2/28/2011
1
MANAJEMEN INTEGRASI PROYEK
- APK -
TUJUAN PAPARAN
Mahasiswa/i dapat memahami proses-proses yang dibutuhkan dalam mengintegrasikan proyek.
Memahami isi project charter dan cara membuatproject charter
Mengenal tools dan teknik-teknik yang dapat digunakandalam Manajemen Integrasi Proyek
Memahami pentingnya melakukan stakeholder analysis

2/28/2011
2
REVIEW
9 Area Pengetahuan Manajemen Proyek
MANAJEMEN INTEGRASI PROYEK
Manajemen Integrasi Proyek adalah tiang penyanggayang mempengaruhi dan dipengaruhi oleh seluruhknowledge area dalam Manajemen Proyek
Manajemen Integrasi Proyek melibatkan koordinasiseluruh knowledge area dalam project life cycle
Manajemen Integrasi Proyek, merupakan salah satukompetensi yang harus dimiliki oleh Manajer Proyek

2/28/2011
3
KUNCI UTAMA KEBERHASILAN PROYEK :MANAJEMEN INTEGRASI PROYEK YANG BAIK
Manajer Proyek harus mampu mengintegrasikan seluruhknowledge area selama project life cycle berlangsung
Kebanyakan manajer proyek terlalu berfokus pada hal-
hal yang detail tetapi melupakan big picture dari
proyek yang sedang dikerjakan
Manajemen Integrasi Proyek, bukanlah integrasiperangkat lunak
Manajemen Integrasi Proyek: termasuk Interface Management (identifikasi dan manajemen poin-poininteraksi antar elemen-elemen dalam proyek)
FRAMEWORK FOR PROJECT INTEGRATION MANAGEMENT

2/28/2011
4
PROSES UTAMA DALAM INTEGRASI MANAJEMEN PROYEK
1. Membangun Project Charter
2. Membangun Preliminary Scope Statement
3. Membangun Project Management Plan
4. Mengarahkan dan mengelola eksekusi proyek
5. Monitoring & kontrol proyek
6. Integrated Change Control
7. Menutup Proyek
Catatan : Koordinasi & Komunikasi, sehingga gambaran umum proyek tetap terjaga
1. MEMBANGUN PROJECT CHARTER
Project Charter adalah dokumen formal yang
menyatakan keberadaan sebuah proyek dan
memberikan arahan akan tujuan dan manajemenproyek.
Input:
Kontrak proyek
statement of work (menggambarkan produk/servis yang harus dibuat)
enterprise environmental factors (struktur organisasi, budayaorganisasi,dsb)
organizational process assets (aturan yang berlaku, prosedur, sistem keuangan, dsb)

2/28/2011
5
INFORMASI DALAM PROJECT CHARTER
Nama Proyek & masa berlaku proyek
Nama Manajer Proyek beserta informasinya
Ringkasan jadwal proyek
Ringkasan budget proyek
Gambaran singkat mengenai tujuan proyek, termasukkebutuhan bisnis, dan justifikasi lainnya
Ringkasan pendekatan dalam manajemen proyek(kebutuhan stakeholders, asumsi, batasan)
Tugas umum dari masing-masing anggota tim proyek
Tanda tangan key project stakeholders
Kolom komentar yang disediakan agar dapat diisi olehstakeholder
CONTOH
PROJECT
CHARTER

2/28/2011
6
CONTOH
PROJECT
CHARTER
(LANJ)
2. MEMBANGUN PRELIMINARY SCOPE STATEMENT
Scope statement adalah dokumen yang digunakan untukmembangun dan mengkonfirmasikan pemahaman
bersama akan ruang lingkup/batasan proyek.
Informasi penting:
tujuan proyek
deskripsi produk/servis
kriteria produk yang akan diterima
asumsi dan hambatan terhadap proyek
struktur organisasi
resiko
jadwal
gambaran awal biaya

2/28/2011
7
3. MEMBANGUN PROJECT MANAGEMENT PLAN
Project management plan adalah dokumen yang dapatdigunakan untuk mengkoordinasikan semua dokumenperencanaan proyek dan menjadi panduan eksekusi dankontrol proyek
Mendokumentasikan asumsi dan keputusanperencanaan proyek; memfasilitasi komunikasi antarstakeholders; mendefinisikan content, extent, danwaktu; menyediakan baseline pengukuran progress dankontrol proyek
Harus dinamis, fleksibel, dapat berubah sesuaiperubahan lingkungan proyek
INFORMASI DALAM PROJECT MANAGEMENT PLANS
Gambaran umum proyek(nama proyek, deskripsi, nama sponsor, nama PM dan anggota tim, hasilproyek, material penting, definisi dan akronim)
Deskripsi bagaimana proyek diorganisir(struktur organisasi, tanggung jawab, informasi lain)
Proses-proses manajemen dan teknis dalam proyek(tujuan manajemen, kontrol proyek, manajemen resiko, staf proyek, prosesteknis)
Pekerjaan-pekerjaan yang harus dilakukan, jadwal daninformasi biaya proyek(paket kerja utama, hasil utama, informasi lain; rangkuman jadwal danbudget, jadwal dan budget detail, informasi lain)

