Managing Leachate SeepsBelow Final Cover
Ali Khatami, Ph.D., P.E.SCS Engineers
S C S E N G I N E E R S
Leachate Seeps
• Many reasons for leachate seeps
• Operator manages leachate seeps while slope unclosed
• Various means and methods for management of leachate seeps
• Full closure and leachate seeps
• Partial closure and leachate seep
2
S C S E N G I N E E R S
Leachate Seeps Below Geomembrane
S C S E N G I N E E R S
Leachate Toe Drain System
(LTDS)
3
S C S E N G I N E E R S
Location of LTDS
S C S E N G I N E E R S
Leachate at Toe of Slope
4
S C S E N G I N E E R S
Leachate Pool at Perimeter Berm
S C S E N G I N E E R S
Removing Leachate by Vac Truck
5
S C S E N G I N E E R S
Vac Truck
S C S E N G I N E E R S
Exposing Anchor Trench
6
S C S E N G I N E E R S
Excavating Overfill
S C S E N G I N E E R S
Excavating Overfill
7
S C S E N G I N E E R S
Grading Slope
S C S E N G I N E E R S
Graded Slope
8
S C S E N G I N E E R S
Graded Slope
S C S E N G I N E E R S
Graded Slope
9
S C S E N G I N E E R S
LTDS Geocomposite Deployment
S C S E N G I N E E R S
LTDS Geocomposite
10
S C S E N G I N E E R S
LTDS Geocomposite
S C S E N G I N E E R S
Anchor Trench Excavation
11
S C S E N G I N E E R S
Anchor Trench for LTDS Geocomposite
S C S E N G I N E E R S
Bottom of LTDS Geocomposite
12
S C S E N G I N E E R S
Extension of LTDS Geocomposite
S C S E N G I N E E R S
Extended LTDS Geocomposite on Slope
13
S C S E N G I N E E R S
Anchor at High End of Seep
S C S E N G I N E E R S
Connection Points to Cleanouts
14
S C S E N G I N E E R S
Connection Point to Sump Riser
S C S E N G I N E E R S
Connection Point to Sump Riser
15
S C S E N G I N E E R S
Deployment of LTDS Geotextile
S C S E N G I N E E R S
LTDS Pipe Placement
16
S C S E N G I N E E R S
Vertical Pipe
S C S E N G I N E E R S
LTDS Pipe Placement
17
S C S E N G I N E E R S
Vertical Pipe
S C S E N G I N E E R S
LTDS Pipe Connection to Cleanout Pipe
18
S C S E N G I N E E R S
Connection of LTDS Pipe to Sump Riser
S C S E N G I N E E R S
Connection of LTDS Pipe to Sump Riser
19
S C S E N G I N E E R S
Connection of LTDS Pipe to Sump Riser
S C S E N G I N E E R S
LTDS Gravel Placement
20
S C S E N G I N E E R S
Forming Gravel around LTDS Pipe
S C S E N G I N E E R S
LTDS Gravel Placement
21
S C S E N G I N E E R S
LTDS Gravel Placement
S C S E N G I N E E R S
Gravel at End of LTDS Pipe
22
S C S E N G I N E E R S
Closing LTDS Burrito
S C S E N G I N E E R S
Placement of Soil Above LTDS Burrito
23
S C S E N G I N E E R S
Soil Above LTDS Burrito
S C S E N G I N E E R S
LTDS at Completion
24
S C S E N G I N E E R S
LTDS Pipe at Cell Construction Time
S C S E N G I N E E R S
LTDS Drain Pipes
25
S C S E N G I N E E R S
LTDS Drain Pipe into Leachate Sump
S C S E N G I N E E R S
LTDS Drain Pipe into Leachate Sump
26
S C S E N G I N E E R S
LTDS Drain Pipe into Leachate Sump
S C S E N G I N E E R S
Sump and LTDS Drain Pipe
27
S C S E N G I N E E R S
LTDS Drain Pipe at Leachate Sump
S C S E N G I N E E R S
LTDS Drain Pipe into Leachate Corridor
28
S C S E N G I N E E R S
Closed Burrito
S C S E N G I N E E R S
Cover Geomembrane Welded toBottom Geomembrane
29
S C S E N G I N E E R S
Cover Geomembrane Welded toBottom Geomembrane
S C S E N G I N E E R S
Granular Bentonite Over Extrusion Weld
30
S C S E N G I N E E R S
Granular Bentonite Over Extrusion Weld
S C S E N G I N E E R S
GCL Strip Over Granular Bentonite
31
S C S E N G I N E E R S
GCL Strip Over Granular Bentonite
S C S E N G I N E E R S
GCL Strip Over Granular Bentonite
32
S C S E N G I N E E R S
GCL Strip Over Granular Bentonite
S C S E N G I N E E R S
Cover Soil Placement
33
S C S E N G I N E E R S
Slope Final Condition
S C S E N G I N E E R S
Slope Final Condition
34
S C S E N G I N E E R S
Benefits of LTDS
• Collects and removes leachate below final cover geomembrane
• Eliminates ponding of leachate below final cover geomembrane at toe of slope
• Provides gas collection at toe of slope
• Connects to leachate collection sump, sump riser, or cleanouts
• Addresses aggressive leachate seeps on slope
S C S E N G I N E E R S
Construction Recommendations
• Construct LTDS and drain pipes at time of cell development
• Set LTDS pipe invert below top of berm
• Leave no sand between LTDS geocomposite and LTDS geotextile
• Construct vertical pipes for future connection to gas system
• Do not use sacrificial geomembrane over LTDS, use geotextile to allow infiltration