements
Consolidation of Requirements
Planning Set UpDye Plan Program
Release to Production
Modify Dye Plan Program
Release Batches to Production
Plan / Order Status
TexManage
Production Planning
TexManage
Dye Plan Program
TexManage
Production Management
Production Flow
Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding Cone No Generation
Inspection & Packing
TexManage
Production Management
Dyeing Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
Lot Card
TexManage
Production Management
Dyeing Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
Lot Card
Scanner reads Lot No and Program to be run on the machine for the Shade
Scanner passes it onto the Production Monitoring (PM)
PM sends Program no to Machine PLC (possibility to be verified)
PM also captures time, employee information for the batch under production
ERP System
TexManage
Production Management
Dye House Production
The details of production information include Vessel, batch, shade, lot, employee, cycle time, quantity
The information can be manually entered or automatically through Production Monitoring system
Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
TexManage
Production Management
Hydro Extractor/ Drier Production
Production entry is required for statusDetails like date and time/ shift is sufficientManual entry or scanning lot cards and passing on to a PM device attached to these
machines
Cone Winding Production
Production information: machine, count, employee, opening stock/ closing stock/ no. of cones, or total cone production, and other details like employee, worked time, speed and stoppage details
Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
TexManage
Production Management
Inspection
Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
Lot Card
Scanner reads Lot No and Cone No and sends it to Computer
Operator enters Cone status after Inspection like Pass, Rejection
Rejected Cones will be barred from Despatches
TexManage
Production Management
Packing
After Inspection, Cones are packed
A box contains only one quality (count), whereas can have multiple shades, including a filler when necessary from the same count
All details of boxes are entered into a system and Carton No generated
Generated Carton No and other details are written on the paperboard as well as the polythene bag
While generating Carton No. all important conditions have to checked like min quantity, depot, etc.
Grey Yarn Receipt
Dye Spring Winding
Release of Lot/ Batch
DyeingHydro ExtractionDriers
Cone Winding
Cone No Generatio
n
Inspection & Packing
TexManage
Despatches
Despatch Flow
Move to Stock Stock Maintenance
Prepare for DespatchDespatch
TexManage
Thank you
40, Thasami Park, Singanallur, Coimbatore -641 005Ph: +91 422 3233345 Fax: +91 422 4348479Email: [email protected], [email protected]: [email protected]