2/28/2011
8
CONTOH OUTLINE SOFTWARE PROJECT MANAGEMENT PLAN
(SPMP)
Project Management Plan Sections
IntroductionProject
OrganizationManagerial
ProcessTechnical Process
WorkPackages, Schedule,
and Budget
Section topics
Project
overview;
project
deliverables;
evolution of
the SPMP;
reference
materials;
definitions and
acronyms
Process model;
organizational
structure;
organizational
boundaries and
interfaces;
project
responsibilities
Management
objectives and
priorities;
assumptions,
dependencies,
and
constraints;
risk
management;
monitoring and
controlling
mechanisms;
and staffing
plan
Methods, tools,
and
techniques;
software
documentation;
and project
support
functions
Work
packages;
Dependencies;
resource
requirements;
budget and
resource
allocation;
and schedule
WHAT THE WINNERS DO
"The winners clearly spell out what needs to be done in a project, by
whom, when, and how. For this they use an integrated toolbox,
including PM tools, methods, and techniques…If a scheduling template is developed and used over and over, it becomes a
repeatable action that leads to higher productivity and lower uncertainty. Sure, using scheduling templates is neither a
breakthrough nor a feat. But laggards exhibited almost no use of the templates. Rather, in constructing schedules their project managers started with a clean sheet, a clear waste of time."
Milosevic, Dragan and And Ozbay. “Delivering Projects: What the Winners Do.” Proceedings of the Project Management Institute Annual Seminars & Symposium (November 2001)

2/28/2011
9
STAKEHOLDERS ANALYSIS
Dokumen stakeholder analysis merupakan dokumenyang penting (dan sensitif), karena memberikaninformasi mengenai stakeholder berkaitan dengan :
nama dan organisasi stakeholder
peranannya dalam proyek
fakta-fakta unik mengenai stakeholder
level keterlibatannya dan ketertarikannya akan proyek
saran-saran untuk menjaga relasi dengan stakeholder
CONTOH ANALISIS STAKEHOLDERS
Key Stakeholders
Ahmed Susan Erik Mark David
OrganizationInternal senior
managementProject team Project team Hardware vendor
Project manager
for other internal
project
Role on project
Sponsor of
project and one
of the company's
founders
DNA sequencing
expertLead programmer
Supplies some
instrument
hardware
Competing for
company
resources
Unique facts
Demanding, likes
details, business
focus, Stanford
MBA
Very smart, Ph.D.
in biology, easy
to work with, has
a toddler
Best programmer
I know, weird
sense of humor
Start-up
company, he
knows we can
make him rich if
this works
Nice guy, one of
oldest people at
company, has 3
kids in college
Level of interest Very high Very high High Very high Low to medium
Level of
influence
Very high; can
call the shots
Subject matter
expert; critical to
success
High; hard to
replace
Low; other
vendors availableLow to medium
Suggestions on
managing
relationship
Keep informed,
let him lead
conversations ,do
as he says and
quickly
Make sure she
reviews
specifications
and leads testing;
can do some work
from home
Keep him happy
so he stays;
emphasize stock
options; likes
Mexican food
Give him enough
lead time to
deliver hardware
He knows his
project takes a
back seat to this
one, but I can
learn from him

2/28/2011
10
4. MENGELOLA EKSEKUSI PROYEK
Eksekusi Proyek adalah tahap melaksanakan pekerjaanyang telah digambarkan dalam project plan
Mayoritas waktu dan uang digunakan dalam eksekusiproyek
Area aplikasi proyek sangat mempengaruhi eksekusiproyek, karena selama eksekusi proyek inilah produkdari proyek dihasilkan
Those who will do the work should plan the work
KETRAMPILAN PENTING DALAM EKSEKUSI PROYEK
Kepemimpinan
Komunikasi
Politik
Kemampuan menggunakan tools dan techniques
Work Authorization System: menjamin orang yang memiliki kualifikasi yang cukup, melakukan pekerjaan yang tepat, pada waktu yang tepat dan dengan urutan yanag benar
Status Review Meetings: rapat terencana dan terjadwal yang digunakan untuk saling bertukar informasi mengenai proyek yang sedang berjalan
Project Management Software: perangkat lunak khusus yang digunakan dalam manajemen proyek

2/28/2011
11
5. MONITORING & KONTROL PROYEK
Termasuk di dalamnya mengumpulkan, mengukur danmenyebarkan informasi kinerja proyek
Tools & technique yang dapat digunakan antara lain metodologi manajemen proyek, sistem informasimanajemen proyek, expert judgement dan earned value management
Input penting: rencana manajemen proyek, informasiperformansi kerja, laporan performansi, dan permintaanperubahan
Output penting: rekomendasi tindakan korektif(meningkatkan kinerja proyek) dan preventif (mereduksiprobabilitas konsekuensi negatif).
6. INTEGRATED CHANGE CONTROL
Termasuk di dalamnya mengidentifikasi, mengevaluasidan mengelola perubahan selama project life cycle
Tujuan utama pengendalian perubahan :
Memperhitungkan faktor-faktor yang mengakibatkanperubahan dalam rangka menjamin bahwa perubahanmenguntungkan (cross check scope, time, cost & quality)
Menentukan apakah perubahan sudah terjadi
Mengelola perubahan yang terjadi
Baseline is the approved project management plan plus approved changes

2/28/2011
12
PROSES INTEGRATED CHANGE CONTROL
KONTROL PERUBAHAN DALAM PROYEK IT
Pandangan lama: Tim Proyek harus melakukan apa yang sudah direncanakan tepat waktu dan tepat biaya
Masalahnya: Stakeholders jarang sekali menyetujui batasan proyek di awal, serta waktu dan estimasi biaya seringkali tidak akurat
Pandangan Modern: Manajemen Proyek adalah proses
komunikasi dan negosiasi yang konstan
Solusi: Perubahan seringkali memberikan keuntungan dan tim proyek harus membuat rencana untuk mengakomodasi perubahan tersebut
Contoh: harga-harga hardware

2/28/2011
13
SISTEM KONTROL PERUBAHAN
Adalah proses yang terdokumentasi yang menggambarkan kapan dan bagaimana dokumen-dokumen proyek dan pekerjaannya dapat diubah
Menggambarkan orang yang berwenang untukmembuat perubahan dan bagaimana cara membuatperubahan tersebut
Seringkali melibatkan Change Control Board(CCB), manajemen konfigurasi dan proses untukmengkomunikasikannya
CHANGE CONTROL BOARD
Kelompok formal dari orang-orang yang bertanggungjawab untuk menyetujui atau menolak perubahandalam proyek
CCB harus memberikan panduan untuk mempersiapkanperubahan, mengevaluasi perubahan dan mengelolaimplementasi perubahan yang disetujui
Anggota CCB biasanya terdiri atas stakeholders darikeseluruhan organisasi
Masalah yang dihadapi: CCB jarang bertemu danmembuat keputusan akan perubahan membutuhkanwaktu rapat yang panjang, padahal proyek harus terusberjalan karena dibatasi oleh waktu yang telahdisepakati

2/28/2011
14
MANAJEMEN KONFIGURASI
Cara menjamin bahwa deskripsi dari produk yang
dihasilkan sudah benar dan lengkap
Berkonsentrasi pada identifikasi dan mengendalikankarakteristik produk berdasarkan fungsional dan desainfisik produk
Spesialis manajemen konfigurasi bertugas untukmengidentifikasi dan mendokumentasikan kebutuhankonfigurasi, mengendalikan perubahan, mencatat danmelaporkan perubahan, serta audit produk-produk
dalam rangka verifikasi kesesuaiannya denganrequirements
SARAN-SARAN DALAM KONTROL PERUBAHAN
Pandanglah manajemen proyek sebagai sebuah proseskomunikasi dan negosiasi yang konstan
Rencanakan menghadapi perubahan Bentuklah sistem kontrol dan CCB
Manfaatkan manajemen konfigurasi
Definisikan prosedur agar pengambilan keputusan akanperubahan kecil dapat dilakukan dengan segera
Gunakan laporan lisan dan tulisan untukmengidentifikasi dan mengelola perubahan
Gunakan manajemen proyek dan perangkat lunakuntuk memudahkan mengelola dan mengkomunikasikanperubahan

2/28/2011
15
7. PENUTUPAN PROYEK
Hal yang harus dilakukan : mengakhiri semua aktivitas
dan menyampaikan hasil kerja proyek (tuntas/tidak) pada orang yang tepat
Output utama dari penutupan proyek :
prosedur administratif penutupan
prosedur penutupan kontrak
produk akhir
organizational process asset updates
TUGAS KECIL (PERORANGAN)
Apa yang dimaksud dengan WBS (Work Breakdown Structure)?
Bagaimana cara membuat WBS?
Buatlah WBS 3 level dari proyek tugas besar kelompokAnda masing-masing!
Lakukan stakeholder analysis untuk seluruh anggota timproyek!

2/28/2011
16
TERIMA KASIH..